PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.

Slides:



Advertisements
Similar presentations
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
Advertisements

1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
Computer Integrated Manufacturing CIM
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
POWER PLANT.
1 Out of Site, Out of Mind! Mark Mallen Group Health and Safety Manager.
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
NUCLEAR SAFETY Barbora Svobodová Angličtina-odborná II.
MODULE “STRATEGY DEVELOPMENT”
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
Transport support in foreign economic activity
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 DISMANTLING TECHNIQUES STATE OF THE ART ON DEVELOPMENT OF TECHNOLOGIES FOR DISMANTLING OF NUCLEAR INSTALLATIONS IN RUSSIA.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
MODULE “PROJECT MANAGEMENT AND CONTROL” QUALITY ASSURANCE SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Source Control Project, Phase I Chemical hazards Objectives  Development of the of risk assessment methodology based on the use of approaches of ISO
Source Control Phases I-II: Source Control Phases I-II: Main findings  Facility: drinking water and sewage treatment utility in Apatity, Murmansk region,
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
El Cabril near surface disposal facility
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
TRANSPORTATION OF USED FUEL December 2015 Pierre OneidJack Edlow Holtec InternationalEdlow International Company.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
ICARUS Collaboration Meeting Dec A. Scaramelli.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
About company Kurgankhimmash is the leading Russian company manufacturing process equipment for oil & gas producing, oil & gas refining, chemical, energy,
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
State Enterprise Radioactive Waste Presented by: Momchil Kazakov – Chief Technologist SD “Decommissioning 1-4 unit”, SERAW 15–17 June 2016 Golden Sands.
Progress Meeting 20 Nov 2012, Karlsruhe LEADER 1LEADER1 WP1 REFERENCE DESIGN OBJETIVES AND SPECIFICATION (SCK-CEN)
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Kazan Helicopters PJSC
Constraints Space Load Capacity Costs Operating hours.
2013 ISOE International ALARA Symposium
John Christian President, Logistics, Processing and Disposal
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Updated Design of Detector Hall
Radiation Safety Management
Computer Integrated Manufacturing CIM
The report on the IBR-2 modernization
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
IT-4328: Technical Specification
IEEE SC-2 International Standard Review
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Possible Transition from Operating to Decommissioning
NRC Event Number – Event Date
TIMELINE FOR IIIB LOCOMOTIVE DEVELOPMENT
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 2  BRENNILIS REACTOR BRENNILIS REACTOR  DECOMMISSIONING DECOMMISSIONING  SCOPE OF WORK SCOPE OF WORK  MAIN REQUIREMENTS MAIN REQUIREMENTS  MAIN DESIGN PROBLEMS MAIN DESIGN PROBLEMS  DESIGN SOLUTIONS DESIGN SOLUTIONS

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 3  Brennilis reactor is an experimental reactor moderated with heavy water and cooled with carbon dioxide (HWGCR). The reactor was to have a power of 70 MW.  The startup occurred in  In 1985 the reactor was decommissioned.

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 4 Brennilis marks the first dismantling of a complete nuclear power station in France. EDF and CEA announced intention to make a transparent process so that it can be used as a model for dismantling of other plants later. The process is divided into 3 phases: Phase 1 This phase was launched in 1985, similar to a refueling outage the fuel is moved to the spent fuel pool, but new fuel is not loaded, and the fuel on site is evacuated. Phase 2 Phase 2 started in 1997, consisting of: decontamination and disassembling of the buildings except for the reactor itself. evacuation of the nuclear waste. In 2005 phase 2 officially finished. Phase 3 Phase 3 which is currently underway, consist of: dismantling of the heat exchangers. dismantling of the Reactor pressure vessel (RPV) – ONET TECHNOLOGIES leader of consortium ONET TECHNOLOGIES/NUKEM TECHNOLOGIES. demolition of the containment (Reactor building).

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 5 The equipment is designed for operation in a chamber for treatment of radioactive waste (CDI) and will be installed in place in the Brennilis nuclear power plant in France. The equipment will perform specific operations and is designed to comply with the requirements of individual technical specifications prepared by consortium GМЕ (ONET TECHNOLOGIES/NUKEM TECHNOLOGIES).

