U.S. Domestic Reactor Conversion Program Fuel Inspections and Quality Control David F. Capp Research Reactor Fuels Inspector/Engineer 2007 RRFM Conference.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
National Bridge Inspection Standards (NBIS)
ASME Nuclear Conformity Assessment
AFISS Prospectus of Services AFISS offers HACCP food safety and food quality systems development and management services including preparation for regulatory.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Introduction To Ultrasonic Testing (UT)
FAA Workshop on Key Characteristics for Advanced Material Control
Comments to Manufacturing QA documentation
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Weld Inspection Basics
Supplementary Training Modules on Good Manufacturing Practice
Aviation Maintenance Management
ISO 9000 Certification ISO 9001 and ISO
First Article Inspection 9102 Carl ZimmermanSept,2013.
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
1 TAIEX PED workshop - IM TAIEX Workshop on the implementation of the Pressure Equipment Directive (PED) Bucharest, 27 February - 1 March 2007 Non-Destructive.
From Research Prototype to Production
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
THERMAL HYDRAULIC ANALYSIS FOR THE OREGON STATE REACTOR USING RELAP5-3D Wade R. Marcum Brian G. Woods 2007 TRTR Conference September 19, 2007.
Babcock & Wilcox Cost & Yield Review NAS
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
MAGNA M a g n a D i g i t e c h I n d i a P r i v a t e L i m i t e d STEEL FABRICATTION TO DUCTILE IRON CASTING CONVERSION PROJECT NAME: CHARGE AIR PIPE.
National Spent Nuclear Fuel Strategy Meeting April 15, 2009 Dawn Gillas Federal Program Manager Nuclear Material Programs Division DOE-SR SRS Spent Nuclear.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
VI. Developing a VSMP Program General Stormwater Training Workshop.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Module 19 | Slide 1 of 14 January 2006 GMP Inspection Process Types of GMP Inspection.
September TRTR Conference U.S. Domestic Reactor Conversion Programs Eric Woolstenhulme Dana Meyer.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
Phased Array Training & Certification
New Reactor Construction Inspection
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Expectations for Facilities & cGMPs Biological Response Modifiers Advisory Committee Meeting October 9, 2003 Nicholas Obiri, Ph.D. CBER.
0 Safety Infrastructure Development for Introduction of Nuclear Power S.K. Sharma Chairman, Atomic Energy Regulatory Board, India IAEA Workshop on Evaluation.
A QUALITY IMPROVEMENT TOOL
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
PSR at Training Reactor VR-1 Marek Sedlbauer Czech Technical University in Prague IAEA Workshop on Application of the Code.
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
Concrete Weight Coating Plant “Aladja”
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
Office of Aviation Safety Chalk’s Ocean Airways Maintenance Program Pocholo Cruz Maintenance Group Chairman.
ERT 421 Good Manufacturing Practice for Bioprocess Engineering Test 1: answer scheme.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
INGAA Quality Management Systems White Paper Supporting Pipeline Construction.
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
CLEAN UP & INSPECTION.
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Nondestructive Testing
THERMAL HYDRAULIC ANALYSIS FOR THE OREGON STATE REACTOR USING RELAP5-3D Wade R. Marcum Brian G. Woods 2007 TRTR Conference September 19, 2007.
Inspection and Testing
STATION FACILITIES INSPECTION
Chemical Purchasing.
First Article Inspection
Multiphysics Simulation Story: Researching a New Fuel for the HFIR: Advancements at ORNL Require Multiphysics Simulation to Support Safety and Reliability.
Civil/Structural Engineering
Aerodrome Certification Workshop
Fiber Reinforced Polymer Systems
Presentation transcript:

U.S. Domestic Reactor Conversion Program Fuel Inspections and Quality Control David F. Capp Research Reactor Fuels Inspector/Engineer 2007 RRFM Conference September 2007

The RERTR U.S. Domestic Conversion Program continues in its support of the Global Threat Reduction Initiative (GTRI) to convert seven U.S. Test Research and Training Reactors to low enriched uranium (LEU) by An important part of conversion process is the procurement of the fuel and other reactor components by the INL. The presentation will be a general overview of the Quality Assurance/Inspection processes used to procure components for the reactors with some specifics on the inspection processes used for plate type fuel elements and TRIGA elements.

Qualification and Training Personnel Qualification –NDT personnel in accordance with SNT-TC-1A –Other Inspectors / Operators in accordance with Customer approved procedures. Training –Documented On-Job-Training –Comprehensive Training Checklists –Division-Wide Training (i.e., Safety, Regulatory, etc)

Establishing Requirements 10 CRF Quality Assurance Program. Component Specifications based on University Specifications and Safety Analysis

Quality Assurance Program Based on ASME Nuclear Quality Assurance (NQA-1)

Receipt Inspection of Raw Material

Weighing of Fuel Charge

Fluoroscope Inspection

Plate Inspection/Visual, Dim.

Void Volume

X-Ray of Plate Type Fuel

Radiographic Evaluation

Dimensioning of Fuel Core

Homogeneity Evaluation

Ultrasonic Inspection, Bonding and Min Clad

UT Bond Inspection

Channel Probe, Water Channels

Dimensional

Eddy Current, Filming Thickness

Completed Element

Missouri Completed Element

Preparation for Shipment

Loading of Elements

TRIGA Type Fuel

Dimensional

Weld Inspection/100%

Leak Test Equipment

Leak Testing Chamber T

Final Visual

Completed TRIGA Elements

Receipt of Fuel

Receipt Inspection

Control of Quality Records Maintenance of Quality Records based on Requirements of NQA-1 –Records Consist of Documents, UT Traces, X-Ray Film, etc

Control of Quality Records Record Retention –Lifetime Records –Nonpermanent Records

Oversight Inspection In Process Prior to Shipment Inspections are Checked due to the Complexity of the Processes