Session#64-Closing_Plenary_Notes.ppt Subir Das, Chair WG Subir Das sdas at appcomsci dot com IEEE Session #64, Athens, Greece WG Closing Plenary
Session#64-Closing_Plenary_Notes.ppt Meeting Updates Task Groups Update Liaison Reports Teleconferences Future Locations Subir Das, Chair, IEEE Slide 2
Session#64-Closing_Plenary_Notes.ppt TG Reports d Multicast Management Task Group – september-closing-note.ppthttps://mentor.ieee.org/802.21/dcn/14/ MuGM-tgd- september-closing-note.ppt m: Revision Task Group – closing-report.pptxhttps://mentor.ieee.org/802.21/dcn/14/ REVP m-session-64- closing-report.pptx : Media Independent Services and use cases Task Group – Subir Das, Chair, IEEE Slide 3
Session#64-Closing_Plenary_Notes.ppt Teleconferences d Teleconferences: – Oct 3 (Fri), 10am-noon, Eastern Time (Tentative) –Oct 7 (Tue), 8am-10am, Eastern Time (Tentative) –Oct 10 (Fri), 10am-noon, Eastern Time (Tentative) m Teleconference: – Oct 16 (Thurs), pm, EST (Tentative) Teleconference: –Oct 02, 2014, 6 pm EST (tentative) – Oct 23, 2014, 6 pm EST (tentative) Subir Das, Chair, IEEE Slide 4
Session#64-Closing_Plenary_Notes.ppt WG Motion 5
Session#64-Closing_Plenary_Notes.ppt WG Motion Move to authorize the P802.21d Sponsor Ballot Resolution Committee (SBRC) to resolve Sponsor Ballot comments and approve the related contributions via teleconferences Moved by: Yoshihiro Ohba Seconded by: Chrales E. Perkins For: 05 Against: 00 Abstain: 00 Motion passes 6
Session#64-Closing_Plenary_Notes.ppt WG Motion Move to authorize the P802.21d Editor to accept the resolution passed by the SBRC during teleconferences and produce P802.21d/D06 Moved by: Yoshihiro Ohba Seconded by: Charles E. Perkins Yes: 05 No: 00 Abstain: 00 Motion Passes 7
Session#64-Closing_Plenary_Notes.ppt WG Motion Move to authorize the P WG Chair to initiate a Sponsor Ballot re-circulation ballot for P802.21d/D06. Moved by: Yoshihiro Ohba Seconded by: Charles E. Perkins Yes: 05 No: 00 Abstain: 00 Result: passes 8
Session#64-Closing_Plenary_Notes.ppt Future Sessions Subir Das, Chair, IEEE Slide 9
Session#64-Closing_Plenary_Notes.ppt Future Sessions – 2014 Plenary: 2-7 Nov 2014, Grand Hyatt, San Antonio, TX, USA –Co-located with all 802 groups Subir Das, Chair WGSept 2014
Session#64-Closing_Plenary_Notes.ppt November Meeting Logistics November 2-7, 2014 at the Grand Hyatt in San Antonio, TX USA Early Registration Deadline is 6PM Pacific Time on Friday September 5th. Cancellation Full Refund Deadline is 6PM Pacific Time on Friday September 5th. Hotel Group Rate Deadline* is 6PM Central Time on Saturday October 18th. *Guest Room Rate is Subject to Availability, if the IEEE 802 Room Block is sold out on or before the deadline date the preferred rate may no longer be available. Event Information Site: Registration: Visa Letter: Cancellation: Group Hotel Reservations: Subir Das, Chair WGSept 2014
Session#64-Closing_Plenary_Notes.ppt Future Sessions – 2015 Interim: January, 2015, Hyatt Regency, Atlanta, GA, USA –Co-located with all 802 groups Plenary: 8-13 March, 2015, Estrel Convention Center and Hotel, Berlin, –Co-located with all 802 groups Interim: May 10-15, 2015, Hyatt Regency Vancouver –Co-located with all wireless groups Plenary: July 2015, Hilton Waikoloa Village, Hawaii, USA –Co-located with all 802 groups Interim: September 2015, Asia (Bangkok or Kuala lumpur) –Co-located with all 802 wireless groups Plenary: 8-13 Nov 2015, Hyatt Regency Dallas, TX, USA –Co-located with all 802 groups Subir Das, Chair WGSept 2014