Stuart Wilson REM 69a Lensfield Road Cambridge CB2 1EN, UK Tel: 00(44)1223 314 589 Fax: 00(44)1223 359 048.

Slides:



Advertisements
Similar presentations
EU Timber Regulation (Regulation (EU) No 995/2010) and secondary measures.
Advertisements

Tackling Illegal Logging and Associated Trade Lessons Learned for REDD Design and Implementation Indonesia Case Study May 28, 2009 AFP Dialogue.
LiberTrace - Establishing and Operating a Timber Legality Verification Department (LVD) within Liberia’s Forestry Development Authority (FDA) and Building.
ARMENIA: Quality Assurance (QA) and National Qualifications Framework (NQF) Tbilisi Regional Seminar on Quality Management in the Context of National.
1 The Data Protection Officer at work Experience, good practices and lessons learnt Pierre Vernhes – former DPO at the Council of the EU Workshop on Data.
Action Plan Skills Building: Module 2 Defining Action Plan Purpose and Scope January 2013.
Dénis KOULAGNA KOUTOU Secretary General Ministry of Forestry and Wildlife Cameroon.
Trade & environment Case study: International Timber trade Trade & environment Case study: International Timber trade.
Law Enforcement and Compliance: Illegal logging Aniko M. Nemeth, REC April 2009.
Directorate General “Environment” European Commission, Brussels
FLEGT VPA Independent Market Monitoring (IMM). IMM Background IMM is a condition of some FLEGT VPAs (e.g. Indonesia) Builds on IMM proposal by EFECA in.
New International Laws: the EU Timber Regulation, US Lacey Act and Australian Illegal Logging Law Forest Governance Forum Kinshasa September 2012.
ENPI FLEG Regional Activities: WWF’s Progress, Achievements and Impacts Elena Kulikova Director of Forest Programme WWF Russia.
The Civil Society-Independent Forest Monitors An independent forest monitoring team made up of four members of the NGO Coalition of Liberia. Focus on.
Scoping study for Improving Transparency through Citizen Charters in Serbia Transparency Serbia Presentation September 27 th 2010.
Introduction to Environmental Management Systems (EMS)
The role of the Office of the Privacy Commissioner in telecommunications Andrew Solomon Director, Policy.
ITIC PERSPECTIVE ON THE EFFECTIVE IMPLEMENTATION OF THE FCTC PROTOCOL ELIZABETH ALLEN ITIC – JULY 2014.
Links between legality and sustainability Alhassan Attah Executive Director, TIDD, Forestry Commission.
The LAS Development in Ghana Chatham House Illegal Logging Update and Stakeholder Consultation, July, 2007 By Chris Beeko.
Illegal Logging and Related Trade: Indicators of the Global Response Results from Ghana Sam Lawson Chatham House Associate Fellow.
Commission for the Prevention of Corruption Republic of Slovenia INTEGRITY I ACCOUNTABILITY I RULE OF LAW.
Internal Auditing and Outsourcing
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
FLEGT CAMEROON: Fight against poverty & legal security in the forest sector.
Planning and submitting a shadow report Charlotte Gage Women’s Resource Centre.
Audit of Public Procurement
Update on FLEGT VPA processes internationally Presentation by Jannik Vaa, EU Delegation, Accra June 7th, 2011 West Africa Forest Governance Forum.
Illegal Logging and FLEGT - Elements of an IUCN Response Tim Christophersen, IUCN – The World Conservation Union June 22, 2005.
MANAGING THE RISK OF FRAUD ‘A Standard Approach’ Presented by: Joe Laidler & Tracy Barnett ALARM Conference November 2007.
‘VALIDATION OF LEGAL TIMBER PROGRAMME’ (VLTP) Russian Far-East Khabarovsk Region Illegal Logging Update and Stakeholders Consultation Chatham.
Improve Forest Law Enforcement and Governance in the Mekong Region World Bank-FLEG – Todd Sigaty ASEAN ASOF 2009.
ENPI/FLEG Georgia – Program Update. ENPI/FLEG Georgia Implementing Organizations: in partnership with the NPAC and other key stakeholders World Bank IUCN.
1 Preparing VPA in Indonesia through multi-stakeholders process Presented to Illegal Logging Update and Stakeholder Consultation Chatham House, London.
