March 2, 08 1 Review/Incentives 1/2 Improvement Items Steps User Impact Provider Impact Effort L = <1 wk M = 1-4 wks H = >4 wks Priority Pair programming.

Slides:



Advertisements
Similar presentations
From the eyes of an Administrator A general overview of e-CFunds Administrative Site, including navigation and exploring the features of this powerful.
Advertisements

Log System Spec 1 Logical Systems Specification Module Two stages in the module – Stage 4 - Technical Systems Options – Stage 5 - Logical Design Performed.
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
Connect Team Connect Team Outside Contrib Outside Contrib Unscheduled Backlog Bugs Feature Requests BA Review Requirement Docs Epic Large Tasks or Features.
Web Trnsport Agency Feedback. Agencies Visited: Florida DOT Indiana DOT North Carolina DOT Ohio DOT Oklahoma DOT Vermont DOT.
July 2010 D2.1 Upgrading strategy Javier Soto Catalog Release 3. Communities.
UL Careers Service Career Development Module Feedback and Evaluation.
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
CEN th Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Change Control.
PROQUIS Audit and Assessment tool Bill Best
EasyView© for Moodle Presentation by Richard Goddard Project Manager VLE Middleware EasyView.
Association for the Improvement of Minorities-IRS Career Assistance Mentoring Program – CAMP 2011 C.A.M.P. ORIENTATION March 25, 2011.
Sakai Overview Sakai Conference: June 12-14, 2007 Amsterdam, NL.
Comprehensive Review of the Public Safety Communications Center Phase 2 Report County of Dane, WI February 12, 2009.
© 2014 FIFA TMS. All Rights Reserved. FIFA TMS ONLINE TRAINING MATERIAL Association user practice session.
Introduction to Mendeley. What is Mendeley? Mendeley is a reference manager allowing you to manage, read, share, annotate and cite your research papers...
Evaluation Practices Training providers flourish starting 1992 with the passing of HRD Act Training providers flourish starting 1992 with the passing of.
INF Development of IT competence in organisations Welcome! 1 10 ECTS credits Builds on basic informatics competence MemeCenter.com.
Working with the BOSS (Baldrige Online Scoring Solution) Wisconsin Forward Award Examiners
Project Management Facilities for GUS. Useful Facilities for GUS CVS CVS Bug/Feature Tracking Bug/Feature Tracking Mailing Lists Mailing Lists Documentation.
A program of the Texas Commission on Environmental Quality.
Xitracs Portal LEAPs and Outcomes. Types of Users Program Assessor Create and Enter the LEAP or Outcome Plan Document the Results Propose Changes Peer.
ABCD Forge Presentation to abcd-softdev Norton Allen DEAS/CCB March 29, 2006.
Page 1 TEST in the large RELEASE REWORK ASSESS packaged application documentation models and source code management documents requirement alloc. matrix.
OSG Documentation Workshop June 24-25, 2009 The chance to develop improvement plans.
GISPUG – July 27 th,  Enhanced MySites  Social Tagging  Wikis  Resources  Open Discussion.
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 3. Defining the System A Use Case Primer Organizing.
MARCH 1 Risk Management Introduction l Generic approach è Type of project è The length of the project è Experience of the risk manager è The attitude of.
1 Euro-VO Technology Forum, 17 March 2010, Annotations at the CDS Web 2.0: annotations at the CDS Brice GASSMANN Sébastien DERRIERE Thomas BOCH.
Oregon Project Independence Pilot Project Quality Assurance Process.
+ Post-Rounds Debrief March 21, Ground Rules Observers should not share what they have observed in a lesson with anyone outside their pairs. Observers.
IS 6100 Paper 2 Peer review William A. Sodeman, Ph.D.
March 2, 08 1 Ownership Improvement Items Steps User Impact Provider Impact EffortPriority Example Improvement Key Step 1 Key Step 2 H, M, L L =
Project Proposal Cmsc828g March 4, Project Proposal Due Tuesday 3/ pages Describe the area – include at least 5 references (even if unread)
2012 Examiner Training Webinar Series SharePoint User Training Tim Case Courtney Krier.
Introducing ReportCard2.0 ReportCard2.0 Introductory Training.
GLAST Science Support Center June 29, 2005Data Challenge II Software Workshop User Support Goals For DC 2 James Peachey GSFC/L3.
Tbare How to Link Another User’s PC to the TBare Inventory Server TBare Training IT - Have a Client on Another PC Link Back to the TBare Inventory Server.
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
1 Patching System Patching is in progress –SRP has been refreshed & patched –Testing is underway (PY parallel & scripts) Planned Schedule –Start (Production.
National Oceanic and Atmospheric Administration User Group Presentation – Major Release 2.0 Part II November 9, 2005.
OSG internal review comments Jim Bottum Ewa Deelman Ian Fisk Mark Neubauer March 14, 2014.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
BUS 660 Week 3 Assignment Leadership Traits Leadership Traits Write a page paper on the concept of leadership traits. Include at least three cites.
BUS 660 Week 4 Assignment Leadership Skills To purchase this material link Assignment-Leadership-Skills.
Using Google Docs in Education
 Google analytics add your word press to help you to track your website visitors  That what they are looking for  Google + help you to access your.
2011 Prioritization Update to Market Subcommittees
Global Grid Forum GridForge
ShareTheTraining TRR ARB Presentation Team 11
Software Documentation
360o Feedback Report Post-Training After-Session Actions
How to Import and Export Users In WordPress. Why or When You Need to Import & Export users in WordPress? When you purchase a site and need to merge the.
INF 231 Enthusiastic Study/snaptutorial.com
Backlog Workflow In Progress Completion Status Unassigned Not started
Software Release January 2014
North Country/ Mohawk Regional NTI
Implementation Process and What the Consultant Does
Learning Management System
Journey writing CONTROLLED ASSESSMENT
Documenting Your PLC System
Evaluation ECE 695 Alexander J. Quinn March 30, 2018.
Chapter 6:Heapsort.
ANNOTATING:.
Chapter 6:Heapsort.
(Project Name) FAQ What Is ServiceNow? Will I be impacted?
Evaluation Practices Training providers flourish starting 1992 with the passing of HRD Act The Act requires companies to contribute 1% of monthly payroll.
GRE Informal Group “SLR“ Workload 2017 SLR-16-05
Reviewing.
Item 6.3 ISCED 2011 operational manual: priority issues
Presentation transcript:

March 2, 08 1 Review/Incentives 1/2 Improvement Items Steps User Impact Provider Impact Effort L = <1 wk M = 1-4 wks H = >4 wks Priority Pair programming model for writer/reviewer document responsibilities identify reviewers (outside installation it is editorial review only) reviewers assigned to reasonable trees (set of pages) training (remote) HLMH Provide feedback evaluation at beginning & end of documents, celebrate good documents and documenters star rating for documents (find a plugin) LHLM

March 2, 08 2 Review/Incentives 1/2 Expand standard review process now used for release documentation - do 6 month to 1 year reviews of docs outside of installation have user feedback help prioritizing (number and comment of comments and page views) also release documentation should be decoupled from the software formal review only with major releases (no patches) for minor releases identify subset of changed documents (needing review) similar process for non installation documents complete review at least every 18 months (each area independently) MMMH Use annotation plug-in that allows anyone to comment on document without registration HHMH

March 2, 08 Review/Incentives - add If we had only one page visit in the last 6 months maybe the document is not important Add a comment on all the pages like "do you know that you can add a comment by...?" to start/improve adoption of comments 3