Template v7 January 30, 2013 1 Copyright © 2013. Infor. All Rights Reserved. www.infor.com 1 LN: v10.4 Service - Checking Material Availability in LN service.

Slides:



Advertisements
Similar presentations
Template v5 October 12, Copyright © Infor. All Rights Reserved. Copyright © Infor. All Rights Reserved.
Advertisements

PeopleSoft Enterprise SRM Purchasing: Overview, 9.0 Update, and Beyond 9.0 Alexandra (Haytcher) Dhillon, Earnest Ivie PeopleSoft Enterprise SRM Product.
Serialization, Item Attributes & Quality Control Hank Canitz – Sr. Director Industry Solutions, QAD Marketing QAD Midwest User Group.
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
 SAP AG 2003 Sales Process Contents: Sales - A/R.
Enterprise Systems Last Update Copyright Kenneth M. Chipps Ph.D
Warehouse Management in Microsoft Dynamics AX 2012 R3
CONSIGNMENT INVENTORY
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Using the Serialized Item Enhancements Rollout training.
Template v1 September 12, Copyright © Infor. All Rights Reserved. Infor LN: v10.3 – v10.4 Manufacturing Non-conformance Handling.
Template v5 October 12, 2012 Copright © Infor. All Rights Reserved. LN: HTML5-based Process Modeler Overview Hilde Schoonhoven, Business.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: v v10.4 Miscellaneous Project Enhancements.
Template v5 October 12, Copyright © Infor. All Rights Reserved. Baan-to-LN Differences Training “Multi-site and Common Data”
Template v5 October 12, Copyright © Infor. All Rights Reserved.
9 C H A P T E R Transaction Processing and Enterprise Resource Planning Systems.
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: Crediting and Rebilling Invoices Enhancements Rollout.
Day 3 Conference Details
QAD Solutions for Configurable Products Frank Feustel, Director, Product Management, QAD Inc. Jim Smith, QAD Improvement Leader, R. W. Beckett Corporation.
Experts in e xtending Oracle e -Business Suite e nrich IT 1/16/2004VMI1 Vendor Managed Inventory (VMI) Presenter: Arul Murugan, CPIM.
Material Requirement Planning (MRP)
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Managing the Integration Between Service and Quality.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Managing Material Demand for Preventive Maintenance.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Usability Enhancements in Service Overview Rollout.
Copyright CHS Payroll, Inc 2004 (Click anywhere to advance screen.) MyPayrollWeb.com Tour The ultimate online payroll experience from CHS Payroll.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Warehouse Mobility for LN An Overview Swaroop Patnaik, Infor.
Template v7 January 30, Copyright © Infor. All Rights Reserved.
Pass SOX security audits and Improve XA security CISTECH Security Solutions Belinda Daub, Senior Consultant Technical Services
©2004 Deloitte Drop Shipment and Back to Back Order Processes in Oracle 11i July 19, 2004.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Inventory Transactions.
Agenda Process Flow Design and Platform Configuration
Template v5 October 12, Copyright © Infor. All Rights Reserved.
Template v5 October 12, Copyright © Infor. All Rights Reserved. Baan-to-LN Differences Training “Sales, Purchasing & Pricing”
Infor LN 10.4 Invoicing - Advance Invoicing Enhancements
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Using the New Claim Features Rollout training Campus.
Project proposal for ITIL implementation Subtitle or presenter.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: v v10.4 Estimating Differences Rollout training.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.3 to v10.4 Moving Average Unit Cost (MAUC) Hours Differences.
Chapter 8 Transaction Processing, Electronic Commerce, and Enterprise Resource Planning Systems.
The Advanced Manufacturing System Advanced Dealer Training Version 3.0.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN v v10.4 Configurable Contract Deliverables.
Lesson 1: ICBS-R Application Overview. Copyright 2002 Sterling Commerce, Inc. All rights reserved. 2 Agenda WMS Concepts Modeling Participants Managing.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
Template v5 October 12, Copyright © Infor. All Rights Reserved.
Eric Wagner Mike Taylor Phil Joseph Copyright © 2009 Catavolt, Inc. All rights reserved.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
Operational Planning to Sales – Instructor Led Training Integrated Supply Chain Demonstration Danny Smith Solution Architect, AGSS.
Payroll/Personnel System Web-Based New Hire Presented by Payroll Services.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Warehouse Mobility for LN - Other Transactions Swaroop Patnaik,
Microsoft Dynamics ® NAV 2009 Service Management.
1 Splitting Available License Entitlements Audience: Authorized Business Partners and Avaya Module Scope: The process of how to split available (not yet.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Time Track Employee Record Configuration Development.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Subcontracting with Material Flow in Service Overview.
Supply Chain Platform – BAE Systems Weapon Systems Suppliers Live Training Presentation - Part 2: - Basic Functionality - Purchase Orders December 2013.
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Infor Factory Track TM 6.01 Composite Barcode Usage.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
The Features and Functions of WMS and TMS
Lesson 25: Task Management
Download Orders, Shipments, and Receipts
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Software Development In Agile
Speaker’s Name, SAP Month 00, 2017
OU BATTLECARD: E-Business Suite Courses and Certifications
Presentation transcript:

Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Service - Checking Material Availability in LN service LN 10.4 Rollout Training Campus Course Code: 02_ _EEN0526_ELN July 2014 Marco Hoogenraad, Business Analyst,