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 6 The scope of work assigned to PMC by ONET TECHNOLOGIES is the executive studies, manufacturing, factory acceptance tests and delivery on site for following equipment: Elevator; “Renard” trolley; 5m 3 trolley; Characterization trolley; Hoisting devices and rack; Sorting table.

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 7 The main designing requirements are the following: Several types of packages (weight and dimensions); Interface with civil construction; Low speed for all movements; Operations in remote control; Maintenance of equipment; Life time of equipments; Operation in radioactive environment; High accuracy of positioning; Equipment to be designed in accordance with Machinery directive 2006/42 and FEM

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 8 Lack of sufficient input data for the civil construction – considering the specific conditions due to the place of operation and considering the specific technological processes due to the functions of the whole system for treatment of radioactive waste it is necessary to modify and change the use of some areas of the reactor building. Difficulties with limited space – the tight equipment overall dimensions are predetermined by the limited space assumed for operation execution and incorporation of the systems in the design.

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 9 High dose rate – operation in environment with high ionizing radiation, protection of the equipment, endurance to frequent decontamination treatment, structure designed form units which are convenient for maintenance.

PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 DESIGN SOLUTIONS DEVELOPMENT OF THE DESIGN CONCEPTS IN COMPARISON TO THE ONET TECHNOLOGIES TECHNICAL SPECIFICATIONS

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 11 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 12 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES Main technical characteristics Load carrying capacity 10 t Speed of movement 2 m/min Overall dimensions 2190 x 1600 x mm Platform dimensions 1450 x 1450 mm Platform height from the floor 860 mm Elevator is designed to carry three types of containers between four levels in the rector building.

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 13 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 14 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 15 “Renard” trolley performs transportation of three types of containers. The loading/unloading operations are performed by the trolley itself and are controlled from control room. Basic trolley “Renard” Load carrying capacity 10 t Nominal lifting capacity 5,5 t Lifting height 2250 mm Lifting speed 1 m/min Maximum traveling speed 4,47 m/min Rail span 1,2 m Trolley traveling distance 28,7 m Overall dimensions 3091 х 1430 х 2188 mm Small trolley “Renard” Load carrying capacity 10 t Lifting height 150 mm Lifting speed 0,13 m/min Traveling speed 3,76 m/min Trolley traveling distance 8 m Overall dimensions 1300 х 1340 х 365,5 mm Main technical characteristics

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 16 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 17 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES Main technical characteristics Load carrying capacity 23 t Lifting height 103 mm Lifting speed 0,12 m/min Traveling speed 5 m/min Rail span 1,4 m Trolley traveling distance 22 m Overall dimensions 2555 x 1800 x 1291 mm The 5m 3 trolley is designed for operation with two types of containers: container 5m 3 and container R73.

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 18 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 19 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES The Characterization trolley is designed for operation with seven types of containers. Main technical characteristics Load carrying capacity 3 t Platform rotation speed 5 rpm Traveling speed 5 m/min Rail span 1,5 m Trolley traveling distance 4,7 m Overall dimensions 2151 x 1694 x 1524,5 mm

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 20 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES Five hoisting devices are designed. Each hoisting device is designed for operation with a specific type of basket. The weight of the heaviest basket is 3 t.

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 21 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES The rack is designed for storage of these 5 hoisting devices and protection lid for auxiliary coupling mechanism intended for their attaching to the crane. ONET TECHNOLOGIES DESIGN

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 22 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 23 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES Main technical characteristics Load carrying capacity 1,6 t Dynamic loading of the grid 1 t Overall dimensions 1200 x 2270 x 600 mm The Sorting table is designed for containing the waste unloaded from the baskets OT and NUKEM.

International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 24  The main control mode of the whole equipment during the process of nuclear reactor dismantling is intended to be from control room via Ethernet communication.  The reliable and synchronized operation of the devices is realized by utilization of contemporary technologies and concepts.  The equipment is also able to operate in maintenance mode and emergency mode during which the control is accomplished by local control panels.

PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 THANK YOU FOR YOUR ATTENTION !