Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
MONALISA installation at the ATF2 ATF2 weekly meeting.
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
VRVS session, 8th March 2006CERN AB-ATB-EA1 Layout of Passages between TT2 and TT2A Adrian Fabich, CERN AB-ATB-EA VRVS session, 8.
Collaboration meeting, Ocotober 2005A.Fabich, CERN AB-ATBResponse from the APC, 1 MERIT beam request A.Fabich CERN AB-ATB
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Compressor status AWAKE Technical Board meeting 19 May 2015.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR,
Update on the Laser Beam Line
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
Power controls, Sept. 2006A.Fabich1 MERIT installation: Controls for the 5MW power-supply A.Fabich CERN AB-ATB September 2006.
Extraction and beamline progress B.Goddard TE/ABT.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
The Next Generation of a Gamma Irradiation Facility GIF++
Cryoplant Controls Installation
Status, Schedule and EVM for the test facility project
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
IT-4189 Supply and installation of a cryogenic distribution system
MERcury Intense Experiment Experiment Layout
E4 hall technical specifications
Optical Diagnostics Networking at CERN
Collaboration meeting 26 to 28 June 2017
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Status of the cryogenic system for B180
The DBD: Outline and Scope
Status on the PS/SPS  MERIT (nTOF11) interface
X-ray Pump-Probe Instrument
MERIT beam request A.Fabich CERN AB-ATB
Layout of passages between TT2 and TT2A
MERIT – status and schedule
Discussion on MERIT Cryogenics Specifications
Injector/Linac Design Status C. E
Presentation transcript:

Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006

Installation issues - update, July 2006 A.Fabich 2 Contents The layout file EDMS versions obsolete CDD number PS_XXMER0001 Small location change of peripheral racks in TT2 Requested by Cryogenics Electrical supplies Summary of responses to the query of last week

Installation issues - update, July 2006 A.Fabich 3 ACAD layout file EDMS versions obsolete (cancelled) New version available within EDMS/CDD This is an active document. It is permanently updated. Recently incorporated/updated items: Cryogenic installations: DVB, heater, lines Passages TT2/TT2A Distribution boxes: Electrical power (220V/400V) Ethernet Several cuts/views Following soon: Details of control/electronic racks in TT2, horizontal platforms Beam line elements Beam monitors Quadrupoles Transport study is on-going: false floor, ramp... J. Metselaar, AT/ECR

Installation issues - update, July 2006 A.Fabich 4 Changed position of racks OLD layout NEW proposal ~1.4 m Is this acceptable? Power distribution box ETHERNET

Installation issues - update, July 2006 A.Fabich 5 Electrical power supply (220/400 V) Received response from the groups responsible for mercury loop, optical diagnostics, cryogenics, particle detectors and beam diagnostics. Sufficient input for releasing installation request. The power outlets will be installed in TT2 next to the racks (see ACAD drawing). Installation scheduled for October 2006 “Open” issues: Optical diagnostics asked for 110 Volt Is this really required? Can it be provided by the Hg loop system, which has already internally 110V supplies? Hg loop Power cable (not conform with IS23) can be adapted in place at CERN. US plugs can be exchanged/adapted in place at CERN.