GEM chambers for SoLID Nilanga Liyanage University of Virginia.

Slides:



Advertisements
Similar presentations
Study of Large-area GEM Detectors for a Forward Tracker at a Future Electron-Ion Collider Experiment Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida.
Advertisements

GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Status of the ATLAS MM project
D. Peterson, Cornell University, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG Arlington 09-Jan-2003 Tracking Detector R&D.
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
GEM chambers for SoLID Nilanga Liyanage University of Virginia
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
GEM/MRPC/Chinese Collaboration Haiyan Gao Duke University March 25, 2011.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
MM detector construction One or several modules per sector considerations.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
ATLAS micromegas activities (MAMMA)
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
Estimates of GEM chamber costs for the Solenoid spectrometer.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
GEM Detector R&D at Florida Tech – “Get to know each other” –
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Electronics for GEM R&D at the University of Virginia
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Atlas: Upgrade Phase I Massimo Della Pietra.
EIC Tracking Meeting, March 26, 2012
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
TDIS mTPC update Nilanga Liyanage and Kondo Gnanvo UVa
Presentation transcript:

GEM chambers for SoLID Nilanga Liyanage University of Virginia

Current proposal to instrument locations 4, 5, 6, 7, and 8 with GEM: need to determine the number of GEM layers required and their locations, using the simulation 30 GEM modules at each location: each module with a 10-degree angular width. PVDIS GEM configuration PlaneZ (cm)R I (cm) R O (cm) Active area (m 2 ) total:~ 25 Outline of a GEM module

Suggested readout scheme: a 2D readout optimized to get high accuracy in the  coordinate, lower but sufficient resolution in the r coordinate. each set of stripes parallel to one of the radial sides of the module: i.e. stripes at a 10-deg stereo angle to each other. strip pitch is 0.6 mm for locations 7 and 8; 0.4 mm for locations 4, 5 and 6. Issues: A full tracking simulation needs to determine that this readout scheme gives the required tracking resolution. How well will the 10-deg stereo angle separated strip layers work ? – need to test with prototypes. PVDIS GEM configuration

For this readout scheme readout channel estimation PVDIS GEM configuration with 20% spares, we will need about 200 k channels. Simulations and prototypes may indicate that we need more channels for high rate tracking; can be as much as 300 k total. Good news: cost of electronics going down – cost per channel for the RD51 SRS APV-25 based readout is estimated to be ~ $ $ 3.00 The total cost of readout electronics can be less than $ 1 M PlaneZ (cm)R I (cm) R O (cm) # of channels k k k k k total:164 k

Six locations instrumented with GEM: PVDIS GEM modules can be re-arranged to make all chamber layers for SIDIS. – move the PVDIS modules closer to the axis so that they are next to each other More than enough electronic channels from PVDIS setup. The two configurations will work well with no need for new GEM or electronics fabrication. SIDIS GEM configuration PlaneZ (cm)R I (cm) R O (cm) Active area # of channels k k k k k k total: ~18~ 161 k PVDIS SIDIS

large area GEM chamber challenges SoLID needs GEM modules as large at 100 cm x 40 cm. The biggest challenge used to be the non-availability of large area GEM foils. Not a problem anymore: CERN shop can make foils as large as 200 cm x 50 cm now. One problem may be the production capacity of the CERN shop: especially if a LHC related large GEM project gets underway. Need to develop large GEM production capabilities in China.

Recently, a very large prototype GEM module for CMS was constructed and tested at CERN 99 cm x (22 – 45.5) cm – very close the the dimensions of largest SoLID chambers

Bottom-line With the strong effort led by RD-51 towards large GEM chambers and readout electronics: Costs are coming down Many technical challenges are overcome But SoLID is a very large and very complicated GEM project from any standard; no one has ever done anything even close to this size. We are soon starting on SBS GEM construction, this is about half the size of the SoLID GEM project. So with large GEM chamber construction for SBS in Rome and at Uva and with the infrastructure and expertise we gain from the SBS project we would be ready for the SoLID GEM construction in a couple of years.

9 UVa GEM development status Beam test at Mainz in September with 10 cm x 10 cm prototype chambers and APV-25 electronics. Construct two 40 cm x 50 cm prototype chambers this Fall GEM and readout foils already ordered Expect chamber construction in October Move to Jlab and beam testing with APV-25 electronics: November-May The 40 cm x 50 cm prototypes Size: 40x50 cm 2 active area + 8 mm frame width 2D strip readout (a la COMPASS) mm pitch INFN is now going into 40x50 cm 2 GEM module production for SBS The INFN 40 cm x 50 cm prototype: the Uva chambers will be similar with small modifications

10 UVa GEM development status At present preparing lab for large prototype production Refurbish the clean room with new filters etc. Dry Nitrogen high voltage boxes for GEM foil testing Dry Nitrogen storage cabinets for foil storage (to minimize oxidization effects) mechanical stretcher for GEM foils. Etc. etc. Dry Nitrogen cabinets for foil storage mechanical stretcher for GEM foils

11 UVa GEM development status Funding received under EIC detector R&D for a large prototype: ~ 100 cm x 40 cm section of a circle. Close to large chamber module sizes of SoLID Plan to fabricate this chamber in the spring. Can learn a great deal for SoLID GEMs from this develop techniques for fabrication of large GEM modules. study readout schemes: 10 degree stereo angle Study issues of signal to noise ratio for long readout strips.

12 Uva group now owns an APV25 system (2000 chan.) from the RD-51 Scalable Readout System (SRS) development. SRS system cost is lower; plus has the benefit of the large team effort backed by RD-51 RD-51 plans to commercialize the fabrication; there will be the possibility to get very large systems in the future.

13 Electronics Uva is also getting another APV-25 based prototype readout system (2800 chan.) from the INFN group Some delays due to problems at the company fabricating the boards; hope to get soon Up to 10m twisted, shielded copper cable 2D Readout 75 mm 49.5 mm 8 mm

rough cost estimate ItemQuantityUnit costTotal cost Material only unit cost Material only total cost GEM foil~100 m 2 $2000/m M$3000/m M readout boards120$ M$ M chamber support frame120$ M$ M Supplies and tooling0.1 M FEE and DAQ200 k$ M$ M cables, power, etc0.5 M Gas system0.1 M Labor: Technicians12 FTE-years$ 80 k1.0 M- Labor: Grad students 6 student- years $ 50 k0.3 M- support structure and integration ??? TOTAL:~ 3.3 M~ 2.0 M With 33% contingency ~4.4 M~2.7 M R&D and prototyping expenses: ~ $ 150 k