CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO

Slides:



Advertisements
Similar presentations
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
Advertisements

International Telecommunication Union TSAG Newbie Session, July 2004 TSAG Newbie Session TSAG Chairman
3GPP's co-operation with the ITU Dr
LME/DMU Inge Jonsson 1 ITU - TSB Informal Consultations Document No. 9 Martigny, February 2000 Source:ERICSSON (Mr. I. Jönsson) Title.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 14 1 All you always wanted to know about.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 1 1 All you always wanted to know about.
Conference for FOOD PROTECTION Promoting Food Safety Through Collaboration.
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
Chesapeake Bay Program Goal Development, Governance, and Alignment Carin Bisland, GIT6 Vice Chair.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, 2.
1 [4.1]a Criteria for successful consolidation SDOThreshold/Foundation/Launch After/During Formation, Near-Term Comment Summary of discussions Verticals.
4.6 Creation of 3GPP 4.7 How does 3GPP Operate? 4.11 Beyond 3GPP Release ’99.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
M2M Global Initiative OneM2M April 24, 2012
DOCUMENT #:GSC15-PLEN-13r1 FOR:Presentation SOURCE:ARIB AGENDA ITEM:OPENING PLEN 6.1 CONTACT(S):Kohei Satoh Update ARIB.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
What is ETSI EMTEL all about Claire d’Esclercs Technical Officer for EMTEL European Telecommunications Standards Institute.
GSC May Ottawa, Canada1 3GPP2 – From Sydney to Ottawa Gerry Flynn Verizon Wireless 3GPP2 Steering Committee Vice-Chair.
GSC-8xxx SOURCE:TIA TITLE:IPR Working Group Report AGENDA ITEM:Closing Plenary Agenda Item 1.1 DECISION DISCUSSIONX INFORMATIONX 21/10/2015 Report on the.
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
31 January Table of Contents (1) 3- Draft Partnership Project Description22- The Partnership Project Agreement (1)3- Draft Partnership Project Description22-
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
International Telecommunication Union ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Yukio Hiramatsu Chairman, TTC IPR Committee.
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
1 The GCC Metrology Group GULFMET Mohammad Al Mulla GSO - Building for Integration
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
1 [4.7]a Structure of M2M Consolidation SDOStructureComment Overall Goals of Structure: Be responsive to the needs of the vertical market stakeholders.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
Draft Operating Arrangements.  Steering Committee decision  Global Pooled Fund Task Force  Collaborative effort  “Term Sheet” developed by the Task.
Welcome Ms. Cheryl Blum Chair, 3GPP2 Steering Committee
05/02/ “Report on general ETSI activities since GSC#8” Karl Heinz Rosenbrock ETSI Director-General GSC-9, Seoul SOURCE:ETSI TITLE:Report on general.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Doc.: IEEE /0730r0 Submission July 2005 Stefano M. Faccin, NokiaSlide 1 3gpp2-liaison-report-july-2005 Notice: This document has been prepared.
Introduction to 3GPP Specification & new Trends in Radio Networks
CJK B3G Standards Collaboration Jinsung Choi Ph.D TTA PG301 Chair & Vice-President of LGE, Mobile Communication Technology Research Lab. Telecommunications.
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
VICH General Principles and current update of VICH Outreach Forum activity 1.
Kerstin Ödman Chair of the Strategy Working Group Ad hoc NDPHS Strategy Working Group Report for the NDPHS committee of Senior Representatives Riga,
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC Emergency Communications Task Force Report (GSC-EM TF) Presenter: Chantal Bonardi GSC-EM Task Force.
Jeju, 13 – 16 May 2013Standards for Shared ICT oneM2M Project Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman Document No: GSC17-PLEN-38.
31 January Table of Contents (1) 3- Draft Partnership Project Description22- The Partnership Project Agreement (1)3- Draft Partnership Project Description22-
TEXAS NODAL (ERCOT REVISIONS)
Status report on CJK NGN Working Group
Overview of U.S. Participation in ISO and IEC
Status report on CJK NGN Working Group
Documentation Overview
3GPP Status.
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
GSC Emergency Communications Task Force Report (GSC-EM TF)
Table of Contents (1) 31 January 2001
UFNPT Planning and Development Work Plan, Milestones and Timelines
Standards for Shared ICT
Standardization Activities in TTC
Standardization Activities in TTC
Update of ARIB Activities on IMT Standardization
Activities of ARIB on IMT Standards
GSC IMT Task Force Report
3gpp-liaison-report-may-2005
Presentation transcript:

CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO

CJK9, Zhangjiajie, China 2/14 Background Scope of Works Way Forward

CJK9, Zhangjiajie, China 3/14 1. CJK in 3GPPs community 3GPP membersPartner 3GPP2 members 76.81%265 ETSI NA 6.95%24 ATIS : TIA % 16.23%56 Asia Region (4 SDOs) % 25 ARIB 4 11 CCSA 5 12 TTA 6 8 TTC 3 345Sub Total52 Y2009 I. Background

CJK9, Zhangjiajie, China 4/ GPP TSG Leadership Position ETSI: 1 (Chair) + 3 (Vice Chair) ATSI: 1 (Chair) + 2 (Vice Chair) ASIA(CJK):1 (Chair) + 4 (Vice Chair) USA (TIA): 3 (Chair) + 1 (Vice Chair) China (CCSA): 4 (Vice Chair) Japan(ARIB/TTC):1 (Chair) + 2 (Vice Chair) Korea (TTA): 4 (Vice Chair)

