Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May 13 2014.

Slides:



Advertisements
Similar presentations
Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
Advertisements

Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
ILC Positron Source Update Wei Gai Posipol ILC RDR baseline schematic (2007 IHEP meeting) Collimator OMD 150GeV e- ~147GeV e- Target TAP (~125MeV)
Simulations with ‘Realistic’ Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
ILC Electron and Positron Sources Wei Gai for the ILC e- and e+ collaboration PAC review, 2012 KEK, Japan.
Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Radiation Cooling of the ILC positron target LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, DESY, Peter Sievers, CERN/ESS, Andriy Ushakov,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
What’s been Achieved and What’s to be Done K. Yokoya ILC Annual Meeting 2012/12/20 ILC Annual, Yokoya1.
Simulation of Positron Production and Capturing. W. Gai, W. Liu, H. Wang and K. Kim Working with SLAC & DESY.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
ILC undulator based RDR e+ source: Yields and Polarizations for QWT capturing and different drive beam energy: Wei Gai, Wanming Liu Argonne National Lab.,
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Status of target and photon collimator work for polarized e+ LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, Friedrich Staufenbiel, DESY.
Update on ILC Positron source study at ANL since the Durham/UK Meeting10/2010 Wan-Ming Liu, Wei Gai.
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
CONVERSION EFFICIENCY AT 250 GeV A.Mikhailichenko Cornell University, LEPP, Ithaca, NY Presented at Positron Source Meeting Daresbury Laboratory,
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Positron source beamline lattice Wanming Liu, ANL
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
Status: Cooling of the ILC e+ target by thermal radiation LCWS 2015, Whistler, Canada 3 rd November 2015 Felix Dietrich (DESY), Sabine Riemann (DESY),
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
Positron Sources for Linear Colliders* Wei Gai JPOS 2009, Jefferson Lab, March 26, 2009 * Acknowledgement of contributions from the ILC and CLIC e+ collaborations.
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Undulator Based ILC positron source for TeV energy Wanming Liu Wei Gai ANL April 20, 2011.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Positron Source for Linear Collider Wanming Liu 2013 DOE Review.
ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Masao KURIKI (Hiroshima University)
POSIPOL 2016 at LAL/Paris, Sept Peter Sievers-CERN
A Positron Target Concept for the ILC
Rotation Target R and D of ILC E-driven source
The ILC positron source target using cooling by thermal radiation
NC Accelerator Structures
ILC RDR baseline schematic (2007 IHEP meeting)
Heat load at the ILC positron target and collimator system
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Cost Comparison of Undulator and e-Driven Systems
ILC RDR baseline schematic (2007 IHEP meeting)
Electron Source Configuration
Summary for the Sources working group
Presentation transcript:

Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May

2 ILC TDR positron source location Photon collimator for pol. upgrade Optical Matching Device for e+ capture Main e- beam from electron main linac Target for e+ production PTAPA (~125MeV) PPA ( MeV) PBSTR 400MeV-5GeV  dump e- dump Damping ring 147 m helical undulator for photon production  PCAP PLTR: Energy compression and spin rotation Main e- beam to IP 150 GeV beam to dump

Beamline Lattice New lattice design has been done to comply with the new layouts as follow. 3

Outline Undulator Photon Collimator Spinning Wheel Target Material(TargetCollimator) Test Flux concentrator 300Hz truly conventional Source

Target system The positron-production target is a rotating wheel made of titanium alloy (Ti6Al4V). The diameter of the wheel is 1m and the thickness is 0.4 radiation lengths (1.4 cm). During operation the outer edge of the rim moves at 100 m/s.

Positron Source Spinning Wheel Target Prototype has been built and tested for eddy current issue. Vacuum seal test of supporting shaft was not very successful. The current prototype is not robust enough for production system. Still need to demonstrate full wheel with cooling channel. Not funded for further test and demonstration.

Major Concerns on positron sources Issues on moving forward on the current LLNL test. – Approaches are still viable? – Funding – Technical support Alternative target design for undulator sources – Differential pumping, – Other type of targets? Alternative scheme: – 300 Hz – How to do a technical design? – Resources on the technical design?

