CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct. 19991 ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
Torch electronics test environment MCP readout update.
1 March 2001 CMS HCAL RBX Production Readiness Review1 H C A L RBX SAFETY ISSUES RBX Production Readiness Review Safety Issues and Mitigations John E.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Status of NA62 straw electronics Webs Covers Services Readout.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
EE EDR Workshop CERN March 2002 R M Brown - RAL 1 The VPT HV System lOverview of the architecture lThe HV filter card lRadiation tolerance lPower supply.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
ATLAS Internal ID Service Integration
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
Services Layout – Update
UK CMS Oversight Committee Mtg
Status of the EUDET Prototype
SALTRO16 activities in Lund
Presentation transcript:

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and Fibre Optic Monitoring for the ECAL End Cap ECAL WEEK End Cap meeting held 18 October to 22 October at CERN Prepared by A.B.Lodge.

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Status Report Structure High Voltage PCB Design and Manufacture. EE Fibre Optic Monitoring System. Thermal Gasket Materials. Future Work Plan.

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of High Voltage PCBs To connect the the Super Crystal Modules with the Readout Electronics requires the design and manufacture of 3 different PCBs, these are as follows: The 5 channel High Voltage Filter Boards (5 boards per SCM). –These boards contain most of the HV Filter and De-coupling components. The High Voltage Termination Card. –This card is used to terminate and connect both the Anode and Dynode supply cables to the other 5 channel Filter cards. The low voltage Signal Termination Card. –Used to terminate the 25 signal co-axial cables from each SCM into a 50 way D-Type connector (these then connect with the 50 Channel Readout Modules).

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of High Voltage PCBs The design of the three different cards has now been completed and passed to a PCB design company for final artwork layout. Full Engineering Drawings have been produced. Quotes have been received and orders placed for the manufacture of enough cards for the construction of 2 Super Crystal Modules. Further design work is being carried out at RAL to try and optimise the design and produce the most cost effective final design solution for the EE.

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of Fibre Optic Monitoring System for the EE. Size of the MEM Module. The MEM module design proposed by SACLAY appears to be large (304*255*68) when we consider the amount of free space available to the EE after fitting the Readout Electronics, High and Low Voltage Services, Digital Readout Fibre Optics, Cooling Systems, Moderator and the rest of the Fibre Optic Monitoring System.We therefore need to understand the following: Why is the MEM module this size? The MEM module is a 12 channel unit and appears to be constructed of two identical 6 channel cards. If this is correct would it be possible to: Re-design the MEM module into 2 separate 6 channel MEM units? Or mount the MEM module remote from the EE? –If possible what would be the maximum distance?

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of Fibre Optic Monitoring System for the EE. MEM Module Cooling and Mounting. The TDR quotes a figure of 35 Watts power dissipation for each MEM module (2 per Dee); this is small when we consider that each 50 Channel Readout Module is quoted at 55 Watts (80 per Dee): Would it therefore be feasible to cool the MEM module with the same cooling system as either the Readout Electronics or the Back Plate cooling system? The MEM module appears to be designed to be mounted on the patch panels. Again due to the size of the MEM modules and the lack of free space on the End Cap patch panels, this would not be practical on the EE Is this really necessary for the End Caps?

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of Fibre Optic Monitoring System for the EE. Monitoring Fibre Layout and Routing. The Monitoring system layout and routing appear to be very difficult if not impossible if the following points are correct: All fibres from the same fibre harness (Level 1 & Level 2) have to be approximately the same length? All fibres from the same fibre harness (Level 1 & Level 2) should be exposed to the same levels of Radiation? Have Radiation Tests been been carried out on the proposed EE fibres? It would appear that each quadrant will have 2 triggers and therefore each 1/2 quadrant will be triggered separately How should these be grouped? If as shown, we may need to identify every fibre? A B

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of Fibre Optic Monitoring System for the EE. Monitoring Fibre Connections. It has been proposed by SACLAY that the EE will use a fusion splice method of joining the Level 1 fibre optics to the Super Crystal Modules: How long will it take to make a single fibre splice? Will each splice require a splice protector and at what cost? Are there mechanical splices available and at what cost? Do we know the cost for inline connectors? How much spare fibre will be required to re-make connections in the event of failure during construction? In the event of failure would all fibres of the same harness have to be remade so as to keep their lengths the same? What levels of testing will be required during the manufacture of SCM and the integration of each DEE and how will this be achieved? How will we identify individual fibres in the event of splice failure?

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of Fibre Optic Monitoring System for the EE. Monitoring Fibre Protection. During the construction of each Dee and considering the fact that we may require quite complicated routing patterns for the monitoring fibre layout, in addition, Super Crystal Modules will probably need to be mounted onto the back plate in its vertical position, starting from the top down: How will we protect the monitoring fibres during construction of the EE Dees? The idea of using polythene moderator beads in-cased in some kind of mechanical structure might be a little impractical for the End Caps.? Dual PN Diode Units. How many Monitoring Fibres are read back through each unit ( 2 or 4)? What is the power rating of each unit? Does each unit require any special cooling?

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of Fibre Optic Monitoring System for the EE. Spare Monitoring Fibre. With the Fibre Optic Monitoring System proposed, should we not provide spare fibres from the Laser switching module to the End Cap patch panels (Level 2 Fibre Harnesses)? Will we require connectors on the EE patch panels for these fibres and if so, do we have the mechanical details for them? Spare Level 1 & Level 2 Fibres. After construction of the End Cap Dees with the proposed system, the Level 1 and Level 2 fibres will be virtually inaccessible. Is it therefore accepted that these fibres will only be used during assembly to rectify any faults? Do we need try and layout the End Cap fibres to allow access after the initial construction?

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Review of Fibre Optic Monitoring System for the EE. Super Crystal Fibre Location. SACLAY have proposed to use a well engineered Level 1 Ferule Clip to locate the Level 1 fibre ferules with respect to the face of each crystal, this would seem to be a very good idea. Shouldn’t the End Cap also consider a similar idea? What would be the maximum distance allowable between the crystal end of the Level 1 fibres and its associated crystal face?

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Thermal Gasket Materials. One of the younger engineers at RAL ( Roger Barlow) has conducted some simple thermal tests on our Readout Module Prototype. These tests have shown that without proper thermal management the 50 Channel Readout Modules can reach a temperature in excess of 85°C. He has also placed samples of a selection of commercially available Thermal Gaskets into the ISIS Neutron Source and subjected them to 10^14n/cm^2. There appeared to be no visible change in the mechanical properties of these materials, but more detailed tests are needed to check for effects on their Thermal Conductivity.

CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Future Work Plan. Continue with the designs of the HV PCB’s ( using conventional, as opposed to surface mount components to try and reduce the final cost). Use the new prototype High Voltage PCBs with this year’s Test Beam Super Crystal Module to evaluate the proposed designs. Set-up a meeting with the SACLAY design team and continue with Fibre Optic Monitoring System design proposals for the EE. Continue with a more detailed testing programme on Thermal Gasket materials.