Quality & Continuous Improvement What is quality??? Meeting or exceeding the needs of the customer. Achieving a level of perfection without defects, mistakes.

Slides:



Advertisements
Similar presentations
Quality Leadership Deming’s 14 Points as described in Total Quality Management by Besterfield et al (Ch. 2) Presented by Dr. Joan Burtner, Certified.
Advertisements

TQMTQM Total Quality Management. Fourteen Elements of TQM Create a constancy of purpose Adopt a new philosophy Cease dependence on mass inspection as.
TOTAL QUALITY APPROACH to QUALITY MANAGEMENT
1 ) Deming Management Principles of Deming Management Deming's Fourteen Points.
Quality Operations Management Intermediate Business Management.
BS2914 Quality Management & Customer Care 3: TQM Gurus [1] W.Edwards Deming 3: TQM Gurus [1] W.Edwards Deming.
“Statistics is the science of gaining information from numerical data.” -- Moore Definitions of Statistics Statistics: “the science of data involving collecting,
1 Chapters 26 & 27 By: Allen Campora and Kyle Sera BA 352.
Total Quality Management
Quality Management System
Quality is the ability of a product or service to consistently meet or exceed customer expectations. Quality Management.
Managing Quality 12 July Introduction What: quality in operations management Where: Quality affects all goods and services Why: Customers demand.
TOTAL QUALITY MANAGEMENT (TQM)
Total Quality Management(TQM) The word “total” conveys the idea that all employees, throughout every function and level of organization, pursue quality.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Project Management Chapter 9 Project Quality Management Dr. Jana Jagodick Polytechnic of Namibia, 2012.
© 2003 Prentice-Hall, Inc.Chap 13-1 Business Statistics: A First Course (3 rd Edition) Chapter 13 Statistical Applications in Quality and Productivity.
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
Issue Description APPRECIATION FOR A SYSTEM THEORY OF KNOWLEDGE UNDERSTANDING VARIATION PSYCHOLOGY August 12-14, 2015Eric Budd - "Profound Knowledge for.
14 Points for Management 1. Create constancy of purpose toward improvement of product and service, with the aim to become competitive and to stay in business,
Chapter 17 Purchasing & Quality Copyright 2006 Prentice Hall Publishing Company 1 Purchasing, Quality Control, and Vendor Analysis.
Total Quality Management Lecture #2. Types of Quality Control  Product Quality Control –Product Control focuses on the output  Process Quality Control.
Quality and Productivity Management Deming, TQM, and 6 Sigma.
5.4 Quality Assurance Chapter 33. What is a quality product? A good or service that meets customers’ expectations and is “fit for purpose”. A good or.
Total Quality Safety Management.
DEMINGS OF 14 POINTS OF QUALITY
Introduction to Quality Prepared by: Bhakti Joshi Date: December 6, 2012.
11/24/20151 CVE 5074 Leading Construction Operations Team Leadership Part VII – Ethics & Quality.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. x Process Improvement Using Control Charts Chapter 14.
Bus 2411 Production Operations Management Quality Management U. Akinc Quality Management U. Akinc.
PowerPoint Presentation by Charlie Cook Copyright © 2005 South-Western. All rights reserved. Chapter 13 Control Systems.
Quality Management Strategies. Dr. W.E. Deming A census bureau statistician A census bureau statistician Improved U.S. production during WWII Improved.
