MONALISA David Urner Oxford University. Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction.

Slides:



Advertisements
Similar presentations
MONALISA: Interferometric Position Monitor at the Nanometre Scale David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Advertisements

1 MONALISA Compact Straightness Monitor Simulation and Calibration Week 4 Report By Patrick Gloster.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
MONALISA installation at the ATF2 ATF2 weekly meeting.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
Final Doublet Stability and in-detector Interferometry MONALISA David Urner Oxford University.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
A Laser Based Alignment System for the CLIC project
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MONALISA David Urner, Armin Reichold, Paul Coe, Matthew Warden, Geoff Rayner Monitoring Alignment and Stabilisation with high Accuracy (Previously known.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
1 StaFF Progress Report David Urner University of Oxford.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
Tue 31 Mar :50 (CEST) 13:50 UTC CLIC stabilisation day 5 - LAPP OXFORD MONALISA 1 Options for interferometric monitoring of CLIC test magnet M.
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Stabilization of Focus at ATF2 David Urner University of Oxford.
Cost Estimate Marion White (Argonne) SCU 3-Lab Review Meeting December 16, 2014.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
A Straightness Monitor Made from Distance Meters First installations fall 2006 First results spring A B.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
Welcome to MONALISA A brief introduction. Who we are... David Urner Paul Coe Matthew Warden Armin Reichold Electronics support from CEG Central Electronics.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
09:40 – 10:00 (JST) Wed 5 Mar 2008 MONALISA : JAI Oxford MDI ATF2 TILC08 Sendai Japan 1 / 26 MONALISA Laser based alignment and stability monitoring.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
MONALISA Update David Urner ATF2 Meeting Dec
Extraction and beamline progress B.Goddard TE/ABT.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Alignment and stability session
David Urner Oxford University/JAI
News and Introduction from CERN June 15th, 2005
Summary FD Support System
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
MONALISA Compact Straightness Monitor Simulation and Calibration
Isotropic View Conceptual Design for MONALISA setup at CERN Magnet
IP configuration session
Session Introduction & Damping Rings Baseline Lattice Decision
DR Session Introduction
LCLS Undulator System Production Management
David Urner, Armin Reichold , Paul Coe, Matthew Warden, Geoff Rayner
Presentation transcript:

MONALISA David Urner Oxford University

Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction line to ATF2. Start of installation as soon as magnets are in place. Detailed schedule has to be worked out and will be presented in May ATF2 meeting. –We would like to ask for I beam across ATF2 tunnel to hold our ceiling nodes. Is the next ATF2 meeting in May early enough to incorporate this into the civil engineering process?

Compact Straightness Monitor (CSM) to Monitor IP CSM developent and deployment at ATF2 depends on funding success. We should know by March. Need to solve how to attach CSM to Shintake Monitor. –Difficult because we do not know yet how CSM will work (e.g. Do we need just one Retro reflector, or several, or cameras maybe?) –We will need to connect with a vacuum system -> Double bellow system ok? –Would be prudent to find 3 possible spots on Shintake Monitor board to which we can attach a vacuum node. Plan to work out this by May meeting Need to know when after what date attachment of vacuum node to Shintake monitor becomes difficult.

Compact Straightness Monitor (CSM) to Monitor IP Attachment of CSM to FF quadrupole –Propose attachment system by May meeting. Big unknown: When will we have working prototype in Lab. This is true R&D item. –Maybe we can make a schedule by May meeting.