EURAILSPEED - Milano – November 8th, 2005 MGV SNCF Train Set for on-board Measurement at Great Velocity Eric REBEYROTTE– Technical Manager of SNCF Engineering.

Slides:



Advertisements
Similar presentations
Seminar Report On Digital Power Line Carrier Communication
Advertisements

Dynamic monitoring of traffic signs on roadways. INTRODUCTION TRAFFIC SIGNS ALONG ROADWAYS Approximately half of traffic accidents in developed countries.
Localization with RSSI Method at Wireless Sensor Networks Osman Ceylan Electronics Engineering PhD Student, Istanbul Technical University, Turkiye
Quality of Service in a GSM-R PPP Jean CELLMER UIC ERTMS 2014.
Introduction of FUTÁR System. Basic data of FUTÁR System Devices to be installed The investment cost of project: EUR Vehicle consolidated with.
HIGHT SPEED LINE MAINTENANCE. Madrid-Sevilla Line:1992 Madrid-Lleida Line: 2003 Maintenance Bases Infrastructure, Track, Catenary and Power Supply. Control.
Traction Control of Electric Locomotives
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
Smart Sensor Technology For Rail Network health Hawk Measurement Systems.
Thales Axle Counter The Challenges for a modern Train Detection System
RAD ISM 01/2011 Slide 1 Wireless Mobility System.
VERTEX STANDARD is registered in the US Patent & Trademark Office. All other product or service names are the property of their respective owners. © Vertex.
Koos Kunneke – MMIS Analyst Corne Engelbrecht – Maintenance Engineer Advance Asset Condition Assesment.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Office of Research and Information Technology Wireless Roadside Inspection Pilot Tests Chris Flanigan FMCSA/Office of Analysis, Research, and Technology.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
Chapter 26 Communication Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify common.
Communication and Ground Station 12 October 2008.
CE 515 Railroad Engineering
UPM TRANSPORT RESEARCH GROUPS UNIVERSIDAD POLITECNICA DE MADRID SPAIN
InterSwyft Technology presentation. Introduction InterSwyft brings secured encrypted transmission of SMS messages for internal and external devices such.
SCADA and Telemetry Presented By:.
InSeT System Inertial Sensor Tracking System Underground Mine Safety For Personnel Utilizing Inertial Sensors Technical Presentation.
EurailSpeed Milano 2005 Siemens Transportation Systems The Transrapid Maglev System a necessity for the growing mobility market a necessity for trackbound.
DCA Company Confidential Data Center Associates IT, Environmental, & Digital Surveillance Solutions… … On Time, On Budget.
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
Intelligent Transportation System (ITS) ISYM 540 Current Topics in Information System Management Anas Hardan.
Future Road Map – Modern Control, Command Signalling Systems BY Anshul Gupta DRM, Adra, South Eastern Railway Secretary, Institution of Railway Signal.
COMPUTER&AUTOMATIONCOMPUTER&AUTOMATION RESEARCH INSTITUTERESEARCH INSTITUTE Systems and Control Laboratory1 Commercial Vehicle Fleet Management System.
Peter Gurník, Oldřich Trégl Satellite based train location.
UIC ERTMS World Conference
PI on a Mini-PC PI on a Mini-PC Remote Data Collection with Intelligence Roland Heersink Industrial Evolution Chuck Wells OSIsoft.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
Flexible, Modular Interlocking Systems for a modern railway network
WIRELESS REVOLUTION Robert Boyd Robert Wall Wanda Mattie.
Korea Rail Network Authority, Republic of Korea. Contents Introduction Organizations - KRNA Overview of KOREA’s High Speed Rail development Background.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Presentation to Working Group ERTMS on DB SNCF RFF 1 ERTMS PILOT PROJECT Paris - Frankfurt corridor & ICE3 and POS trainsets DB/RFF/SNCF common.
20/06/051 Technology Challenges for 350 km/h EurailSpeed 7-9 November 2005 Session E1 Louis-Marie CLEON I&R Technical Director.
Wireless Sensing and Control of the Indoor Environment in Buildings  Objective: Develop techniques to improve building operation through intensive wireless.
PC Internal Components Lesson 4.  Intel is perhaps the most recognizable microprocessor manufacturer. List some others.
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
Detector Derailment Device (&) Frenado (Braking) Automatic Train
Davinder Pal Singh Bawa B.Tech [ECE] 6 th sem CTIT,Shahpur.
INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE.
1 Overview on Railway Applications of GSM-R Robert SARFATI SYSTRA GSM-R Operators Group Chairman UIC ERTMS conference 2006.
Application Analysis on TD-LTE Train-to-ground Wireless Telecommunications Zhengzhou Metro Co., Ltd. Zhengzhou Rail Transit Design and Research Institute.
SPK – 4 Golomazov Artem in my life. Hello! My name is Artem and I’d like to tell you about Information Technology by using Information Technology! It.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Developments aiming to improve traffic safety on the network of GYSEV Zrt Február 7. Gócza József.
NETWORKING OF GPS., SENSORS AND SOFTWARE SYSTEMS WITH DBMS (APPLICATION TO INDIAN RAILWAYS)
GRRF Ad-Hoc Working Group
Elizabeth G. Jones Assoc. Professor of Civil Engineering and
Constraints Space Load Capacity Costs Operating hours.
By ASST. Prof. DR. ASEEL BASIM
Sustainable maintenance of high-speed lines with mixed traffic
Telecommunications & Electronics
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
COAXIAL CABLE.
SRS for tramway and busses
Date of download: 1/3/2018 Copyright © ASME. All rights reserved.
IOT & Railway rolling stock
Wireless Industrial Networking Alliance The Promise of Wireless
PLC’s Are ... Similar to a Microcontroller: Microprocessor Based
UNH Precision Racing Data Acquisition, Telemetry and Analysis
Chapter 5 – Distributed Elements
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

