Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Extension of Provisionally Deemed Smart Strip in Commercial Applications RTF March 2, 2010 Danielle Gidding
Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Strips Reduces plug load by eliminating “idle”, “phantom” or “vampire” current from electronic devices. Types of smart strips –Occupancy sensors –Load sensors –Timer plug strip
Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N RTF Provisional Deeming In April 2009, the RTF provisionally deemed smart strips in both residential and commercial applications –100 kWh –Incremental Cost = $20 –Measure Life = 4 years –12 month sunset date of provisional deeming
Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Program Information Since RTF approval, BPA has reported 0 smart strips in the PTR –BPA resource constraints were barrier to program initiation New BPA initiative beginning in April 2010 –Utility led implementation Data collection required by BPA of participants –Model type installed –Installation location –Types of plug load –Business type Expected number of units: 600 – 3,000 units
Slide 5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Research Plan Plug Logger metering equipment 2 week post-metering of installed units –kWh usage –Simulated pre-usage in post install period Collect Information –Hours of operation –Installation setting –Equipment plugged in –Equipment settings Sampling: –50 units – dependent on number of installations and distribution –Will stratify sample based on business types; will be chosen based on provided information and focused on a few utility territories.
Slide 6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Request to RTF Extension of provisional deeming in commercial applications through April 2011 to allow for installations and research