John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Construction and Installation of the CLIC Experimental Area
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Agenda : CLIC Civil Engineering and Services (CES) WG.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Update on the Laser Beam Line
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Extraction and beamline progress B.Goddard TE/ABT.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Two-beam module layout
Demineralised water cooling system
CLIC Civil Engineering Update
IT-4189 Supply and installation of a cryogenic distribution system
CLIC module working group
CLIC Civil Engineering & Infrastructure
News from Integration WG
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
Interaction Region Alternative Layouts
5th FCC Infrastructure & Operation meeting
Budget specification EHN1 Extension: Infrastructure (WG2)
FCC-ee MDI Civil Engineering update
FCC Tunnel and Shaft Cross Sections
Detector hall in mountain regions
ILC DRAFT CONSTRUCTION SCHEDULE Flat topography & Mountainous sites
A very first look at siting issues
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
Workshop on fire protection for physics research facilities
Presentation transcript:

John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section Studies

John Osborne : GS-SEM Civil Engineering 19 May m tunnel used as baseline for 2007 costing exercise

John Osborne : GS-SEM Civil Engineering 19 May 2009 Tunnel Cross Section –Original 4.5m internal diameter tunnel was developed by C.Wyss study in 2007 : CLIC-Tech-Note August 2007

John Osborne : GS-SEM Civil Engineering 19 May 2009 The tunnel diameter were initially dimensioned for the following items : –The CLIC machine, with their drive and main beam machine components. – The 2.4 GeV and 9 GeV transfer lines for the drive and main beams, respectively –An Installation corridor for the transportation of machine modules for installing and/or replacement.

John Osborne : GS-SEM Civil Engineering 19 May 2009 Machine Services (1) : –Supply and return manifolds for demineralised water cooling. –Raw water supply and return. –Drainage pipe embedded in concrete invert for any water seepage –Compressed air for PETS on/off mechanism –Nitrogen distribution, if any –One or two 40mm duct(s) for optical fibre links –Two or three 500mm wide cable trays for dc power cables.

John Osborne : GS-SEM Civil Engineering 19 May 2009 Machine Services (2) : –A free section of at least 70cm width by 200cm for personnel passage between a module and the tunnel wall. –One 500mm wide cable tray for low power and signal cables for the RF system –One 500mm wide cable tray for beam instrumentation, survey and vacuum systems –One 300mm wide cable tray for the power cables of the transfer lines

John Osborne : GS-SEM Civil Engineering 19 May 2009 Machine Services (3) : –One 200mm wide cable tray for the cables of the vacuum and beam instrumention systems of the transfer lines –The Low-Voltage (400V) distribution –5 Cables for Medium Voltage (36KV). These cables will bring power from Prevessin Site central Area to other sites –Secure Low Voltage Electricity –Power for the transport vehicles –No mono-rail type transport included for the moment

John Osborne : GS-SEM Civil Engineering 19 May 2009 Tunnel Services : –Normal Lighting –Leaky feeder for mobile telephones –Public address system

John Osborne : GS-SEM Civil Engineering 19 May 2009 Safety Systems : –Panels with emergency lighting, emergency stops, red telephones –Evacuation push-buttons (break glass type) and sirens –Emergency radio communication for fire brigade –Radiation monitors –Oxygen deficiency monitors?

John Osborne : GS-SEM Civil Engineering 19 May 2009 Alignment and Tunnel tolerances –Space has been recently allocated for alignment systems –A radial allowance for construction tolerances has been included (10cm)

John Osborne : GS-SEM Civil Engineering 19 May 2009 Drive beam from Turnarounds missing from this cross section !

John Osborne : GS-SEM Civil Engineering 19 May 2009 What has changed since 2007 : –3d studies with CATIA integrating services –Cooling and Ventilation studies –Transport studies –Machine developments….

