N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.

Slides:



Advertisements
Similar presentations
Project Cost Management
Advertisements

Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
WHAT IS DRS? Thermoflow, Inc.
© 2010 The McGraw-Hill Companies, Inc. Cost Behavior: Analysis and Use Chapter 5.
Project Cost Management Chapter 7
Roberto Linares, Ph.D. Sigmafine Group Lead
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
1 The Cost of Organizational Structures and Interfaces prepared for Ground System Architectures Workshop by Darryl W. Webb Business and Operations Analysis.
ISQA 439/539 Price and Cost Analysis. Five Requirements of Competitive Bidding  Five Requirements of Competitive Bidding  Enough Dollars  Enough Suppliers.
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
Air-Water Heat Exchanger Lab In this lab, YOU will design, conduct, and analyze your experiment. The lab handout will not tell you exactly what to measure.
Chapter 41 Chapter 10 Strategic Cost Management. 2 Definition Strategic Cost Management: Supply chain partners working together to identify design changes,
1 The average time per task declines by a constant percentage each time the quantity of tasks done doubles. There is often a systematic relationship between.
Estimating Software Size Part I. This chapter first discuss the size estimating problem and then describes the PROBE estimating method used in this book.
Topic on Production and Cost Functions and Their Estimation.
1 NASA OSMA SAS02 Software Reliability Modeling: Traditional and Non-Parametric Dolores R. Wallace Victor Laing SRS Information Services Software Assurance.
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Quantities 2 Plans Prepared by Heath Bielefeldt Wisconsin Department of Transportation
3 CHAPTER Cost Behavior 3-1.
CS&E 1111 ExUnits Effective Workbook Design for Large Problems Objectives: l Efficient/effective worksheet designs l Using multiple worksheets in a workbook.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t D e s i g n L a b o r.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Productivity and Learning Curves
Analysis of the Material Handling Requirements for Flexible Manufacturing System Case Study: Line 155 Jessica Daly and Steven Tompkins LEGO Systems, Inc.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
Ch 1-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Ch 61 IT-390Preliminary and Detail Methods. 2 Design and Evaluation ä Preliminary Estimate requested during the initial evaluation for several reasons:
Chapter 3: Software Project Management Metrics
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
It’s not just a SWAG* * Scientific Wild Ass Guess Developing the Project Estimate.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M16 - Version 8.01 SMU CSE 7315 Planning and Managing a Software Project.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
ME - 1© 2014 Pearson Education, Inc. Learning Curves PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Supplement 7 Learning Curves.
5 - 1 The Cost Modeling Process Chapter Introduction What makes a good cost model? – Good Statistics – Quality Data – Relevant Data – Analogous.
Copyright © 2013 Nelson Education Ltd.
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Learning Curves Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Sigmafine 4.3 Roberto Linares, Ph.D. Sigmafine Group Lead.
Software Architecture Architecture represents different things from use cases –Use cases deal primarily with functional properties –Architecture deals.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
York Laboratory Information Systems Restructuring Proposal IEM 5303 Term Paper Fall 2000 Chris M. Forth Senior Project Engineer York International.
Chapter 3: Cost Estimation Techniques
Project Cost Management
Supplementary Chapter B Optimization Models with Uncertainty
Project Cost Management
Chapter 3: Cost Estimation Techniques
System Design, Implementation and Review
Workforce Management Software Suite
Air-Water Heat Exchanger Lab
Project Cost Management
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
COCOMO Models.
Project Cost Management
Why should I use parametric estimating?
Measurements & Error Analysis
How does a parametric estimate work?
E Learning Curves PowerPoint presentation to accompany
Chapter 3: Cost Estimation Techniques
Presentation transcript:

N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y MAXIM Periscope Module PRICE H Cost Modeling Bill Lawson 25 April 2003