EURAILSPEED - Milano – November 8th, 2005 MGV SNCF Train Set for on-board Measurement at Great Velocity Eric REBEYROTTE– Technical Manager of SNCF Engineering EURAILSPEED - Milano –November 8th, 2005

OBJECTIVES FOR THE MGV PROJECT Railway infrastructure is RFF property, but is operated and maintained by SNCF, which is the owner of measurement sets. The MGV project (Measurement at Great Velocity) tends to replace a lot of different specialized on-board measuring sets, operating at various speeds, by a single high speed set (except for ultrasonic rail control). MGV will operate on both high speed network and classical electrified network. Area of supervision: all high speed lines and their connections to the classical network, main electrified classical lines ( km).

EURAILSPEED - Milano – November 8th, 2005 BENEFITS OF THE PROJECT The speed of the train (measurement at maximum line speed) allows it to be mixed with commercial trains, in order to maximize the infrastructure capacity. The drastic reduction of specialized on-board measuring on-board sets (MGV replaces 4 sets) also contributes to the infrastructure capacity. The measuring devices are modernized, and enhanced by adding new ones. The data is digitized and collected in an IT process system. The processing and validation is done in real time. The control periodicity is increased at lower costs. Control periodicity: High speed lines, every 15 days, Classical lines, every 3 months. Operating conditions: Inspections : 48 weeks/year, Maintenance of train and systems: 1 week / 3 months.

EURAILSPEED - Milano – November 8th, 2005 THE MGV  Crew of 7 persons.  Tricurrent “réseau” TGV 4530: 2 engines 8 trailers including: 4 for the measures 1 for welcoming the visitors 3 dedicated to logistics The MGV is built by refurbishment of the latest tricurrent (DC 1,5 and 3 kV, AC 25 kV) ‘réseau’ TGV manufactured (1995). This work is done by SNCF. The train set is now completed, and will be equiped with measuring devices till the end of 2005.

EURAILSPEED - Milano – November 8th, 2005 Ceiling and lamplights installation view Walkthrough corridor Operators ’ working zone (in open space) 19 ’’ cabinets for electronic racks with access on both sides Overall technical floor for cable equipment Cabinet installation view Overall technical floor installation view Roof observation structure REFURBISHING VIEWS

EURAILSPEED - Milano – November 8th, 2005  The MGV speed (320 km/h) requires systematic safety studies to design and to implement the measuring devices and the fittings, in terms of Reliability, Availability, Maintainability, Safety (RAMS). This is a major constraint of the project.  The MGV length (200 m) requires to federate information by means of a common localization, compensated by the location of the on-board receivers. MEASUREMENT SPECIFICITIES (1/2)

EURAILSPEED - Milano – November 8th, 2005  SNCF has written specifications for every measuring device, and has chosen its contractors for the design and implementation. For catenary a preliminary research was necessary. A project team has been dedicated to this coordination task.  The MGV crew will measure, compute and validate the data in real time up to 320 km/h. It will manage the abnormal values and transmit them to the maintenance centre for eventual alerts, in slightly differed time. It will fill in the validated data within database, and will manage the transfer of all the information to a ground database. MEASUREMENT SPECIFICITIES (2/2)

EURAILSPEED - Milano – November 8th, 2005 MEASUREMENT SYSTEMS (1/3) Track Measurement  Loaded track geometry – with inertial laser measure, will replace Mauzin inspection in  Vehicle / track interaction – will replace Mélusine inspection in  Axle boxes accelerations – new : short defects analysis, effective  Rail surface defects – IVOIRE Video images RT analysis from a linear camera, effective  Wheel rotation noise – short-pitch corrugation and specific defects, effective Signalling measurement To guarantee the safety of the train itself, measuring equipments of signalling control are distinct from the similar equipments in charge. Effective 2006: KVB (speed monitoring by beacon), Icc (short-circuit current), BSP (phase-lock loop), Zt (transverse impedance), Rt (return of traction current), EPI (local transmitters of information), CRO (contact ramp). Effective 2007: ERTMS.

EURAILSPEED - Milano – November 8th, 2005 Catenary measurement  Catenary dynamics - new - effective 2006  Detection of electric arcs - new - effective 2006 additional Functionalities included later Wear of contact wire, Static geometry of the contact wire, Power frequency shape analysis Telecommunications measurement - effective 2006  Continuous radioelectric coverage measurement: ground - train radio (analogic 400 MHz), GSM-R  Measure of the GSM quality: GSM-R, GSM of the three public operators 18 antennas, including 2 GPS + 1 reservation for a satellite antenna to come. MEASUREMENT SYSTEMS (2/3)

EURAILSPEED - Milano – November 8th, 2005 Others equipments - effective 2005  Localization: precision of spatial localization is a key element to sample the provided data. The localisation messages are given by a dedicated on-board network distributed on 200 m.  Related Measures: temperature, pressure, crossing of another train, detection of special devices.  Video: localized and digitized images are associated to identified defects.  Processing systems: on-board processing systems and databases, and specific ground data bases. MEASUREMENT SYSTEMS (3/3)

EURAILSPEED - Milano – November 8th, 2005 TRAIN / GROUND INTERFACES – MAIN DATA STREAMS Ground back-office information system Measurements national server Maintenance headquarters Local maintenance computing workstations MGV on-board information system