Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MICE Top-Level Project Schedule Step IV Step V Step VI Revision date: 17 th June,
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
PM report International MICE programme Principal deliverables Schedule summary Schedule considerations and drivers Status of SS, RFCC and EMR, LH2 & LiH.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Project manager report paul drumm CM16 October 2006.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Executive Board Meeting Roy Preece 23rd May 2014
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Resource-Loaded Schedule Review Integration of MICE at RAL Historical constraints The integration project described Local organisation, safety and.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
US Construction Project: SSs, PRY, Cavities and test program 1.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Muon Ionisation Cooling Experiment Overview
Status of the MICE Construction Project
UK Financial Plan & Risks
MICE CM31 Schedule summary
Presentation transcript:

Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece

Content The Construction Project Update and Deliveries –EMR –RF –Spectrometer Solenoid –Focus Coil Schedule Drivers, Risk and Opportunity Response to recommendation – Project Dashboard

The Construction Project Status of the MICE Project

Responsibilities for Step IV equipment Sub-systemResponsibility Spectrometer solenoid #1US Spectrometer solenoid #2US Fibre tracker #1 + #2Japan, UK, US Focus coil #1UK LH 2 system AUK Lithium hydrideUS LH2 absorberJapan DiffuserUK Virostek plate & TOF cage assyUK, US Substation upgradeUK EMRGeneva (Radiation shutterUK) AFC Moving platform #1UK SS platforms Installation Partial Return Yoke UK UK, US

Responsibilities for Step VI equipment Sub-systemResponsibility Focus coil #2 and #3UK LH 2 system B and CUK LH2 absorbers #2 and #3Japan RFCC modules [magnets/RF hardware]US RF power systemUK AFC moving platforms #2 and #3UK RFCC moving platforms #2 and #3 Partial Return Yoke UK UK, US

Infrastructure Complicated and tight installation. The plot does not include the Partial Return Yoke (PRY)

Update and Deliveries Status of the MICE Project

Update Spectrometer Solenoid #2 fully tested to acceptance criteria Full mapping carried out by the CERN team Magnet delivered to RAL. Spectrometer Solenoid #1 has required some intervention. Vacuum leak HTS lead burnt out Thermal intercepts at the warm end of the HTS leads. Delivery to RAL May 14 Focus Coil #1 attained the 200meV/c current, 188A, but without stable operation. Focus Coil #2 is now at RAL and currently being cooled. Training cycles with #2 will lead discussion and decision making. RF amplifier Successful operation to 2MW attained. Amplifier and control systems currently being installed in the hall TIARA milestone Decay Solenoid Unfortunately a lead failure has occurred Repair plans for the next ISIS shutdown. Hardware interlocks implemented. Field Mitigation Design review carried out in August. Agreement to install the partial return yoke. Design almost complete

EMR The EMR (Electron Muon Ranger) arrived from UNIGE in September. No issues during the installation in the MICE hall. Commissioning runs were completed during October utilising weekend operations. Solenoid model and PRY model

RF Amplifier successfully tested to 2MW at DL Amplifier, control and power shipped to RAL Installation in the hall to complete TIARA milestone 6 tonnes of RF equipment shipped from UMISS arrived in October Co-ax, dummy loads and other hardware for the Steps V and VI Equipment for the TIARA project have been extracted and the remainder will be stored.

Spectrometer Solenoids Upstream Spectrometer Solenoid was delivered to RAL in early October The magnet is now situated in the R9 hall. The tracker detector can now be installed into the bore of the magnet. An external company has been employed to carry out all lifting and movement operations.

Spectrometer Solenoids Downstream Spectrometer Solenoid fully assembled with the shield installed. Some issue with thermal intercepts at the HTS leads. Issues have been addressed and the magnet is being re-cooled. Intended delivery of the magnet to RAL is May 14

Focus Coils The second Focus Coil arrived at RAL in October. #2 is now in the place of #1 and currently cooling. Magnet training plan running from late November. Training cycles with #2 will lead discussion and decision making. Liquid Hydrogen Absorber will have a fit check.

Schedule Drivers and Risk Status of the MICE Project

Schedule Drivers, Risk and Opportunity The targeted completion date for the Step IV configuration is Jan 2015 Partial return yoke and field mitigation work driving the schedule Slack has been created giving the opportunity to spend additional time on the quality of the magnets Spectrometer Solenoid arrival at RAL May 2014 ISIS user run March 2015 The baseline delivery of the RFCC magnets are March 2018 and September 2019 leading to a Step VI completion of May Option of utilising the MTA prototype bring RFCC#2 delivery back to July 2018 If this option is taken Step VI would be operational 2019 With a construction project such as MICE there will be many items at risk. Field Mitigation reduced operational risk Manufacture, delivery and Installation. Solenoids can not be powered until field mitigation is complete Operation of the magnet lattice Extended time to gain nominal operational currents Operational personnel / LHe supply and availability Stress on the magnets – lifetime Operational team Staff have been brought into the project RF, Cryo and Vacuum Interaction with the ISIS operational team Looking forward to the Step VI operation we have an opportunity If testing is completed successfully, take advantage of the MTA prototype magnet Reduce Step VI operation timescale by at least 1 year.

Response to recommendation – Project Dashboard Status of the MICE Construction Project