THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.

Slides:



Advertisements
Similar presentations
Object Oriented Analysis And Design-IT0207 iiI Semester
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Software Quality Assurance Plan
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Project Management Workshop. Nick Cook  Citigroup Corporate and Investment Bank  European Technology Business Office Manager Edinburgh University April.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
SE 555 Software Requirements & Specification Requirements Validation.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
LSU v9/08/05LA ACES Overview1 Overview of the LA ACES Program A summary of the motivation, components and expectations of this Louisiana-wide student ballooning.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
LSU 10/09/2007Risk Management1 Risk & Risk Management Project Management Unit #5.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
LSU 10/09/2007System Design1 Project Management Unit #2.
LSU 07/25/2004Estimating Costs1 Estimating Project Costs & Time Project Management Unit, Lecture 5.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
What are MRLs ? Alfred W. Clark Dawnbreaker, Inc.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Speed of Sound Team BalloonWorks. Table of Contents Mission Goal and Objectives Science and Technical Backgrounds Mission Requirements Payload Design.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Effective Methods for Software and Systems Integration
Systems Analysis and Design: The Big Picture
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
LSU 05/02/2006Launch Trip1 The LaACES Launch Trip Ballooning Unit, Lecture 6.
CCSB223/SAD/CHAPTER141 Chapter 14 Implementing and Maintaining the System.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
RUP Fundamentals - Instructor Notes
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
LSU 05/13/2004Mechanical Design Guidelines1 Ballooning Unit, Lecture 4.
From Research Prototype to Production
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
LSU 01/17/2006Spring LaACES Schedule For the semester and the next few weeks.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Project Management, Lifecycle and Documentation
ACES Spring 2003 Overview Where are we going? How are we going to get there?
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Systems Development Life Cycle
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Critical Design Review (CDR)
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member Mr. David Hancock, Science Software Development.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
LSU v09/08/05SBC Overview1 Introduction to the LA ACES Student Ballooning Course A summary of the motivation, contents and status of the materials available.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Testing throughout Lifecycle Ljudmilla Karu. Verification and validation (V&V) Verification is defined as the process of evaluating a system or component.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Chapter 6: Database Project Management
Software Requirements
Level 1 Level 1 – Initial: The software process is characterized as ad hoc and occasionally even chaotic. Few processes are defined, and success depends.
Space Proximity Atmospheric Research above Tropospheric Altitudes
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Lockheed Martin Canada’s SMB Mentoring Program
PSS verification and validation
Project Management Unit #2
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Software Reviews.
Presentation transcript:

THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1

GOAL OBJECTIVE LSU 01/18/2005 PROJECT LIFE CYCLE 2 To Understand project phase To mastering process flow during life cycle To implment Preliminary Design Review (PDR) To implment Critical Design Review (CDR) To implment Flight Readines Review (FRR)

THE PROJECT PHASES All projects complete roughly the same phases from inception to completion LSU 01/18/2005 PROJECT LIFE CYCLE 3 OPERATION DESIGNPDR DEVELOPMENTCDR FABRICATION INTEGRATION TESTINGFRR

THE DESIGN PHASE Little to no hardware testing or prototyping Define science goals and objectives System level design (subject of Lecture 3)  System requirements derived from goals and objectives  Identify major subsystems and interfaces Concept hardware and software design  Derived from system requirements and constraints  Identify parts, costs & availability Establish tasks, schedule, resource needs and plans for remaining phases of life-cycle Develop preliminary risk assessment & management plan Phase terminates with Preliminary Design Review (PDR) LSU 01/18/2005 PROJECT LIFE CYCLE 4 “Paper” study of all issues to establish major concepts and plans

THE DEVELOPMENT PHASE - 1 Test concepts by prototyping  Not building flight hardware  Used to gain information necessary to refine or finalize a design  Applies to structure, electronics, sensors and software Finalize hardware & software design  Complete system design  Define interfaces and develop appropriate Interface Control Documents (ICD)  Complete detailed design LSU 01/18/2005 PROJECT LIFE CYCLE 5 Design Prototype Test Complete Design Detailed in-depth study when all design components are finalized

THE DEVELOPMENT PHASE - 2 Purchase long lead items (identified at PDR) Finalize plans for pre-flight phases  Fabrication, integration, calibration and testing  Tasks, schedule, procedures, resource needs, costs Update risk assessment & management plan  Preliminary plan should already be in use for tracking and mitigating risks during development Develop preliminary mission operations & data analysis plan Phase terminate with Critical Design Review (CDR) LSU 01/18/2005 PROJECT LIFE CYCLE 6

