Wakefield Calculations for the ATF2 Beamline 03.04.2013A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)

Slides:



Advertisements
Similar presentations
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Advertisements

Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
Effects of wake fields in ATF2 low aperture kicker and IP nano-BPMs Karl Bane April 19, 2005.
01/07/2005 SN 1 of 16 Esti mation of HOM Power in the Interaction Region of ILC Sasha Novokhatski Session “Beam RF Effects” ILC MDI Workshop SLAC January.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
1 Impedance and its link to vacuum chamber geometry T.F. Günzel Vacuum systems for synchrotron light sources 12 th september 2005.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
FACET Machine Performance and Expectations M. Sullivan for the FACET Accelerator group SAREC Review July 25, 2013.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
BPM Orbit Data Analysis with Wakefields Glen White, SLAC January 2013.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Cavity Beam Position Monitor (BPM) for future linear colliders such as CLIC. N Joshi, S Boogert, A Lyapin, et al. Royal.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Updated status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, B. Mikulec, N. Mounet, T. Rijoff,
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Rough Estimation of energy spread produced in Final Focus line and effects to chromatic correction in ILC and ATF minor change Kiyoshi.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
J. Pfingstner, LCWS13 Jitter and ground motion studies November 13, 2013 Beam jitter at ATF2: A. Source localisation and B. Ground motion correlation Jürgen.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Collimator wakefields - G.Kurevlev Manchester 1 Collimator wake-fields Wake fields in collimators General information Types of wake potentials.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Beam Dynamics Meeting Bolko Beutner, DESY Summary of new FLASH CSR studies Bolko Beutner, DESY Beam Dynamics Meeting
Damping Ring ImpedanceK. Bane 04/05/2007 ILC DR Impedance Group At SLAC a group has been meeting bi-weekly for ½ year to study ILC DR broad band impedance.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
J. Pfingstner Imperfections tolerances for on-line DFS Improved imperfection tolerances for an on-line dispersion free steering algorithm Jürgen Pfingstner.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Brief review of past studies on Wakefield ATF2 Proj. Mtg K.Kubo.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
FJPPL-FKPPL ATF2 Workshop Jitter studies March 18, 2014 Beam jitter localization and identification at ATF2 Marcin Patecki Jürgen Pfingstner 18 th of March.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
Wakefield effect in ATF2 Kiyoshi Kubo
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Progress in CLIC DFS studies Juergen Pfingstner University of Oslo CLIC Workshop January.
Wakefield of cavity BPM In ATF2 ATF2 Project Meeting K.Kubo.
ATF2 Status N.Terunuma, KEK
Intensity dependence of Beam size at IP and Wakefield in ATF2
Wakefield Effect at ATF2
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Update on HL-LHC triplet fingers
Follow up on SPS transverse impedance
Wakefield simulations for ILC cavity
ATF2 Recent Wakefield (Beam size Intensity dependence) Studies
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
Presentation transcript:

Wakefield Calculations for the ATF2 Beamline A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK) Y.-I. Kim (JAI/Oxford, UK) K. Kubo, N. Terunuma (KEK, Japan) G. White (SLAC, USA) A. Lyapin, John Adams Institute, Royal Holloway, University of London

Accelerator test facility/ATF A. Lyapin, Wakefield Calculations for the ATF2 Beamline 2 Low-emittance facility, test system for 35 nm beam size next LC beam delivery system Very dense with instrumentation: wire scanners, OTRs, laserwires, laser interference BSM Relies mainly on cavity BPMs, currently ~ 40 in total

Problem A. Lyapin, Wakefield Calculations for the ATF2 Beamline 3 Difficulties achieving < 100 nm vertical beam size at the IP Low charge operation gives better results Suspected wakefield effects Extraction beamline includes ~ 40 cavity BPMs + several reference cavities Started investigations into the wakes produced by these cavities as transverse wake kicks may affect the transverse beam size, which spread onto other beam elements as well as additional beam measurements…

ATF2 CBPM system A. Lyapin, Wakefield Calculations for the ATF2 Beamline 4 BPM test area Strip line/Cavity BPMs (mounted rigidly) C-band BPMs (mounted on movers) S-band BPMs (movers) IP region

Wakefields A. Lyapin, Wakefield Calculations for the ATF2 Beamline 5 K. Bane, A. Seryi Created due to interaction of the electromagnetic fields travelling with the beam with the walls of the beam chamber 2 components are considered Resistive wake due to the finite conductance of the walls (more important when short bunches are considered in narrow chambers) Geometric wake due to changes in the chamber size/geometry Here considering geometric wakes only More detail at

