Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Trades and Transfers Activity to Date. 2 Introduction  Trade and Transfer functionality added to RMSEC auction (renamed RMTTSEC) from July, applying.
A regulatory framework for gas quality treatment facilities: recap and update.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
A study into the benefits which storage facilities may provide to the UK gas transmission system Nick Wye Presentation to NTS Charging Methodology Forum.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 8 – 7 th April 2009.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
LTSEC summer auction Transmission Workstream 6 th April 2006 Dave Adlam, National Grid NTS.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Ofgem Open Letter – Next Steps Transmission Workstream
Review Group 221: Option 3 – security provided after allocation.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
September 2008 QSEC auction - Allocations Transmission Workstream
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Entry Capacity Substitution Workshop 6 – 7 th January 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
DRSEC Update Transmission Workstream 06 November 2008.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transfers and Trades Special Transmission Workstream
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transmission Planning Code – Draft Document
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workstream, 2nd March 06
European Transparency Requirements
Capacity Methodology Statements: Impact of Mod 452
Action from Workshop 3 – SUB010
Capacity Methodology Statements
Background to National Grid’s Baseline analysis
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
QSEC auction timetable
Modification 501 slides for Workgroup
The Treatment of “Spare / Sterilised” Capacity
Review of Trade and Transfer Winter 09/10
Entry Capacity Transfer and Trade
Baseline Re-consultation
Comparison of Auction Revenue with Revenue Driver (Action RG )
Optimisation of Entry Capacity Modification Proposal
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Entry Capacity Transfers - Constrained Period
Presentation transcript:

Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007

Recap of previous two workstream meetings (1)  Outlined the basis for Ofgem’s TPCR baselines  National Grid provided network analysis following Ofgem’s prescribed methodology  Based on 2008 network, average of three TBE scenarios (Auctions +, Transit UK and Global LNG) using supply substitution  Using least favourable node as supply balance  TPCR baselines were set based on:  ‘Baseflow’ under each scenario as starting point, then split remaining ‘unallocated’ entry capacity on 10YS forecast flows for 2008

Recap of previous two workstream meetings (2)  Resulted in aggregate baselines of 8814 GWh/d  Discussed alternative methods for splitting the unallocated capacity within Ofgem’s spreadsheet  National Grid asked for input from workstream members, in particular on:  Views on ‘re-cutting of the cake’ (i.e. aggregate the same, i.e GWh/d)  Vs setting higher baselines (aggregate greater)

Summary of responses

Where do we go from here?  No real consensus view from the industry  No particular comments on a methodology to apply  Consider the two alternative approaches:  ‘re-cutting of the cake’ (i.e. aggregate the same, i.e GWh/d)  Vs setting higher baselines (aggregate greater)

Re-cutting the cake – how do you allocate the 8814 GWh/d? (1)  Start with current level of capacity obligations (take maximum booked for April 2008 onwards from August 2007 report on website) (8210 GWh/d)  Take off the Incremental Obligated (IO) which has been sold in Sept 2006 QSEC auction (1310 GWh/d)  This leads to 6900 GWh/d having been allocated  If previously sold out at an ASEP, add back 20% previously reserved for S-T (based on old TPCR baseline)  This affects Cheshire, Easington, Hornsea and Isle of Grain (359 GWh/d)  This leads to 7259 GWh/d which would be allocated … this then leaves 1554 GWh/d of entry capacity unallocated

How do you allocate the 1554 GWh/d?  Believe need to take account of physical capability  New baselines should be constrained to not exceed previous obligations  Needs to be broadly commensurate with the buy-back target  Therefore, based on the above, need to preserve the zonal limits  Applied above logic and used four different ways of splitting the 1554 GWh/d  On existing obligated level;  2005 TYS;  2006 TYS;  Max flow seen over 2 winters, 2005/6 and 2006/7.

Possible sets of baselines (1) Obligated Allocation based on sold + 20% old TPCR baseline where sold out

Re-cutting the cake – how do you allocate the 8814 GWh/d? (2)  Start with the current level of capacity obligations (take maximum booked for April 2008 onwards from August 2007 report on website less Incremental Obligated) (6900 GWh/d)  Add back 20% previously reserved for S-T (based on old TPCR baseline) at all ASEPs (but cap resultant figure at the old TPCR baseline)  This leads to 8400 GWh/d being allocated … this then leaves 414 GWh/d of entry capacity unallocated:

Possible sets of baselines (2)

Zonal analysis of possible baselines (2)

Re-cutting the cake – how do you allocate the 8814 GWh/d? (3)  Alternative starting position - could use historical flow over the last two winters (subject to the old TPCR baseline)  Then adjust for the current level of capacity obligations  This leads to 7802 GWh/d being allocated … this then leaves 1012 GWh/d of entry capacity unallocated:

Alternative ‘re-cutting of cake’ – possible baselines (3)

Zonal analysis of possible baselines (3)

Alternative of higher baselines – Capex requirement  Can Use the TPCR agreed revenue drivers as proxy for capital expenditure  If baselines increased back to pre 2007 TPCR levels  Around £275m extra capex needed to provide the increased baselines

Alternative of higher baselines – Buyback modelling  Alternatively, can examine the incremental buyback risk. Preliminary results indicate that:  Just at Teesside, increasing the baseline back up to 70 mscm/d could lead to around £90m incremental buyback risk (mean level of £20m) per year (assuming that the incremental flow at Teesside is off-set by reduction of flow at Milford Haven)  Similar level of risk at Barrow of increasing baseline back to 66 mscm/d

Summary  Discussed how baselines were set  Presented feedback received from industry  Proposed alternative ways of ‘cutting the cake’  Demonstrated that going back to higher baselines means either:  significant capex needed  or that buy-back risk is likely to be high  Will provide a summary report to Ofgem in the next two weeks  Ofgem to commence their consultation