Template v7 January 30, Copyright © Infor. All Rights Reserved. Intended audience Pre-Sales Consulting Support Prerequisites to know LN Service Concepts ATP, Planned (projected) inventory, On Hand inventory

Template v7 January 30, Copyright © Infor. All Rights Reserved. Agenda LN Service – Material availability Why Business problem Business value What LN Solution Demo Summary

Template v7 January 30, Copyright © Infor. All Rights Reserved. Business Problem Without material availability, completion of the service activities is not possible When the moment of execution is close, the certainty of material availability needs to be high – often companies cannot check whether all parts are there for e.g. tomorrow When the material is NOT available, often no trigger to solve the problem by contacting the supplier, to see whether he can deliver earlier by shifting the service activity to the first date of material availability  Material not available causes problems  Service activities cannot be completed  extra costs, extra visits  Customer satisfaction low, since work not done in time or finished later  Customer satisfaction low, since the broken installation cannot be used  Partial material outbound  materials get lost  extra costs

Template v7 January 30, Copyright © Infor. All Rights Reserved. Business Value See upcoming material shortages early Make sure that supplier delivers on time Contact customer to postpone service job This results in  Higher customer satisfaction  Less “half executed” repairs - causing high costs  Outbound for all materials together, no parts lost at staging location

Template v7 January 30, Copyright © Infor. All Rights Reserved. The business requirement Support 2 planning models: Plan employees first (e.g. work bench), then check whether materials are available Find easily orders and activities with material shortage (to work on problem) Determine when material is available, then plan the employees to perform activity Shift the service job to the material availability moment

Template v7 January 30, Copyright © Infor. All Rights Reserved. LN Solution overview Support 2 planning models: Plan employees first (e.g. work bench), then check whether materials are available Find easily orders and activities with material shortage (to work on problem) Determine when material is available, then plan the employees to perform activity Shift the service job to the material availability moment 1 employees 2 material 1 material 2 employees

Template v7 January 30, Copyright © Infor. All Rights Reserved. Certainty of material availability Outbound activity / order complete ATP Projected On Hand Uncertainty in material availability

Template v7 January 30, Copyright © Infor. All Rights Reserved. Detection of shortage Orders consuming current On Hand On hand ServO 23 ServO 56 ServO 78 0 ServO 89

Template v7 January 30, Copyright © Infor. All Rights Reserved. Detection of shortage Orders consuming Planned available (includes receipts like purchase) On hand ServO 23 ServO 56 ServO ServO 89 Pur O 116

Template v7 January 30, Copyright © Infor. All Rights Reserved. LN Solution: how does it work Option to mark service-item as critical for inventory Various levels of materials availability can be checked: ATP (via Enterprise Planning) Planned available (projected inventory) Prioritized On-Hand Prioritized demand (for planned available and prioritized On Hand) Released more important than planned Origin Field Service, Depot, Prev. Maintenance Time Optionally, the Service Activities can be shifted to the first material availability moment Outbound – order complete or activity complete To make sure that all material are issued together for 1 activity or 1 order

Template v7 January 30, Copyright © Infor. All Rights Reserved. Solution: Options and navigation in LN Service Activities Check - ATP - Planned available - Prioritized OnHand Overview Material availability Per order For batch 12 3 Update the service activity planned start date* 4 * optional

Template v7 January 30, Copyright © Infor. All Rights Reserved. Service Activities Check - ATP - Planned available - Prioritized OnHand Overview Material availability Per order For batch 12 3 Update the service activity planned start date* 4

Template v7 January 30, Copyright © Infor. All Rights Reserved. Service Activities Check - ATP - Planned available - Prioritized OnHand Overview Material availability Per order For batch 12 3 Update the service activity planned start date* 4

Template v7 January 30, Copyright © Infor. All Rights Reserved. Service Activities Check - ATP - Planned available - Prioritized OnHand Overview Material availability Per order For batch 12 3 Update the service activity planned start date* 4

Template v7 January 30, Copyright © Infor. All Rights Reserved. Service Activities Check - ATP - Planned available - Prioritized OnHand Overview Material availability Per order For batch 12 3 Update the service activity planned start date* 4

Template v7 January 30, Copyright © Infor. All Rights Reserved. Demo For existing orders, the material availability is checked Sufficient material for the first activities, shortage for the last activities 1 (later) order is released This order has now higher priority An earlier “planned” service order shows shortage now Released order shows no inventory shortage

Template v7 January 30, Copyright © Infor. All Rights Reserved.

Template v7 January 30, Copyright © Infor. All Rights Reserved. Limitations / Out of scope The material lines must have a Planned Inventory Transaction, otherwise the material availability cannot be checked When the item is not configured in Enterprise Planning, the ATP cannot be checked from Service Other origins than LN Service (Service Orders, Work Orders, MSO part delivery etc) have a higher priority by default Customer owned inventory is excluded from the logic

Template v7 January 30, Copyright © Infor. All Rights Reserved. Summary Check the material availability Longer term : ATP Medium term: Planned Available (prioritized) Short term: Prioritized On-Hand (prioritized) Option to shift the activity to Material availability date Plan model: Plan employees first (e.g. work bench) and check whether materials are available Determine when material is available, then plan the employees to perform activity

Template v7 January 30, Copyright © Infor. All Rights Reserved.