DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.

Slides:



Advertisements
Similar presentations
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Advertisements

GridPP Meeting, Cambridge, 15 Feb 2002 Paul Mealor, UCL UCL Testbed 1 status report Paul Mealor.
Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 1 Marc Kelly University of Bristol.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Réunion DataGrid France, Lyon, fév CMS test of EDG Testbed Production MC CMS Objectifs Résultats Conclusions et perspectives C. Charlot / LLR-École.
DataGrid is a project funded by the European Union 22 September 2003 – n° 1 EDG WP4 Fabric Management: Fabric Monitoring and Fault Tolerance
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
GRID Workload Management System Massimo Sgaravatto INFN Padova.
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
WP9 – Earth Observation Applications – n° 1 Experiences with Testbed1, plans and objectives for Testbed 2 Testbed retreat th August 2002
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
Nightly Releases and Testing Alexander Undrus Atlas SW week, May
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
Olof Bärring – WP4 summary- 4/9/ n° 1 Partner Logo WP4 report Plans for testbed 2
CMS Stress Test Report Marco Verlato (INFN-Padova) INFN-GRID Testbed Meeting 17 Gennaio 2003.
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
CERN IT Department t LHCb Software Distribution Roberto Santinelli CERN IT/GS.
December 26, 2015 RHIC/USATLAS Grid Computing Facility Overview Dantong Yu Brookhaven National Lab.
Yannick Patois - Datagrid Software Repository Presentation - March, n° 1 Datagrid Software Repository Presentation CVS, packages and automatic.
Software Testing Process
EMI INFSO-RI Software Quality Assurance in EMI Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL DOE/NSF Review of US LHC Software and Computing Fermilab Nov 29, 2001.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
CERN Certification & Testing LCG Certification & Testing Team (C&T Team) Marco Serra - CERN / INFN Zdenek Sekera - CERN.
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Developers’ Guide Maite Barroso 10/12/2002
CNAF - 24 September 2004 EGEE SA-1 SPACI Activity Italo Epicoco.
Work Package 9 – EO Applications
DataGrid Quality Assurance
WP4-install status update
Testbed Software Test Plan Status
LCG experience in Integrating Grid Toolkits
Report on GLUE activities 5th EU-DataGRID Conference
Porting LCG to IA64 Andreas Unterkircher CERN openlab May 2004
Presentation transcript:

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 2 Outline Test Group Description –Motivations and goals –TSTG place in DataGrid lifecycle Proposed Test Strategy –Scope –Organization TSTG activities on release 1.2 –Review of site activities –summary TSTG software : work in progress –Automatic Test Framework –Installation Scripts Summary

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 3 Motivation and Goals DataGRID middleware is rapidly evolving –Complex software –Rich in functionality Stringent schedule of software release plan –Minor releases every two months –Next major release in October, 2002 Need for continuous test activity –Check for bug-fixes –Validate added new capabilities –Identify eventual « unexpected features » A well-defined systematic approach is necessary

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 4 TSTG place in EDG release lifecycle Integration phase of a new release –Some TSTG members work at CERN in contact with IT –Get experience on test-bed at CERN prior to local site installation Test phase on tagged release –TSTG members install and configure EDG packages on local sites –Test functionality, scalability, robustness… –Provide feedback through bugzilla and interact directly with WPs Presentation of results –Produce a detailed report for each service tested –Judge on quality of the new release

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 5 Test Strategy: Scope Installation, configuration –Appreciate required effort, evaluate code portability Functionality and performance –Check conformance with the documentation –Derive performance figures, identify eventual bottlenecks Security –Trace for security holes in deployed external packages –Check for non-authenticated and unauthorized accesses, … Scalability, robustness, fault tolerance, error detection –Operate in distributed multi-user multi-site GRID environment –Operate at high loads, with malfunctioning services, … Provide feedback to WPs

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 6 Test Group Organization Test Strategy and Plan have been elaborated –Draft on EDMS repository will be upgraded with the feedback provided by WP people Test Group people –Up to now the following sites are contributing to TSTG: IN2P3/LPC, IN2P3/CPPM, CS-SI, CEA/Saclay, IFAE –Precious contribution of R. Tordeux (CERN) Test Group activity for release 1.2 (not yet tagged) –Review from every site Responsibilities splitted among the test sites

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 7 Test Group Sites IN2P3/LPC –18 PCs : MHz, MB memory, 200 GB disks –SE, RC CPPM/CNRS and CS-SI –4 PCs: MHz, MB memory, GB disks –AAA and Information services, UI CEA/Saclay –6 PCs: MHz, MB memory, GB disks –CE, Workload Management, Myproxy IFEA –5 PCs: MHz, MB memory, ~1TB HD –LCFG, SE (GDMP + SpitFire)

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 8 Site : IN2P3/LPC Site configuration –2 SE –1 RC Status –Deployment of SE and RC started but not completed –No functional test performed on local site –Site resources are available for deployment and tests only ~15days/2months Problems encountered –No stable release: RPM lists not ready –Non-accurate documentation –Problems in configuration of SE

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 9 Site : CEA/Saclay Site configuration –CE: fork gatekeeper + pbs gatekeeper with 4 Worker Nodes –WMS: RB+JSS+LB with 2 UI –Myproxy Status –Myproxy services deployed and tested: report submitted –WMS is under deployment: reports in progress Problems encountered –No stable release: RPM lists not ready –Myproxy: poor documentation, security problems –WMS: so far some unexpected behaviour observed Scripts for automatic deployment in progress

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 10 Site : CPPM/CNRS Site –Security management packages –MDS, Ftree (Globus) Status –Security and Authentication functionality work fine –Information Services deployed: GIIS and GRIS configured Functional tests performed and reported Problems encountered –No stable release: RPM lists not ready –No time to test all functionality, the frequency of package upgrade is faster than their installation! –Non-accurate documentation –IS: so far some unexpected behaviour observed

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 11 Site : IFAE Site –LCFG server –GDMP + 2 SEs Status –LCFG deployment completed: functional test in progress –GDMP stucked on configuration issues Problems encountered –No stable release: RPM lists not ready –GDMP configuration for SE not stable Plug-in for test framework in progress Replica Manager and SpitFire deployment will start soon

DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group Work Status 12 Summary Status of TSTG work on EDG release 1.2 –The release is not yet tagged –Nevertheless its deployment on test sites has already started –Functional tests were performed when possible –First reports are available on marianne web page Status of TSTG test framework and software tools –R. Tordeux has delivered a first version of test framework –Flexible framework to plug service specific tests –IFAE and CS sites provided plug-in tests –Tools for downloading and deployment under development Future –Complete deployment and functional test on release 1.2 –Automate test if possible