Wakefields (2) A. Lyapin, Wakefield Calculations for the ATF2 Beamline 6 Geometrical wakes computed numerically Using a finite difference code GdfidL (running on a cluster at RHUL), rectangular mesh The beam is represented as a line charge traveling along the z-axis with a possibility to specify offsets in x and y, Gaussian distribution in z

Wakefields (3) A. Lyapin, Wakefield Calculations for the ATF2 Beamline 7 Interested in transverse wakes  transverse kicks  beam size effects Typically strong dependence on the bunch length for ATF2 parameters (7-10 mm) and geometries Transverse wake is quite linear vs. offset

C-band CBPM A. Lyapin, Wakefield Calculations for the ATF2 Beamline 8 Main suspect High-impedance device (to provide a high position sensitivity) ~40 cavities in the beamline, the effect may be multiplied (although this depends on the orbit and alignment)

C-band reference A. Lyapin, Wakefield Calculations for the ATF2 Beamline 9 Higher impedance than position cavity (smaller aperture and diameter) Used to be 4 in the beamline, now 1 providing the reference signal and 2 in the test location (on which more later)

Bellows A. Lyapin, Wakefield Calculations for the ATF2 Beamline 10 A very difficult geometry to simulate – flexible, can be in many states throughout the machine, can be extended/contracted most can also be offset in one end with respect to the other ATF2 beamline probably includes ~100 bellows A best guess simulation shows a wake similar to cavity BPMs both in shape and magnitude

IPBPM A. Lyapin, Wakefield Calculations for the ATF2 Beamline 11 Unique geometry – very small aperture in y Strong kick in vertical Location close to the IP Currently 2 devices before the IP Requirements on the alignment need to be understood (may affect the BPM's operation as well as the wakefields, which may contribute to the IPBSM background)

Other elements A. Lyapin, Wakefield Calculations for the ATF2 Beamline 12 Beam aperture steps – many DIA steps (around BPMs) S-band BPMs Gate valves Vacuum pump ports Experiment locations (chambers) Mostly smaller quantities/kicks Work is still in progress

Naïve totals A. Lyapin, Wakefield Calculations for the ATF2 Beamline 13 ElementPeak wake, V/pC/mm QuantityContribution, V/pC/mm Bellows C-band position IPBPM (vert.) mm transitions C-band reference Vacuum port (X) Offsets and proximity to the IP are important (not taken into account here) The major contribution may come from the bellows! Unfortunately, they are the most difficult element to simulate, and their state throughout the line is unknown, can only guess the average Position cavities are likely to be much better aligned compared to other elements Some components are omitted, also there may be hidden contributions Measurements are required to confirm

Wakefield kick measurements A. Lyapin, Wakefield Calculations for the ATF2 Beamline 14 Reference cavity on a mover in a high beta location MREF3FF A second cavity added later to multiply the effect Used for studying the wakefields, can also be used for corrections

Wakefield kick measurements (2) A. Lyapin, Wakefield Calculations for the ATF2 Beamline 15 Wakefield kicks can be seen in downstream BPMs (showing QD2AFF) Used upstream BPMs for jitter subtraction (subtract prediction made using upstream BPMs from actual data) There is a clear effect, however, the kick is larger than expected from just the BPMs, need to take into account all the contributions in the test setup: bellows, steps, etc; then the balance is roughly right

Wakefield measurements (3) A. Lyapin, Wakefield Calculations for the ATF2 Beamline 16 Simplified tracking simulations (2-bunch model, may result in an overestimate) Corresponding kick V/mm/pC Bellows are not at the same offset, so the estimate is between 0.32 and 0.52 V/mm/pC Figures shown are for different charge (via laser power) and bunch length (via damping ring RF voltage) settings

Summary Wakefields may be affecting the transverse beam position and size There are several main beamline components which are likely to provide the major contributions, so far these seem to be: bellows, C-band BPMs, aperture transitions and potentially IPBPMs Many elements haven't been fully studied yet, and probably some haven't yet been identified (aperture steps around IPBPMs, for example) Wakefield kicks have been measured and a reasonable agreement with the models is in place, the same setup can be used for compensating the wakefield effects and minimising the beam size Further studies (planned for April) will include:  Bunch length measurements (with a streak camera for cross-calibration)  Bunch length and charge scans, more set points to see the dependencies (note that the bunch length and charge seem to be coupled)  Possibly removal of the cavities and their replacement with blank pieces (to establish the baseline) and/or additional bellows (to measure their wakes) A. Lyapin, Wakefield Calculations for the ATF2 Beamline 17