JRA Execution Plan 13 January 2003 - 1 JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.

Slides:



Advertisements
Similar presentations
LCSC October The EGEE project: building a grid infrastructure for Europe Bob Jones EGEE Technical Director 4 th Annual Workshop on Linux.
Advertisements

DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
EGEE is a project funded by the European Union under contract IST JRA4 Execution Plan and Brainstorming Javier Orellana JRA4 Coordinator EGEE.
The OMII Perspective on Grid and Web Services At the University of Southampton.
EGEE (EU IST project) – Networking Activities 4: biomedical applications NA4 Biomedical Activities Johan Montagnat First EGEE Meeting Cork,
EGEE is a project funded by the European Union under contract IST EGEE Middleware Erwin Laure Deputy Middleware Manager Induction to the EGEE.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
EGEE Organisation Steve Fisher / RAL 4-5/3/2004 This talk will cover a number of issues. The structure may be hard to discern.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
Security Area in GridPP2 4 Mar 2004 Security Area in GridPP2 “Proforma-2 posts” overview Deliverables – Local Access – Local Usage.
EGEE is a project funded by the European Union under contract INFSO-RI Summary M-E Bégin & B. Jones EGEE Technical Coordination All Activity Meeting,
EGEE is a project funded by the European Union under contract IST JRA3 Security Åke Edlund Security Head PEB All-Activity Meeting, June 18,
EGEE is a project funded by the European Union under contract IST JRA1-SA1 requirement gathering Maite Barroso JRA1 Integration and Testing.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
EGEE is a project funded by the European Union under contract IST EGEE Middleware Frédéri c Hemmer GridPP 10 Meeting, 4 th June
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
LCG LCG Workshop – March 23-24, Middleware Development within the EGEE Project LCG Workshop CERN March 2004 Frédéric Hemmer.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
WP3 Information and Monitoring Rob Byrom / WP3
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
EGEE is a project funded by the European Union under contract IST Generic Applications in EGEE-NA4 Roberto Barbera NA4 Generic Applications.
Bob Jones EGEE technical director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract IST
LCG CERN David Foster LCG WP4 Meeting 20 th June 2002 LCG Project Status WP4 Meeting Presentation David Foster IT/LCG 20 June 2002.
EMI INFSO-RI Software Quality Assurance in EMI Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
INFSO-RI Enabling Grids for E-sciencE Quality Assurance Gabriel Zaquine - JRA2 Activity Manager - CS SI EGEE Final EU Review
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
INFSO-RI Enabling Grids for E-sciencE Technical Overview Bob Jones, Technical Director, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
Last update: 03/03/ :37 LCG Grid Technology Area Quarterly Status & Progress Report SC2 February 6, 2004.
EGEE is a project funded by the European Union under contract IST ARDA Project Status Massimo Lamanna ARDA Project Leader NA4/HEP Cork, 19.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
Bob Jones EGEE designated technical director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
JRA1 Activity Feedback Frédéric Hemmer EGEE Middleware Manager and the JRA1 team EGEE is a project funded by the European Union under contract IST
Induction: What is EGEE? –April 26-28, EGEE organisation and procedures John Murison, EGEE Training Team EGEE is funded by the European Union.
All Activities Meeting – 13/14 Jan SA2 Execution Plan for the first year Franck Bonnassieux CNRS/UREC EGEE is proposed as a project funded by.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
JRA1 Middleware re-engineering
Bob Jones EGEE Technical Director
JRA2: Quality Assurance
Regional Operations Centres Core infrastructure Centres
EGEE Middleware Activities Overview
SA3’s Responds to the Review Report
Managing the Project Lifecycle
JRA3 Introduction Åke Edlund EGEE Security Head
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
EGEE and Induction Mike Mineter NeSC Training Team
JRA1 (Middleware) Overview
Bob Jones EGEE Technical Director
Leanne Guy EGEE JRA1 Test Team Manager
Wide Area Workload Management Work Package DATAGRID project
Presentation transcript:

JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European Union under contract IST

JRA Execution Plan 13 January Objectives Provide robust, supportable middleware components Select, re-engineer, integrate identified Grid Services Evolve towards Services Oriented Architecture Adopt emerging OGSI standards Multiple platforms Selection of Middleware based on requirements of The applications (Bio & HEP) In particular requirements are expected from LCG’s ARDA & HepCALII The Operations E.g. deployment, updates, packaging, etc.. Support and evolve of the middleware components Evolve towards OGSI Define a re-engineering process Address multiplatform, multiple implementations and interoperability issues Define defect handling processes and responsibilities ARDA has completed the RTAG. A new prototyping activity is starting, but not in a stage yet we can do planning. LCG has decided to take ownership of the LCG-2 code and to ensure their own support. This has impact on JRA1, at least for the CERN part

