TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
02/07/2014R. Guida CERN/PH-DT-DI1 RPC R&D Collaboration PH-DT Topics of Interest Studies of gas systems performance and development of dedicated gas modules.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Analysis Modules F. Hahn. Goal of todays Meeting Inform about current status and layouts of the analysis modules. (the focus will be on common modules)
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Optimization of the Resistive Plate Chamber operation with a closed loop gas system at the Large Hadron Collider experiments M. Capeans, I. Glushkov, R.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
The RPC Closed loop Gas System Slides from Bianco and Guida.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
60kW Thermosiphon control system
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
S.Colafranceschi 20 June Stefano Colafranceschi LNF Frascati CERN Universita’ di Roma – La sapienza An overview on gas studies, purifier materials.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Control System for a four component Gas Mixing Unit Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Alice TOF Production Readiness Review Gas Control Systems.
Demineralised water cooling system
Gas Schedules
Gas system Commissioning procedures and status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Presentation transcript:

TOF Gas System Project Overview

Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel flow meter Materials List Components: selection, cleaning, procurement. Deliverables from TA1 Cost and Schedule

RPC Aging Test (ATLAS and CMS) Realistic test of chamber response with a closed loop gas system. Gas system uses as many final components as possible. Tests running since mid- June 2003 in GIF. First results show that the purification of these gases is feasible, but the use of regeneratable purifiers could be very tricky.

Overview

TOF Gas System Main Parameters (non-flammable)

Gas Circulation Loop Distribution units 2 independent Regulations. Pump Module Mixer Module Purifier Module

Purifier Module Twin column Purifier Module with inline regeneration. Note: At this stage it is unclear whether such a Purifier is suitable for the TOF detector.

Mixer Module 3 Primary gases Mixture : C 2 H 2 F 4 / iC 4 H 10 / SF 6 90% / 5% / 5% (non flammable) Permanent IR–analysis monitoring iC 4 H 10 concentration Fill and Run MFC for each gas

Pipe Summary To be checked by TOF Group existing new

Distribution Rack (One Unit) Flow Cells measuring input output flows Pressure controller Back-up gas for power faillures

PT100 Channel Flow Meter Flow Cell incorporated in input and output gas manifolds. Measurement Principle: 1)Measure ambient temperature. 2)Switch on heating current 3)Wait until T has risen by  T=20 o C. 4)Take last 50 points and fit slope. 5)Wait until cool down to ambient T. (~40 sec.) Measurement cycle time s Proposed by M. Bosteels Developed by: S. Haider, C. Zinoni + S. Morozov

Materials List To be checked by TOF Group

Cleaning, Component Selection + Procurement Many tests done for component purity. Arrangements with suppliers for grease free components are put in place. Extra cleaning for some components is done at CERN. (depends on requirements, serious congestion in cleaning CERN service) Numerous compatibility tests for radiation and B-field compatibility. All electrical and electronic components are tested. Simplified purchasing procedures arranged by SPL with many suppliers.

Work share for TOF Gas System TA1 will cover the design, procurement of components, construction and installation of the gas racks. Commissioning will entail several phases, and needs participation from the TOF group. Deliverables from TA1: –Gas system modules: Mixer, (Purifier), Circ. Rack, Pump, 2 Distribution racks and some (minimal) Analysis. –Control system for all modules, PLC’s, etc. (not the PC’s for the control room). –Documentation: schematics, technical descriptions, user instruction manuals, To be covered by ALICE TC or TOF Group: –Modifications to existing fixed piping network : SG to Plug and Plug to UX. –New gas piping for connections from Distribution Racks to Chambers. –Cabling between Zones: SG to Plug, Plug to UX, and any cables to the chambers. requires definition from detector group

Cost Estimate

Gas Installation Periods (as they are known today) TOF

Construction Schedule for Distribution units: Two Options: 1)Starting end 2004 for delivery in Disadvantage: risk schedule shift in ATLAS which makes this period very busy. 2)Starting end 2003, so in parallel (or before) with ATLAS construction. This is to be discussed and decided by September 2003.