John Osborne : GS-SEM Civil Engineering 19 May 2009 Five machine beams in this cross section Catia Studies

John Osborne : GS-SEM Civil Engineering 19 May 2009 Extract from CLIC Technical Committee : G. Riddone, D. Schulte,

John Osborne : GS-SEM Civil Engineering 19 May 2009 Drive beam To dump

John Osborne : GS-SEM Civil Engineering 19 May 2009 Main beam Beginning Of turnaround loop End of turnaround loop

John Osborne : GS-SEM Civil Engineering 19 May 2009 Transport Studies

John Osborne : GS-SEM Civil Engineering 19 May cable trays 520mm 2 CV pipes 600mm 2 CV pipes 250mm Drive beam Main beam Safe passage Transport train Turnaround loop RIGHT VIEW TYPICAL CROSS SECTION CLIC TUNNEL Monorail Turnaround & transport Studies 4.5m tunnel

John Osborne : GS-SEM Civil Engineering 19 May 2009 Possible Ventilation Systems for road tunnels Extracted courtesy of ‘French Tunnelling Association : AFTES : Tunnels routiers : resistance au feu Jan 2008’

John Osborne : GS-SEM Civil Engineering 19 May 2009 CLIC Ventilation Concepts Advantages of transversal ventilation : Safety (see CLIC note from F.Corsanego EDMS ) Much better control of temperature & humidity gradient along the tunnel

John Osborne : GS-SEM Civil Engineering 19 May m diameter needed to accommodate 3m2 ducts !

John Osborne : GS-SEM Civil Engineering 19 May cable trays 520mm CV pipes 250 & 700mm Circuit B Drive beam Main beam Safe passage Transport train RIGHT VIEW TYPICAL CROSS SECTION CLIC TUNNEL – CV 2x1m2 Monorail CV pipes 600 & 700mm Circuit A Extraction 1m2 Air supply 1m2

John Osborne : GS-SEM Civil Engineering 19 May 2009 COOLING AND VENTILATION IN THE TUNNEL J. Inigo-Golfin - C. Martel CERN TS/CV Wednesday 15 th October 2008 CLIC WORKSHOP

John Osborne : GS-SEM Civil Engineering 19 May 2009 Tunnel section Circuit D : compressed air Circuit C : Fire Fighting Circuit A : Module cooling Circuit B : general cooling EXTRACTION DUCT SUPPLY DUCT CLIC WORKSHOP - Ventilation

John Osborne : GS-SEM Civil Engineering 19 May 2009 Safety considerations SHAFT POINT Extraction Air supply Extraction Air supply Control of the pressure from both ends of a sector. Control of the pressure (overpressure or underpressure in each area). Fire detection per sector compatible to fire fighting via water mist. CLIC WORKSHOP - Ventilation

John Osborne : GS-SEM Civil Engineering 19 May 2009 CLIC Cooling Study Proposed 1.5m diameter micro-tunnel for Cooling Pipes : Approx. cost for CE works 250MCHF Intermediate caverns would be needed for construction of micro tunnel Integration for cooling pipes is complicated Major impact on civil planning (excavated spoil through ‘completed’ structures) J.Osborne

John Osborne : GS-SEM Civil Engineering 19 May m tunnel Drive beam from Turnarounds missing from this cross section !

John Osborne : GS-SEM Civil Engineering 19 May m tunnel Drive beam from Turnarounds missing from this cross section !

John Osborne : GS-SEM Civil Engineering 19 May 2009 Herrenknect Visit June 2008 Herrenknect are one of the worlds biggest TBM manufacturers. They advised that the most common diameter for TBM’s (metro etc) is 5.6 finished internal diameter.

John Osborne : GS-SEM Civil Engineering 19 May m compared to 6.0m diameter Cross Section Studies

John Osborne : GS-SEM Civil Engineering 19 May 2009

John Osborne : GS-SEM Civil Engineering 19 May m tunnel

John Osborne : GS-SEM Civil Engineering 19 May 2009 Summary With a 4.5m diameter tunnel, it appears difficult to accommodate all equipment 5.6m recommended by CES working group More TBM’s of this diameter available will help with Project planning Reduction in other costs due to more additional working space ? Space for future requests…. Additional CE cost in the region of 150M CHF Barcelona Metro under construction 6.6m machine external, inner 5.8m. With 0.1m tolerance on radius = 5.6m internal diameter.