JRA Execution Plan 13 January Partners

JRA Execution Plan 13 January Milestones and Deliverables for the first year Month Deliverables & Milestones ItemLead Partner M03MJRA1.1Tools for middleware engineering and integration deployedCERN M03DJRA1.1(Document) Architecture and Planning (Release 1)CERN M03MJRA1.2Software cluster development and testing infrastructure available CERN M05MJRA1.3Integration and testing infrastructure in place including test plans (Release 1) CERN M05DJRA1.2(Document) Design of grid services (Release 1)CERN M09MJRA1.4Software for the Release Candidate 1CERN M10MJRA1.5Integrated Release Candidate 1 enters testing and validation period (Release 1) CERN M12DJRA1.3(Software) Software and associated documentation (Release 1) CERN

JRA Execution Plan 13 January Product Breakdown Structure (TA) Tools TestingIntegrationInformation Services Workload Management Services Data Management Security Resource Brokering Resource Access Accounting Logging Bookkeeping EGEE JRA1 Regression Test Testing Processes and Procedures

JRA Execution Plan 13 January Product Breakdown Structure (ARDA) ToolsTestingIntegrationGrid Access Services Workload Management Services Data Management EGEE JRA1 Authentication Authorization Information Services Auditing Services Accounting Services Site Gatekeeper Packaging Services This will further be detailed based on preparation of the prototype

JRA Execution Plan 13 January Task Breakdown

JRA Execution Plan 13 January Effort needed and responsibilities

JRA Execution Plan 13 January Training requirements

JRA Execution Plan 13 January Risk analysis

JRA Execution Plan 13 January Issues related to other activities

JRA Execution Plan 13 January Changes to Technical Annex Minor changes such as LCG-2 replaces LCG-1 ARDA and HEPCal II have completed Prototype work But does this pertain to the TA?

JRA Execution Plan 13 January Steps needed before project startup Finalize hiring and define training needs Complete table 4.5 Setup Engineering Management Team Define membership into Security group Define membership in QA Group Define membership in Architecture Team Set up development and implementation guides Complete the ARDA services document Check compatibility with non-Physics applications Validate security model Start the ARDA prototyping activity (with EGEE unfunded effort) Understand the support model as proposed by SA1 Define a process to obtain SA1 requirements Clusters to come with a task breakdown

JRA Execution Plan 13 January Other points to be addressed in the near future JRA1: Current Software - organise continued support for software currently deployed on LCG service by identifying the groups responsible for each module. Establish composition of engineering management board and architecture group Assess the suitability of the GT3 as a OGSI implementation taking into account the list of selection criteria previously established. Clarify plans for the suggested "pilot project" to investigate an OGSI based prototype grid Middleware suite Software Clusters (CERN, Italy, NEG, UK) to clarify plans for their development, integration and testing testbeds in terms of scale, sites and support. Deployment: understand what tools and mechanisms will be used for software packaging and distribution Clarify the relationship with fabric mgmt software and what is expected from it compared to grid Middleware. JRA2 (all points in discussion with JRA1, JRA3): Clarify which parts of LCG SPI can be reused in EGEE. Produce templates for all deliverables, and other important documents of the project. Produce schedule for review of deliverables in PM1-3 including identifying activities that should provide reviewers and moderators. Expand all steps of software development process to clarify what artifacts are to be produced, when and by which groups. Establish composition, management and organization of the Quality assessment group (QAG) Understand what training will be necessary for the software process and tools and establish a training schedule in conjunction with NA3.. JRA3: Need to clarify role of VOMS with INFN and who will support it (not clear in Technical Annex). Establish process and sources of input for requirements survey (MJRA3.1, PM3) Define role, scope organization composition and management of the European Grid Policy Management Authority (PMA) (MJRA3.2, PM3) Clarify the relationship between the PMA and the grid policy forum to be established by NA5. While it is not scheduled until PM4, the content of MJRA3.3 (OGSA SEC service initial recommendations for re-engineering) will probably affect JRA1, and SA1 and hence its implications needs to be clarified as early as possible. JRA4: Clarify if any software will produced and if so understand the relationship with JRA1 & JRA3. Note: currently this activity has n o milestone or deliverable before PM6 - this does not follow the recommendations of the project and EU who would like to see some output at PM3.