1 Office of the Privacy Commissioner for Personal Data Hong Kong SAR Tony LAM Deputy Privacy Commissioner for Personal Data Asian Personal Data Privacy.
AN OVERVIEW OF WWF GFTN ACTIVITIES TO IMPROVE FOREST MANAGEMENT IN GHANA BY: ABRAHAM BAFFOE FOREST OFFICER WWF-WARPO.
VPA Impact Monitoring. an “evidence-based policy cycle” reiterative/adjustable to steer by based on reality checks to show if implementation leads to.
The EC Forest Platform is a FERN initiative that creates links between peoples in the South and the European Community in connection with aid and forest.
1 EUROPEAN COMMISSION CHATHAM HOUSE EU FLEGT Initiative: Analysis of national legislation of relevance to excluding illegal timber from EU markets – Italy.
Russian Forest Sector: Update on FLEG(T) activities Elena Kulikova, October, 13, 2008 Bucharest,Romania.
COP19 Outcomes : A Developing Country’s Perspective - Vositha Wijenayake Outreach and Advocacy Co-ordinator CANSA.
COMMUNITIES AND FORESTS: THE STATE OF AFFAIRS IN LIBERIA.
Gf A few points of the Hungarian Dissemination Strategy A few points of the Hungarian Dissemination Strategy Erzsébet Schmuck Hungary, Country Manager.
ENA-FLEG Process: Issues for future development October 14 Working Group Session #1.
MAKING THE FOREST SECTOR TRANSPARENT PROJECT (MFSTP) Forest Governance Scorecards in Ghana Presentation At The West Africa Forest Governance Forum 7 th.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Certification and FLEGT legality verification Duncan Brack Associate Fellow, Energy, Environment and Development Programme, Chatham House Forest certification.
The EU FLEGT initiative Improving governance; excluding illegal products Duncan Brack Associate Fellow, Energy, Environment & Development Programme, Chatham.
MedLiHer Contribution to Implementing the Convention for Safeguarding of the ICH in Mediterranean Countries Phase II Evaluation Meeting Cairo – Egypt 28-30/11/2010.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Organisation: SGS Société Générale de Surveillance S.A. Objectives: Assist Governments in the development and implementation of timber traceability and.
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
Forest Destruction: illegal logging and related trade Chatham House meeting, 19th January 2006 Sébastien Risso, Greenpeace.
EU Action Plan for Forest Law Enforcement, Governance and Trade EU FLEGT Update Chatham House, London, 25 January January 2007.
Duncan Brack Brussels, 27 April Support to timber-producing countries 2. Trade in timber 3. Public procurement 4. Private sector initiatives.
Assessment of additional measures to exclude illegal timber from EU markets Outline of study and UK study Duncan Brack Associate Fellow, Energy, Environment.
1 EUFLEGT.EFI.INT THE FOREST LAW ENFORCEMENT GOVERNANCE AND TRADE TEAM OF THE EUROPEAN FOREST INSTITUTE © European Forest Institute Vincent van den Berk.
Local Governance Anti-Corruption & REDD in Latin America and the Caribbean.
1 New EU legislation to prevent trading in illegal timber on the EU market SARAWAK INDUSTRY UPDATE Kuching, 20 July 2009 Vincent van den Berk European.
Understanding the EU Timber Regulation Rachel Butler Advisor to European Timber Trade Federation.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Forest Law Enforcement and Governance in Central Asia Kassel Project financed by the European Union The objective: Promotion of legal and sustainable.
Advocacy-driven monitoring Chatham House 2015 David Young
Mirjana Boshnjak Skopje, 20 to 22 September 2017
FSC Advice Note FSC-ADV V1-0
The Role of CSOs in the UNCAC & its Implementation Review Mechanism
How to conduct Effective Stage-1 Audit
Transparency Serbia Presentation September 27th 2010
UNCAC Chapter II Overview Prevention of Corruption under the United Nations Convention against Corruption 8-10 April 2019 Addis Ababa.
Presentation transcript:

Stuart Wilson REM 69a Lensfield Road Cambridge CB2 1EN, UK Tel: 00(44) Fax: 00(44)

Issues to Cover Relationship between IM-FLEG and FLEG-T Relationship between IM-FLEG and FLEG-T Information flows Information flows Institutional Arrangements Institutional Arrangements Potential problems Potential problems Evolution in illegality Evolution in illegality The need for consultation The need for consultation

Independent Monitoring of Forest Law Enforcement and Governance in Cameroon (IM-FLEG)  Work with government services in the field and the office  We publish our findings (field and thematic reports: -  Make recommendations for a way forward

FLEG-T and IM-FLEG The existence of an IM-FLEG type project is previewed as being an element of VPAs The existence of an IM-FLEG type project is previewed as being an element of VPAs The findings of an IM should be considered in the Verification of Legal Origin (VLO) process The findings of an IM should be considered in the Verification of Legal Origin (VLO) process When the IM (or other) documents/reports a suspected offence or breach of procedure When the IM (or other) documents/reports a suspected offence or breach of procedure When A PV (Official Statement of Offence) is established When A PV (Official Statement of Offence) is established When the defendant is found guilty When the defendant is found guilty

Institutional arrangements (IM-FLEG)+ (FLEG-T/VPA) > IM-FLEG-T is: IM-FLEG-T = VLO body I would suggest that this is not true and that there are several variables missing from the equation. Including: CBOs, NGOs, PS and GLES&OPOTA

Information flows VLO Audit body responsible for checks against identified criteria Government services: SIGIF and SIGICOF Private sector local and international NGOs, CBOs Others Log tracking organisations, Certification bodies and processes Organisations monitoring exports (SGS) Independent Monitoring (IM-FLEG) Certificate of Legal Origin Government services: SIGIF and… SIGICOF

Current FLEG issues in Cameroon The VPA process should be aware of the general state of play in the sector. The VPA process should be aware of the general state of play in the sector. Problems with SIGIF Problems with SIGIF SIGIF is seen as a key system in the control and verification of documentation: SIGIF is seen as a key system in the control and verification of documentation: Used exclusively for tax collection purposes (5 th quarterly report) Used exclusively for tax collection purposes (5 th quarterly report) Many titles allocated outside of procedures are registered in SIGIF. (See Mission report No.31 which looks at over 30 titles) which undermines the credibility of the SIGIF data. Many titles allocated outside of procedures are registered in SIGIF. (See Mission report No.31 which looks at over 30 titles) which undermines the credibility of the SIGIF data.

Evolution of suspected infractions From: large scale logging out of bounds (The famous case of FMU and SFH) From: large scale logging out of bounds (The famous case of FMU and SFH) In Sale of Standing Volume and Timber Recovery titles, logging out of limits remains a problem. In Sale of Standing Volume and Timber Recovery titles, logging out of limits remains a problem. To: Document based fraud Including in FMUs and Community Forests: To: Document based fraud Including in FMUs and Community Forests: None of the 30 Timber Recovery Permits investigated in Mission report No.31 had an EIA. 83% had no inventory. 66% were allocated for timber already felled (illegally) – paperwork allocated is used for laundering timber in transport. None of the 30 Timber Recovery Permits investigated in Mission report No.31 had an EIA. 83% had no inventory. 66% were allocated for timber already felled (illegally) – paperwork allocated is used for laundering timber in transport. 11 out of 19 logging sites visited had not respected Article 125 of the decree of application which requires daily completion of field documents, leading to tax loss 11 out of 19 logging sites visited had not respected Article 125 of the decree of application which requires daily completion of field documents, leading to tax loss

Database of investigations and legal cases The concept was presented in 2002, delivered in March It has not been used, no data has been entered into the system. The concept was presented in 2002, delivered in March It has not been used, no data has been entered into the system. SIGICOF should be a valuable source of information to VPA implementation SIGICOF should be a valuable source of information to VPA implementation The case of FMU raises interesting questions for VLO and the standards to be applied The case of FMU raises interesting questions for VLO and the standards to be applied Further training was provided yesterday after a change of staff in the Ministry Further training was provided yesterday after a change of staff in the Ministry

Conclusions That any proposed system should have a solid base That any proposed system should have a solid base SIGIF needs work SIGIF needs work SIGICOF needs implementing SIGICOF needs implementing The VLO process should consider a wide range of inputs, including those of Independent Monitoring projects The VLO process should consider a wide range of inputs, including those of Independent Monitoring projects The VLO body should be ‘pro-active’ in its approach The VLO body should be ‘pro-active’ in its approach There should be greater (breadth and depth) consultation in country on the VPA and implementing mechanisms There should be greater (breadth and depth) consultation in country on the VPA and implementing mechanisms These comments should be taken as constructive criticism and the presentation of issues that need consideration to achieve the goals set for FLEGT These comments should be taken as constructive criticism and the presentation of issues that need consideration to achieve the goals set for FLEGT

Independent Monitor’s Findings There are three different project outputs There are three different project outputs Mission reports: which could feed directly into FLEGT VLO bodies Mission reports: which could feed directly into FLEGT VLO bodies Quarterly reports: which provide detailed thematic analysis Quarterly reports: which provide detailed thematic analysis Annual reports: providing an overview of the year’s activities Annual reports: providing an overview of the year’s activities

All reports can be found at Thank you