CJK9, Zhangjiajie, China 5/14 10 years of history Organizational position 3GPP: 4 SDOs in CJK as one region 3GPP2: SDO balance and 4/5 SDOs Very well positioning 3. Other facts Continuation of CJK co-operation in 3GPP community 4. Based on CJK B3G Collaboration Framework - At Okinawa meeting, the future collaboration of CJK B3G was discussed and the way forward was considered as extending collaboration area to other standardization areas. - CJK should pay attention to 3GPPs activities and should take leadership in order to promote our interest within 3GPP community

CJK9, Zhangjiajie, China 6/ GPPs working procedure 3GPP PARTNERS Organizational Partners Market Representation Partners Organizational Partners’ Standardization Process Organizational Partners’ deliverables Technical Specifications INDIVIDUAL MEMBERS Technical Contributions ITU International Recommendations IMT 2000 Contributions via existing processes Regulators / Governments Mandates TSG Project Co-ordination Group Radio Access Network Core Network /Terminal GERAN Service and System Aspects TSG II. Scope of Works

CJK9, Zhangjiajie, China 7/ GPPs is contribution driven… -All progress is the result of contributions… -Progress can be accelerated by more input… -New Features may be proposed by 3GPP Individual Members, so… -Make sure your company participates in 3GPP 2. 3GPPs is characterized by the following attributes : - Minimum production time for Technical Specifications from conception to approval; - Fast, electronic based approval process; -Minimum number of hierarchical levels with decision making taking place at the lowest appropriate levels. -Task oriented, ensuring that on completion of the tasks the future of the project is re-evaluated; -Cost effective use of financial/human resources provided by Partner Organizations (if required).

CJK9, Zhangjiajie, China 8/ PCG Tasks in 3GPP appointment of PCG Chairman and Vice Chairmen; allocation of human and financial resources provided by Organizational Partners to TSGs; allocation of voluntary human and financial resources provided by Market Representation Partners and Individual Members; management of the 3GPP Support Team; handling of appeals from Individual Members on procedural matters referred to them; propose and approve modifications to the Partnership Project Working Procedures; handling of appeals from Individual Members on technical matters referred to them; determination of the overall time frame and manage overall work progress; final adoption of new and stopped work items proposed by the TSGs within the agreed 3GPP scope and objectives; when a work item is outside the scope of the 3GPP, and where a common global solution is desired, recommend how to achieve a global solution; appointment or dismissal of TSG Chairmen and Vice Chairmen, as proposed by TSGs based on election results. (The proposed candidate shall be appointed unless there are extraordinary reasons that prevent such an appointment, e.g., severe company or geographical imbalance within 3GPP. In such cases the TSG shall be requested to elect an alternative candidate. The decision not to appoint a candidate shall be made by consensus.); authorizing requests from the TSGs for approval to liaise with external organizations, and maintain a list of approved requests; maintenance of the register of Individual Members eligible to participate in 3GPP; maintenance of the register of IPR declarations relevant to 3GPP, received by the Organizational Partners.

CJK9, Zhangjiajie, China 9/ OP Tasks in 3GPP The Organizational Partners shall determine the general policy and strategy of 3GPP., In addition the Organizational Partners shall perform the following tasks: approval and maintenance of the 3GPP scope; maintenance the Partnership Project Description; taking decisions on the creation or cessation of Technical Specification Groups, and approving their scope and terms of reference; approval of Organizational Partner funding requirements; allocation of human and financial resources provided by the Organizational Partners to the Project Co-ordination Group; acting as a body of appeal on procedural matters referred to them.

CJK9, Zhangjiajie, China 10/ SC Tasks in 3GPP2 allocation of voluntary human and financial resources provided by Market Representation Partners and Individual Members; handling of appeals from Individual Members on procedural matters referred to them from TSGs; handling of appeals from Individual Members on technical matters referred to them; recommendation of modifications to the Partnership Project Agreement, Partnership Project Working Procedures and Partnership Project Description, for Organizational Partner approval; approval of existing TSG Terms of Reference not requiring additional funding nor changes to the guiding scope of 3GPP2. determination of the overall time frame and manage overall work progress; final adoption of new and stopped work items proposed by the TSGs within the agreed 3GPP2 scope and objectives; confirmation of appointment or dismissal of TSG Chairs and Vice Chairs, as proposed by TSGs. (The proposed candidate shall be appointed unless there are extraordinary reasons that prevent such an appointment, e.g., severe company or geographical imbalance within 3GPP2. In such cases the TSG shall be requested to elect an alternative candidate. The decision not to appoint a candidate shall be made by consensus.); maintenance of the Register of Individual Members eligible to participate in 3GPP2 based on input received from Organizational Partners; final adoption of Technical Specifications and Technical Reports forwarded from the TSGs.

CJK9, Zhangjiajie, China 11/ OP Tasks in 3GPP2 approval and maintenance of the 3GPP2 scope; maintenance of the Partnership Project Description and the Partnership Project Working Procedures; approval of Organizational Partner funding requirements; appointment of the SC Chair and Vice Chairs; approval of Creation of TSGs and their Terms of Reference; approval of Dissolution of TSGs; approval of existing TSG Terms of Reference requiring additional funding or changes to the guiding scope of 3GPP2; allocation of human and financial resources provided by the Organizational Partners; acting as a body of appeal on procedural matters referred to them; validation and acceptance of applications for 3GPP2 partnership; making decisions relating to the dissolution of 3GPP2; resolving voting right disputes, if necessary, of multinational organizations; management of the 3GPP2 Secretariat; handling of appeals on regional matters of a regulatory nature referred to them from the SC.

CJK9, Zhangjiajie, China 12/14 6. Levels of focus on 3GPPs matters for CJK collaboration Project Co-ordination Group (PCG) Steering Committee Organizational Partners Review of previous meeting and status Preparation for Issues arising

CJK9, Zhangjiajie, China 13/14 Contact person and Issue Coordinator III. Way Forward CJK Coordinator Japan

14/14