OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director.

Slides:



Advertisements
Similar presentations
DOE Office of Science Budget Overview
Advertisements

Tony Gabriel University of Tennessee April 19, 2013
SNS Experimental FacilitiesOak Ridge Target Systems for the Spallation Neutron Source Presented by John R. Haines at the High-Power Targetry for Future.
ISIS Accelerator Division
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Chubaka Producciones Presenta :.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
A View from NSF The Early Years of CESR David Berley University of Maryland May 31, 2008 Two Aspects of Cornell’s Success in the International Arena of.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
U.S. Department of Energy Office of Science Update from DOE’s Office of Science Patricia Dehmer Deputy for Science Programs Office of Science, U.S. Department.
Nuclear Energy Options and Project-X Shekhar Mishra Fermilab Yousry Gohar ANL June 7 th 2010.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
BESAC Subpanel Review of IPNS and LANSCE/Lujan Center Washington, D. C. December 11, 2000 IntroductionWard Plummer, Chair Evaluation Procedure &Jack E.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
ICS – Software Engineering Group 1 Status of SNS Carl Lionberger.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
F Project X Overview Dave McGinnis October 12, 2007.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
Neutron Diffractometer at MIT Nuclear Reactor Laboratory Neutron scattering and spectroscopy are among the pre-eminent tools for studying the structure.
Ted Fox Interim Associate Laboratory Director Energy and Engineering Sciences Oak Ridge, Tennessee March 21, 2006 Oak Ridge National Laboratory.
Alexander Aleksandrov Oak Ridge National Laboratory
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Introduction Ward Plummer BESAC Subpanel Review of IPNS and LANSCE/Lujan Center Washington, D. C. December 11, 2000.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Strength Through Science BESAC Presentation Office of Science Dr. James Decker Acting Director, Office of Science U.S. Department of Energy August 2, 2001.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
F Project X Overview Dave McGinnis August 8, 2007.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Synchrotron Radiation for Macromolecular Crystallography Report of the Office of Science and Technology Policy Working Group on Structural Biology at Synchrotron.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Jefferson Lab Overview Bob McKeown April 20, 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
U.S. Department of Energy Office of Science Update from DOE’s Office of Science Patricia Dehmer Deputy for Science Programs Office of Science, U.S. Department.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
The SNS Power Upgrade Project Building on the Success of the SNS Accelerator Deployment Kevin Jones Research Accelerator Division Director.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
LCLS 2009 NSLS-II 2015 APS 1995 BES Light & Neutron Sources SPEAR ALS 1993 HFIR 2008 SNS
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
WP11: electron and proton beam testing
Imaging & Engineering STAP Meeting 12th-13th of April 2018
SOLID Collaboration Meeting
Welcome Update on ESS Construction Project
Linac Coherent Light Source Transition to Operations 11 July 2007
SNS-PPU upgrades the existing accelerator structure
2015 January February March April May June July August September
Presentation transcript:

OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director Office of Science, U.S. Department of Energy Download this talk at U.S.-Sweden First Joint Consultative Group Meeting U.S.-Sweden First Joint Consultative Group Meeting 21 April 2009

2 The 1984 “Seitz-Eastman Report” of the National Academy of Sciences The first call for a pulsed spallation neutron source in the U.S.  The 1984 “Seitz-Eastman Report” (a.k.a., “Major Facilities for Materials Research and Related Disciplines ”) presented priorities for new facilities.  The new facilities in order of priority were:  a 6 GeV synchrotron radiation facility (the Advanced Photon Source at ANL, commissioned in 1996);  an advanced steady state neutron facility (the Advanced Neutron Source at ORNL, terminated in 1995);  a 1 to 2 GeV synchrotron radiation facility (the Advanced Light Source at LBNL, commissioned in 1993); and  a high intensity pulsed neutron facility (the Spallation Neutron Source at ORNL, commissioned in 2006).

3 Evolution of Machines for Neutron Beam Scattering

FROM MATERIALS PROPERTIES … TO PROCESS AND FUNCTION Courtesy John Axe & Sunny Sinha, 1997 Power requirements -- best guess at the time

5 5 Spallation Neutron Source Primary Parameters

6

7 7 Spallation Neutron Source Project

8 SNS Project Site — Spring 1999

9 Rep. Wamp Sec. Richardson Vice Pres. Gore Gov. Sundquist Sen. Frist Rep. Gordon ORNL Dir. Trivelpiece SNS Dir. Moncton Rep. Duncan Spallation Neutron Source Groundbreaking 15 December 1999

10 October 2000

11 October 2000, Site Plan

March 2002

13 August 2002

14 August 2002

15 November 2002

16  ~53% complete overall (including 94% of R&D, 85% of design, 39% of technical hardware, 46% of conventional construction, and 14% of installation)  ~90% of planned procurements had been awarded  Intensive conventional construction activity on site and hardware fabrication by industry under contracts to the 6 Labs  Project staffed at plan (~ 650 FTEs including Labs and AE/CM, plus over 500 construction workers on site); staffing peaked in FY 2002  Outstanding safety performance while completing ~1.6 million construction hours November 2002 A proton’s view of the target building from the exit of the ring tunnel

17 June 2003

18 June 2003

19 April 2004

20 The Spallation Neutron Source Today

Linac Tunnel

Looking toward the ion source Looking toward the accumulator ring

23 Inner Reflector Plug Installation

24 Overview of the Target – 14 November 2005 Thom Mason, Jack Marburger, Jim Roberto

27 Mercury Target Module  Original target module has exceeded planned fluence goal (SNS power level is currently 700 kW)  If target does not reach end of life by July 2009 shutdown, it will be removed to minimize impact on user program.

SNS Energy and Power on Target

SNS – What’s Next? 1.Science output 2.Continuous technical improvements

SNS Instrument Suite

31 Instrument Commissioning 4 instruments operating < currently operating 13 will be operational in 2009 All instruments are approved through a formal process

32 SNS Power Upgrade Linac beam energy upgrade to 1.3 GeV by adding 9 superconducting cryomodules. Eventual increases in H- ion source beam, improvements in target module, and other upgrades.

33 SNS Second Target Station  New spallation target and supporting systems and buildings  Initial suite of neutron beam instruments  Cost in the $1B range

34 The Spallation Neutron Source – The First 25 Years’ of the Journey