THE FABRICATION PHASE LSU 01/18/2005 PROJECT LIFE CYCLE 7 Training Integration Thermal Test QA / QCAssembly Order Parts Inspect/Test Parts procurement –Test that parts satisfy flight requirements before assembly Assemble hardware & software subsystems –Training may be required for particular assemblies –Fabricate component with qualified parts –If part fails initial inspection and testing, return to assembly for rework / fixing –If part fails thermal testing return to assembly for rework / fixing Once complete move to integration Implement construction of flight components

THE INTEGRATION PHASE Make sure all parts fit together, if not then rework Make sure power system is delivering proper voltage and current Connect electronics and sensors Install software and run Fix issues before proceeding to system testing LSU 01/18/2005 PROJECT LIFE CYCLE 8 Fit Check System Testing IntegrateFix Test Subassemblies are put together to make the final package

THE SYSTEM TESTING PHASE Payload flight certification LSU 01/18/2005 PROJECT LIFE CYCLE 9 Functional Test FRR Fix Calibration Thermal Test Pressure Test Shock Test Check Calibration Integrated payload must first be fully functional Calibration values are determined –Sensors, ADC gain, timing Payload must function correctly during thermal, pressure & shock testing –If not, fix and begin again –If OK, then validate calibrations Test and test data must be documented Proceed to Flight Readiness Review

MISSION OPERATIONS & DATA ANALYSIS (MO&DA) Mission Operations plan includes the following  Sequence of operations to prepare payload for vehicle integration  Sequence of operations to prepare payload for launch  Flight profile requirements  Operations, commanding, contingencies during flight  Recovery handling and operations Data Analysis plan describes what happens to the flight data  Flight data handling, processing and analysis sequence  Specify data required from vehicle LSU 01/18/2005 PROJECT LIFE CYCLE 10 Operate payload during flight & obtain science results

PROCESS FLOW DURING LIFE CYCLE Effort focus changes as a function of phase  Design can be highly theoretical involving simulations and calculations  Development involves “experiments” and testing concepts to gain information necessary for the design  Fabrication, Integration, and System testing requires skilled technical help to realize the design in hardware and software  MO&DA requires “scientists” to direct the proper use of the payload and to turn the data into science results Resource needs and costs changes as a function of phase  Design requires no hardware and few personnel  Development costs increase a bit with some prototyping  Major cost in personnel and hardware is in fabrication, integration and testing  MO&DA drops down to no hardware and few personnel LSU 01/18/2005 PROJECT LIFE CYCLE 11

PROJECT RISK MANAGEMENT “The essence of project management is risk management” LSU 01/18/2005 PROJECT LIFE CYCLE 12 Probability of a disaster decreases during the life of a project Cost to recover from a problem increases during the project Catch & correct problems early!

PROJECT MILESTONES There are three major reviews during the project Preliminary Design Review (PDR)  Follows design phase Critical Design Review (CDR)  Follows development phase Flight Readiness Review (FRR)  Prior to flight The team must prepare written documents and oral presentations for each review LSU 01/18/2005 PROJECT LIFE CYCLE 13

PRELIMINARY DESIGN REVIEW (PDR) The PDR should cover results from your design phase including:  Goals & objectives  Preliminary System design  Concept hardware & software design  Tasks, schedule, resource needs, long-lead items  Preliminary risk assessment & management plan Should show that you have “thought the problem through” Include written document and oral presentation  Format of document will be discussed in Lecture 8 A member of the LA ACES Project will attend and participate in the PDR LSU 01/18/2005 PROJECT LIFE CYCLE 14

CRITICAL DESIGN REVIEW (CDR) The CDR should cover results from your development phase including:  Resolving issues identified during the PDR  Prototyping results and “proven” designs  Completed system design and defined interfaces  Finalize tasks, schedule, procedures and costs  Updated risk assessment & management plan  Preliminary MO & DA plan Determines whether you are ready to begin building your payload Include written report and oral presentation Precise date for CDR should be identified during PDR LSU 01/18/2005 PROJECT LIFE CYCLE 15

FLIGHT READINESS REVIEW (FRR) The FRR reviews all aspects of your payload  Documentation of as-built configuration  Is payload safe?  Will payload perform properly?  Does payload satisfy the flight constraints? The FRR will determine whether you are allowed to attach your payload to the flight vehicle! Written FRR document sent to LA ACES Project 2 weeks before flight Oral FRR presentation during the launch trip Details about what is expected during the FRR are provided in Ballooning Unit, Lecture 5 LSU 01/18/2005 PROJECT LIFE CYCLE 16

PRELIMINARY LSU 2005 SCHEDULE Payload ConceptJanuary 25 PDRFebruary 17 CDR (specify at PDR)(March 24) FRR DocumentMay 9 Launch TripMay 22 – 26  FRR DefenseMay 23  Launch, Flight OpsMay 24  Data AnalysisMay 25  Science PresentationMay 26 LSU 01/18/2005 PROJECT LIFE CYCLE 17