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p2 Final Version 25 April 2003 MAXIM Periscope Module PRICE H Cost Model PRICE H: Commercial Parametric Hardware Cost Modeling Tool Tool Heritage: DOD Global Parameters: –Labor Costs: GSFC bid rates (used for in-house builds of spacecraft/instrument) –Inflation: NASA Inflation Index (MAXIM costs presented in Constant 2003 dollars) –Engineering Environment NASA environment defined by PRICE Systems, Inc. calibration study Baseline environment emphasizes System Engineering, Project Management, and automated design capabilities Key Component Parameters: –Complexity Factors (Table driven from industry experience) –Modification Level/Remaining Design Factor (Heritage) –Quantity and Design Repeat (Learning Curve) –Composition (Structure, Electronic, Purchased, Cost Pass-through) –Mass –Operating Platform (Unmanned-Space)

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p3 Final Version 25 April 2003 MAXIM Periscope Module ISAL PRICE H Cost Modeling Study begins with a blank model –Instrument payloads vary making a template approach difficult –Similar components (e.g., electronics) from prior studies were incorporated and modified ISAL study output products: –Powerpoint presentation –PRICE H model exported to Summary Excel Spreadsheet –PRICE H model exported to Detailed Excel Spreadsheet –PRICE model file (requires PRICE H software) –Upon request: Text reports containing input/outputs for each cost element

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p4 Final Version 25 April 2003 MAXIM Periscope Module Top-Level Cost Model

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p5 Final Version 25 April 2003 MAXIM Periscope Module Expanded Model

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p6 Final Version 25 April 2003 MAXIM Periscope Module PRICE Cost Summary 1 st “Periscope-Pair” Engineering Manufacturing Cost Element (Summary Report Available for each cost element) Year Dollars ($03) Total Cost Estimate $23.9M Production Development Schedule Project Management Mass

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p7 Final Version 25 April 2003 MAXIM Periscope Module PRICE Cost Estimate Summary Incremental Cost of 2 nd Unit (T2) T1T1 + T2 Total Cost (incremental cost for T2 is $2.24M)

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p8 Final Version 25 April 2003 MAXIM Periscope Module Learning Curve Basics PRICE H Users Manual: –Basis for improvement is the “human learning process” –Learning curves in PRICE H apply to production run (not development) –The more one produces, the more efficient one becomes –Production learning improvement is virtually non-existent for automated manufacturing methods –PRICE H provides a parameter to adjust the degree of automation (MPI) –Typically, automation lowers Theoretical First Piece (T1) cost and flattens the Unit Learning Curve NASA Cost Estimating Handbook (April 2002) –The learning curve concept is used primarily for uninterrupted manufacturing and assembly tasks –The major premise of learning curves is that each time the product quantity doubles the resources (labor hours) required to produce the product will reduce by a determined percentage.

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p9 Final Version 25 April 2003 MAXIM Periscope Module Multiple Unit Studies (PRICE H Learning Curve) PRICE H: –Calculates Theoretical First Piece (T1) production unit (most costly to produce) –Incorporates industry standard Boeing Unit Learning Curve (ULC) –Applies a correction factor to improve accuracy (for lower quantity studies) –Includes Stanford-b formula to transfer prototype learning to manufacturing –Calculates Production Average Unit Cost (UPC) Production Cost = T1 (QTY + QCF + Stan_b) - (QCF + Stan_b) A A A - ULCF Where: ULCF = (A – 1) (A – 2) 24 A = 1 + ln(UNITLC) ln(2) QCF = – ln(QTY) Stan_b = (input %)(Protos) ULCF is PRICE H correction factor Part of Boeing Equation Quantity dependent correction factor Percent of Prototypes to include

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p10 Final Version 25 April 2003 MAXIM Periscope Module Learning Curves

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p11 Final Version 25 April 2003 MAXIM Periscope Module Summary Cost Estimate

I n s t r u m e n t S y n t h e s i s & A n a l y s i s L a b o r a t o r y PRICE H Cost Model, p12 Final Version 25 April 2003 MAXIM Periscope Module MAXIM_PRICEcost.xls Detailed Cost Estimate (1 st “Periscope-Pair”) …