Office of Highway Safety Boston, Massachusetts July 10, 2006.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
is a mobile protective steel barrier in a modular design.
Measure M Sunset Action Plan. Overview  Promises Made, Promises Kept  Funding Picture  Use of Measure M (M1) Freeway Funds  Next Steps 2.
The Toll Reality in Central Texas Steve Pustelnyk Director of Communication May 26, 2011.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Presented by Team 4 Dennis Farley, Thomas Demana, Chetan Rao, Carlos Arguello-Mirazo, Jim Varghese August 29, 2011.
Central Texas Turnpike Project Tour Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike.
CEM-512 Value Engineering Highway Project: South Interchange.
Minnesota Department of Transportation House Transportation Policy & Finance Committee February 23, 2015.
Public Border Operators Association Border Infrastructure Project Updates Canada – United States Transportation Border Working Group Meeting April 19 –
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Office of Highway Safety Girder Failure Dan Walsh.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Chapter 4. NEVER drive faster than weather or road conditions allow Always slow down On narrow winding roads At intersections or railroad crossings On.
I-65 Added Travel Lanes Project in Tippecanoe County
Whittier Access Project, Alaska The Anton Anderson Memorial Tunnel Whittier Access Project.
Office of Research and Engineering Finite Element Analysis Carl R. Schultheisz.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Central Artery / Tunnel Project The Boston Big Dig This SAMPLE has key PM terms in ‘red’ but yours would have them in ‘black’.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
State of the Agency Mike Snyder, P.E., Executive Director.
Runways – 7 July Paul Harwood
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Current Construction Projects Major Projects Pinellas County.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
A Regional Approach for Fort Carson Growth Planning Fort Carson Growth Plan Update Town Hall Meeting February 6, 2009 Mayor Tyler Stevens, Board of Directors.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Southern Bridge Project Brown County Executive
Winchester Medical Center Campus Expansion June 21, 2011.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
Office of Highway Safety Agencies and Companies Involved in Ceiling Design and Construction.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Office of Highway Safety Tunnel Inspections and National Standards.
No Cell Phones, Please. Thank You.. Division of Layne Christensen Company Specialty Foundation Construction Jet Grouting Drilled Micropiles Vibratory.
The BIG DIG Team Summit Topic Presentation April 19th, 2005
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Office of Highway Safety Hampshire, Illinois October 1, 2003.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
DESIGN-BUILD DEMONSTRATION PROGRAM California Department of Transportation District 4 Calmentor Meeting January 27, 2011 Presented by:Joseph Dongo Presented.
Think Globally, Act Locally August 19, Introduction Why freight is important to central Ohio Global implications and impacts Highway system challenges.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Metro Highway Program Presentation to CMAA Abdollah Ansari
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
Darrin Roth American Trucking Associations, Inc. INTERNATIONAL SYMPOSIUM ON ROAD PRICING.
By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
June 5, 2017.
Interstate 15 North Phase 4
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Central Artery/Tunnel Project (CA/T)
No Cell Phones, Please. Thank You..
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Major Initiatives in Hampton Roads
Presentation transcript:

Office of Highway Safety Boston, Massachusetts July 10, 2006

Topics Central/Artery Tunnel project Agencies and companies involved in ceiling design and construction

Central Artery/Tunnel Project Improve traffic flow through Boston Central Artery (I-93) opened in 1959 with a design capacity of 75,000 vehicles per day Traffic capacity later exceeded 190,000 vehicles per day Other improvements included the expansion of Interstate 90

Central Artery/Tunnel Project Improve traffic flow through Boston Central Artery (I-93) opened in 1959 with a design capacity of 75,000 vehicles per day Traffic capacity later exceeded 190,000 vehicles per day Other improvements included the expansion of Interstate 90

Central Artery Statistics 161 lane miles along a 7 ½ mile corridor Five miles of tunnels Six highway interchanges 200 bridges Originally scheduled for completion in 1998 at a cost of $2.6 billion Major construction completed in 2006 Final cost exceeding $14 billion

NORTH D Street Portal I-90 Connector Tunnel Ted Williams Tunnel

Ted Williams Tunnel portal D Street portal Construction Sequence

Ted Williams Tunnel portal Temporary access ramp D Street Construction Sequence

D Street X

Source: Mass. State Police

Ceiling Design Sequence Construction on the Ted Williams Tunnel began in 1991 Ceiling system for the Ted Williams Tunnel designed in 1992 D Street portal completed in 1993 Ted Williams Tunnel opened in 1995

Suspended ceiling Source: Mass. Turnpike Authority

Problems Encountered Installation of the ceiling was expensive and complicated Custom panels were time consuming to install Panels were expensive to maintain

Ceiling Designs Federal Highway Administration initiated a study in February 1995 to examine alternative ceiling designs New design to be used in both the I-93 and I-90 tunnels New ceiling design adopted in June 1995 New design was less expensive and easier to install

Ceiling Design Sequence New design completed in 1996 and first used for the I-93 tunnel I-93 tunnel used steel roof girders to support the ceiling hardware The 1997 tunnel finishes contract for the I-90 tunnel required the new design Remainder of I-90 tunnel constructed with embedded steel channels to support the ceiling hardware

Source: Mass. State Police

Source: MA State Police Source: Mass. State Police

Issues Insufficient understanding among designers and builders of the nature of adhesive anchoring systems Lack of standards for the testing of adhesive anchors in sustained tensile- load applications Inadequate regulatory requirements for tunnel inspections Lack of national standards for the design of tunnel finishes

Investigation Participants Massachusetts State Police National Institute of Standards and Technology Federal Highway Administration Turner-Fairbank Highway Research Center