Score Sheet The BEAD-BOX GAME tm Note: Production Lot Size 50 Beads Per Operator Per Day Inspector (1) ___________________ Recorder: ___________________.
PP 500 Public Administration and Management Unit Six Seminar Dr. Bruce Bordner Kaplan University.
Chapter 17 Supply Chain Management Copyright ©2012 Pearson Education, Inc. publishing as Prentice Hall 17-1 Supply Chain Management.
Lean Office - Total Quality Management managementsupport
TOTAL QUALITY MANAGEMENT TEACHINGS OF QUALITY GURUS Dr. Mohamed Riyazh Khan- DoMS.
DEMING’S 14 POINTS Cristobal, Krizia Martin, Candice Paguiligan, Abbey Pita, Alyssa Rivera, Salve.
Theoretical Basis of the Quality Movement – Part 1: Deming’s Fourteen Points Adapted from Ch. 1 and 2 from Statistical Quality Design and Control Authors:
Total Quality Management CS3300 Fall A long time ago Made in Japan – then and now W. Edwards Demming We improve product by improving the process,
Quality Control Dr. Waddah D’emeh. Controlling Fifth and final step of the management process. Performance is measured against predetermined standards.
Definition: Total Quality Management Total Quality Management is a management approach that originated in the 1950s and has steadily become more popular.
Total Quality Management (TQM)
Deming’s 14 Principles W. EDWARDS DEMING. Create constancy of purpose for the improvement of product an service.
McGraw-Hill/IrwinCopyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 17 Process Improvement Using Control Charts.
Management of Quality. Introduction to Quality Quality Gurus W. Edwards Deming W. Edwards Deming Joseph M. Juran Joseph M. Juran Philip B. Crosby Philip.
PP 500 Public Administration and Management Unit Six Seminar Kris R. Foote, J.D. Kaplan University.
Team A MGT/420 November 5, 2012 Gregory Waters. Automobile Manufacturers Retail Stores After-Market Consumers High quality components Quality -Selling.
LECTURE 3. Quality Philosophies and Management Strategies Deming was asked to deliver a lecture on statistical quality control to management Japanese.
 The concept of Quality is very broad and can be defined in various way:  From the customer point of view: (Specification Quality) › Quality is the.
PLEASE SIT WITH YOUR GROUPS! March 7, IE 441.
Theoretical Basis of the Quality Movement Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering and Industrial.
Historical Philosophies of Quality 1. The Quality Gurus Quality Gurus – Individuals who have been identified as making a significant contribution to improving.
Deming Principles PROGRAM PRESENTATION
ECE362 Principles of Design
5.4 Quality Assurance Chapter 33.
HOME MEDICAL CARE Deming's 14-Point Philosophy-Quality
TOTAL QUALITY MANAGEMENT
Preventing Abuse, Neglect, & Exploitation
Introduction to Quality and Statistical Process Control
Process Improvement: Quality Assurance, Control, and Management
TOTAL QUALITY MANAGEMENT (TQM)
Supervisory Control and Quality
Theoretical Basis of the Quality Movement
Theoretical Basis of the Quality Movement
The Development of Modern Management
The Red Bead Game 1.
Theoretical Basis of the Quality Movement
Theoretical Basis of the Quality Movement – Part 1: Deming’s Fourteen Points Adapted from Ch. 1 and 2 from Statistical Quality Design and Control Authors:
Theoretical Basis of the Quality Movement
Presentation transcript:

Quality & Continuous Improvement What is quality??? Meeting or exceeding the needs of the customer. Achieving a level of perfection without defects, mistakes or omissions. In construction: –Using specified materials –With correct installation –Finishing on time & budget with no claims or litigation. Quality workmanship needs to be a personal and corporate mindset.

ISO 9001 International Organization for Standardization Based in Switzerland but guidelines have been adopted and required worldwide Set of systematic approaches for managing the quality of work. 1.Focus on your customers 2.Provide leadership 3.Involve your people 4.Use a process approach 5.Take a systems approach 6.Encourage continual improvement 7.Get the facts before you decide 8.Work with your suppliers

Quality Assurance (QA) Management systems employed to produce consistent high-quality work. Hiring of qualified employees Safety programs Training & continuing education Incentive & reward programs Procurement systems for identification of high quality suppliers.

Quality Control (QC) Inspection of work to ensure it meets a specified level of quality –Accepting or rejecting work based on its compliance with quality specifications. QC used interchangeably with QA terms, but QC is a part of work produced while QA is an overall program. Low bid work does not always equate to high quality work. –High Quality contractors can negotiate for work after their quality levels are established.

Total Quality Management (TQM) Based on Japanese Automaker QC programs. System of continuous improvement. Made famous by W. Edwards Deming. Companies should be judged by their future planning.

14 TQM Points 1."Create constancy of purpose towards improvement". Replace short-term reaction with long-term planning. 2."Adopt the new philosophy". The implication is that management should actually adopt his philosophy, rather than merely expect the workforce to do so. 3."Cease dependence on inspection". If variation is reduced, there is no need to inspect manufactured items for defects, because there won't be any. 4."Move towards a single supplier for any one item." Multiple suppliers mean variation between feed stocks. 5."Improve constantly and forever". Constantly strive to reduce variation. 6."Institute training on the job". If people are inadequately trained, they will not all work the same way, and this will introduce variation. 7."Institute leadership". Deming makes a distinction between leadership and mere supervision. The latter is quota- and target-based. 8."Drive out fear". Deming sees management by fear as counter- productive in the long term, because it prevents workers from acting in the organization's best interests. 9."Break down barriers between departments". Another idea central to TQM is the concept of the 'internal customer', that each department serves not the management, but the other departments that use its outputs. 10."Eliminate slogans". Another central TQM idea is that it's not people who make most mistakes - it's the process they are working within. Harassing the workforce without improving the processes they use is counter-productive. 11."Eliminate management by objectives". Deming saw production targets as encouraging the delivery of poor-quality goods. 12."Remove barriers to pride of workmanship". Many of the other problems outlined reduce worker satisfaction. 13."Institute education and self-improvement". 14."The transformation is everyone's job".

Quality in Design Projects Utilize a system of independent checks and back checks to help ensure that: –Proper procedures have been used to prepare project. –Once chosen, the calculations and plans have been properly prepared correctly. Use a standard Check, Back- check, Fix and Final Check system.

Construction Engineering Technology Program Group Project QA/QC Procedures In order to produce better group projects as well as learn the techniques of the process of design quality assurance, the following procedures have been established to be used on design projects within the CET program when working in groups of two or more. 1.When an initial design step has been completed by a student member of a project team, a copy of their design calculations should be made and given to another team member for checking. The designer’s initials and date of design should be clearly on the original design in pencil. 2.CHECK: The checker should then proceed to review the team member’s design in order to verify that every calculation, assumption and detail is correct. (This process is nearly like doing the initial design except that you already have a design to follow. ) –While checking use a RED pencil or pen to signify problems within the design whether they are questions regarding the process or just errors. –Use a YELLOW pencil or pen to highlight everything in the design that is correct. –A design is completely and correctly checked when everything has received a red or yellow mark. –The checker then initials and dates the check set in RED and returns the check set to the designer. 3.BACKCHECK & FIX: The original designer now needs to review the checked design and rectify each error or answer all of the checker’s questions to the checker’s satisfaction. Changes (fixing errors or changing the design due to checker’s questions) should be fixed on the ORIGINAL DESIGN SHEETS. During the backckeck, the designer should mark off or answer the checker’s red marks using a GREEN pencil. The backcheck is complete when all of the red marks have been answered or checked off in GREEN. The Designer should initial the check set in GREEN. 4.After the checker is satisfied that all of the corrections have been made they can then initial the original calculations in pencil or pen to signify that the checking process has been performed correctly. All check sets should be included with whatever deliverables are required for submission for the project to be graded. Check sets should be labeled as such and should be placed behind the submittal set. Work should not continue on major portions of the project until the previous supporting work has been checked. Use logical groupings of work to be checked to avoid bogging down the design process. However, the more design steps that are done prior to checking creates the risk of having to correct more work if something is incorrect at the beginning. Have checks performed at intervals that keep work flowing but not proceeding without assurance that it is correct. It may be best to switch off design and checking tasks throughout the design process.

Quality Control in School Work Start by embracing quality now!!! Strive to do your best in your work: –Don’t be a minimalist! –Continually improve & learn from your mistakes. –Check your work: Answer all the questions Read Directions Document Neatly Look for errors Question everything!! Take pride in your work! It is a reflection on you!!!