Injector De-cabling Project Enlarged meeting #3 18.09.2015 E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
ELENA Installation follow-up 21/05/2015 Worksite follow-up.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
DTO Day – Report for EN Ofelia Capatina, DTO of EN Department.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL-CF 08/10/2015 General De-cabling Project Meeting #4.
YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
LHC-YETS Coordination meeting #9 24 th November, 2015.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS YETS 2015/2016 Planning meeting (No.3) 07/10/15 David Mcfarlane EN-MEF D.Mcfarlane1.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Survey on “Chargés de Consignation” Status Update
SPS Personnel Protection System Renovation Project
LIU – EVM status and next steps
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
Identification of the unused cables
Injector De-cabling Project
De-cabling strategy during YETS
Quality Assurance applied to Accelerator Safety
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
MPE main activities planned for LS2
Renovation of the 45-year old PS magnets
Update on the Ethernet Network Installation Campaign
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
HIE-ISOLDE Project: Planning & Resources
Presentation transcript:

Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team

Content Status by machine Follow-up on Booster Decision making on partial/full removal in Booster YETS organization Conclusions

Status by machine Machine/areaTotal number of signal and control cables (Excluding DC and not known cables) Identified obsolete cables (with or without purple tape) Last talk Booster12’0002’694 (23%) 25 % SPS – BA5~ 6’5003’250 (50%) 50 % SPS – BA3~ 8’ % PS – CENTRE RING~7’ (14%) 14 % TT2~3’00072 (2.5%) 2 % Reminder: cables which are in use now and are targeted to be replaced for future projects are not considered today as obsolete cables. They are out of the scope of this project and must be treated by the future project teams.

EN-EL ~500 cables analysés 1-Câbles signaux et contrôles : Cablothèque papier : Emergency stop 96  being investigated by H. de Maynard General 20  being investigated by S. Delarue Câblothèque Gesmar: voir fichier EN-EL attaché  212 cables (TE-EPC) tous en utilisation 2-câbles BT : voir fichier EN-EL_BT Analyse par S. Delarue : 3 câbles obsolètes, le reste en utilisation

BE-BI La DEC BI comporte maintenant 349 câbles Pour ce qui est des câbles utilisés, je n’ai pas de liste de Franck Guy Guillot-Vignot, Jocelyn Tan, Jeroen Belleman, Marek Gasior, Franco Lenardon, qui sont tous responsables de racks au Booster. Le point positif c’est que actuellement j’ai les listes de câbles utilisés de 5 personnes sur 10

TE-VSC DEC completed, will not evolve Used cable list under investigation. Some TE-VSC cables are not listed in EN-EL database

EN-STI DEC with 7 cables. Gesmar list analysed : green = EN-STI and in use, yellow = other group (50 cables). Paper list : analysis in progress.

TE-ABT 553 cables were announced obsolete but only 222 are really obsolete, the remaining is still in use till LS2 (Current BI.DIS) A DEC must be edited with these 222 cables The case of the former BI.DIS is not yet defined: can we consider it as an obsolete system ?

IT-CS T+T boxes ASC R R R R R R R R R R R R R R R EXT R R R S S S S S

Dashboard 04/09/15 LocalisedUnlocalised PS BOOSTER (12397) SPS-BA3 (8000) SPS-BA5 (6500) PS-ring centre (7000) GroupIDENTIFIEDDECIDENTIFIEDDECIDENTIFIEDDECIDENTIFIEDDEC EN/EL EN/CV 78 EN/MEF 96 EN/STI 777 TE/MSC 272 TE/EPC TE/VSC TE/MPE 63 TE/ABT BE/RF BE/BI BE/CO IT/CS GS/ASE DGS/RP PH 23 OTHER 480 TOTAL %23%16%50%11%14%13 %

Dashboard 17/09/15 Localised Unlocalised PS BOOSTER (11943) SPS-BA3 (8000) SPS-BA5 (6500) PS-ring centre (7000) GroupIDENTIFIEDDECIR%IDENTIFIEDDECIDENTIFIEDDECIDENTIFIEDDEC EN/EL 380 EN/CV EN/MEF EN/STI TE/MSC TE/EPC TE/VSC TE/MPE TE/ABT BE/RF BE/BI 451(TBC) 4042 BE/CO IT/CS GS/ASE DGS/RP PH OTHER 480? TOTAL %23%17%50%11%14%13 %

Partial/full removal CriteriaPartial removalFull removal + re- installation Cost--- Feasibility--0 Resources--- Standard waste0- Activated waste--- Schedule--- Risk (damage)--- Outcome--- Prix [MCHF] Temps [W], work in 2shifts Depose total1.512 Repose4.250 Depose partial0.823 Preliminary study

YETS organization Lock-out of all services during identification and cable disconnection  in conflict with some systems  Identification and cable disconnection (YETS 2015) under the responsibility of the equipment group  Up to the equipment group to decide for the lock-out of its equipment  Working teams will need the adequate electrical accreditation  Removal of the obsolete cables (EYETS ) under the responsibility of EN-EL  general lock-out is mandatory.

YETS organization Re-commissioning after disconnection/removal – Common procedure  a dedicated sub-WG will be launched soon. Will address the following topics: Procedure for already disconnected cable Procedure for not yet disconnected cable Procedure for orphan cable List of tests to be achieved after disconnection

YETS organization YETS 2015/2016 Booster = 9 weeks available / SPS = 7 weeks available : Circuit lockout Cable identification Cable disconnection System tests

YETS organization Current proposal: Circuit lockout: 1-2 days Cable identification and disconnection for separate systems. 2 weeks in 2 shifts Check of separate systems: 2 weeks in 2 shifts Cable identification and disconnection for communication system: 2 weeks in 2 shifts Check communication system : 1 week in 2 shifts Co-activities during YETS and EYETS > Schedule to be prepared Tight schedule for BA3 & BA5 Operators might help.

Project Information Sharing E-groups InjectorDe-CablingProjectMembers (members of the Injector De-Cabling Project (equipment group)) InjectorDe-cablingProjectTeam (Project team for de-cabling activities in the injectors) Indico Sharepoint site

Conclusions Booster: an exhaustive approach is followed. Each listed cable is being analyzed by group owner/user (  Obsolete cables + Used cables). Almost complete! Results: Paper listings contain more obsolete cables than Gesmar A lot of cables seems already removed, although they are still listed in DB. Used/unused ratio varies very much, depending on the equipment groups considered Only 25 % obsolete cables were identified up to now, this result will not evolve any longer and should be considered as final. The same methodology will be applied on SPS and PS.