Existing (unsolved) Issues for Undulator based source Beam dynamics, (OK) Undulator (OK? Target (heating and shocks) – Good? No issues? No critical problems (97%), there is rooms for further improvements. Target support vacuum chamber, test at LLNL. – Life time of the vacuum seal (short time survival, but long term > a few weeks with vacuum spikes, no clear path forward at this point), no radiation damaging testing yet., and – Cooling water impact on wheel dynamics (simulation should be done). – Rotating Seal leak tests at KEK planned. – New ideas: Non-contact (differenetial pumping), support, radiation cooling. Many others (later in the talk). OMD, (OK) Accelerator (NC) – SLAC test showed 14 MV/m. Interfacing with damping ring (OK)

Conventional Source (300 Hz) 6 GeV drive beam generation (OK? We have a design that will work Sband) Target: Shocks, stresses, cooling (use SLC solution), slow rotating target wheel in vacuum, or pendulum, easier to seal). Need some engineering studies, require 5 m/s. AMD, easy, existing (higher field next year, no issues at this point). Beam capturing Linac – 300 Hz linac (hybrid L and S?) – Un-even beam loading, and energy compensation, RF gymnastics (solution exists, although may not be optimized). – Interface between L-band and S-band (bunch compressor?) A detailed beam dynamics simulation is required. – Costing according to ILC methodology. Interface with damping ring simulation. – to be done.

Undulator 4-m module fabricated and cryogenic tests were done at RAL 4-m module magnets has been done at RAL Shorter period with higher field helical undulator is desired to for luminocity at lower Ecm. No one is known to be working on the developing of shorter period helical undulator with higher field.

Photon collimator Photon collimator is an important part for positron source polarization upgrade. DESY has a preliminary design. Detail engineering design and prototyping is needed while not funded

Material Test

Material test

Flux Concentrator

Flux concentrator

300Hz alternative source target

300Hz Conventional Source

Alternative undulator based target studies Developing a self loading machine gun in vacuum

Concept illustration Linear motors to move target pieces EM rail gun to launch target pieces Magnetic braking to brake the target piece Commercially available Conduction cooling via the bottom of target. Inspection and replacing of damaged target can be easily done on along this path. Path can be easily adjusted to increase the cooling time.

Parameter estimation of the Rail gun for launching target External permanent magnetic field will be applied to improve With the following assumptions: length of rail 100cm, target bullet 1.4cmx1.4cmx6cm and rail has same cross section of target bullet 1T external magnetic field and copper rail We estimated that: The current required to accelerate the target from 0 to 50m/s is about 4.5kAmps The average heating power of gun is about 700W

Braking for target bullet We have multiple options in slowing down the target bullet – Eddy current only braking – Magnetic braking with external power source – Magnetic braking without external power source All of the above options are good candidate We can pick any one and then do the designing

Cooling/Inspection of the target bullet Radiative/conduction cooling, – 60 seconds cooling time. Accurate calculation of the cooling time requires numerical simulation due to the non-uniform energy deposition in target bullet. Guestimate: – We can over estimate it by assuming that the bullet got heated up 200 o C above room temperature uniformly. In such exaggerated case, the cooling time required to cool it back down to 25 o C using 10 o C cooling agent outside on bottom of the recycling line can be estimated as about 46 seconds. – We have plenty of time to cool the bullet down. Inspection and replacing damaged bullet can be easily adapted in the recycling line.

Transferring of target bullet Transferring of target bullet is done via actuators driven by linear motors. Taking the worst case scenario, friction coefficient of 0.9 for rubbing contact of untreated surface without lubricant, it needs 38N to overcome the friction. The works need to be done will be less than 0.52J per movement, or about 2.5W of power. The loading actuator raise the weight of about 50 target pieces, 28N, by 1.4cm each time. The works need to be done will be about 0.39J per movement, or 2W of power. Transferring the bullets inside the system should be quite easy.

Comments/Summary We only had a few tests at LLNL, there are many improvements can be made. If all the motors and mechanical parts can be placedin a rough vacuum, a good differential pumping can be achieved. Alternative targets (not the scheme), can also be studied and tested.

Future Plan (or recommendations) Undulator sources: – More conclusive test at LLNL (but require large fund). – Start looking at alternative schemes (bullet/differential- pumping/LiW/???), need to converge fast (in a year or less). – Undulator test, alignment and field uniformity. Conventional source: – Many technical aspect of the conventional source need to be studied, system tests are also needed. – Layout should be done in six months. It is challenging, but working with good engineering team ($$$$), I am optimistic.