TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

CLOUD Financial Review Committee meeting #3 1 October 2014 Financial plan for 2014 and beyond 1 Oct 2014, indico: rd FRC meeting, Antti Onnela,
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
P. Tropea for the PH-DT CO 2 team CO 2 CERN 11 March 2015 CO 2 cooling activities in PH-DT.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Today Wed Class schedule update & Presentation Forums (5’)
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
June 25, 1998 Is NT needed at CERN? Andreu Pacheco, LHCb / CERN 1 LHCb Computing Architecture Meeting Is NT needed at CERN? Andreu Pacheco LHCb / CERN.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
TRACI V3 Status and material for discussion Feb 6 th 2014.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
CCRC’08 Weekly Update Jamie Shiers ~~~ LCG MB, 1 st April 2008.
Week 3 Outline Post-Mortem By: Jamaral Johnson. 2 After Actions Review In this presentation I will do my best to highlight what went wrong. This is just.
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
CERN HR Department Personnel Management and Development Davide Vitè HR-PMD – TEC, News from Technical Training TEC,
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Compressor status AWAKE Technical Board meeting 19 August 2015.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Goal Setting The number of Team Members per month is a more important goal than a dollar goal.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
Progress report Collaboration meeting 23-SEP-2009
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
WLCG Planning Issues GDB June Harry Renshall, Jamie Shiers.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Year End Submission Workshop Liz Chapman – Pension Team Leader (Systems) Simon Robinson – Pensions Officer (Systems)
1 UK PM Report Costs & Schedule Alan Grant, STFC.
A. Valassi – CERN Clouds 2 nd Price Inquiry LHCb brainstorming – 7 th Oct CERN Cloud 2 nd Price Inquiry Andrea Valassi (IT-SDC) Thanks to Andrew,
G. Passaleva Status of MWPC production site in Florence G. Passaleva.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
Ken Wyllie, CERN LHCb electronics, 8th October LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm): 3 rd December
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
Feedback on transfer line sizing and flow calculations for UT
update on UT cooling system
CMS Perugia Modules Production Review
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Pixel layouts, cost, production…
Presentation transcript:

TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015

LHCb CO2 cooling meeting | 15 April TRACI V3 # Very bad news: BIG SHIFT announced by Richard French (Sheffield) on Apr 13 th A bending tool broke A couple of welding errors spotted required corrections; The flange for the Large HNP pump was produced based on the wrong drawing; The adapter received from Oxford for the small HNP pump was found “not convincing” and re-launched in production; Basically no activity whatsoever trough the Easter week; Big (internal) misunderstanding: the local workshop had not understood that they are supposed to produce also the “local boxes”, which they have to start from scratch. Additional bad news: the cost announced for the shipping seems to be very high (much more then they expected and were ready to pay), so they are considering now the option of waiting that ALL the units are ready and organize the transport internally with a small truck of the institute. We will explore all possibilities.

LHCb CO2 cooling meeting | 15 April TRACI V3 # New assumption now is that the MILANO unit will be ready for SHIPPING FIRST WEEK OF JUNE. This has some contingency, but experience says that it will be used. The other two units are still 2 weeks behind (the shift is fully rigid) If financial considerations push for a single shipment of the 3 units together, than this can only happen, say, June 22 nd and the units will be at CERN for assembly and commissioning at the END OF JUNE. We will of course start immediately the commissioning of the MILANO unit first, so it will be much useful if a “team” from Milano (Simone +…) can be prepared to come to CERN end of June and stay for ~2 weeks. At this point the estimated start of the UT testing activity in Milano cannot be before 2 nd or 3 rd week of July. If the Milano team is ready for test activity on the stave before, the offer made last month will be kept open and valid: CMS has kindly agreed to make available its “TRACI V2” (upgraded with a “small HNP” pump) as of today, if needed. The tests for the UT stave could therefore start in any moment, if Milano can transport at CERN the UT stave model and send people here.

LHCb CO2 cooling meeting | 15 April Update on Coriolis flowmeter for  -channels … 0.28 g/s Extremely time consuming procedure to get information from Bronkhorst on how to use the Mini Cori-Flow instrument with cold liquid. For the time being still passing through the commercial representatives, with little understanding of technical details. Few clues received, but not clear. From Bronkhorst UK all at sudden yesterday we received a message suggesting that they could produce a special version with remote electronic, which would solve the problem: we are inquiring…. Cost of selected model: 2700 EUR!!!