4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK 28-29 May, 2007.

Slides:



Advertisements
Similar presentations
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Advertisements

ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
Agenda for 1st TB and SGC Joint meeting on Dec. 13 (from 15:00 to 19:00) 15:00 to 17:00 Open Session 15:00-15:30 Review of Hardware and Instrumentation.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
ATF2 project in the ATF international collaboration, including coordination issues Junji Urakawa, KEK ATF2-IN2P3-KEK kick-off meeting Annecy, LAPP, for.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
1 You have to Check URL of Change of ICB and TB member or member’s institute comparing last meeting.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Special ATF Session - ATF/ATF2 day on 28th September -
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
ILC-Americas Regional Team Review
Plans for Laser-wire System Grahame Blair 30th May 2005
Oversea collaborators
report from 12th ATF TB & SGC meeting and trip to KEK
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
ATF2 review R. Tomas ATF2 review web:
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
Fast ion instability WP 15
Progress towards nanometre level beam stabilisation
Junji Urakawa ( for collaborators ) March KEK at LNF
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Presentation transcript:

4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK May, 2007

ATF Technical Board The Technical Board (TB) consists of approximately 4~5 members from each of the Asian, North American and European regions. The members of the ATF Technical Board are nominated and appointed by the International Collaboration Board (ICB). The TB serves the following tasks: –At the request of ICB, assist the Spokesperson in formulating the ATF Annual Activity Plan, which outlines the activity plans of ATF/ATF2 including the budget and beam time allocation for each Japanese fiscal year. –Assist the ICB in assessing the scientific progress that is being made by the ATF collaboration.

ATF Technical Board Membership Europe E. Elsen, DESY G. Blair, RHUL (Royal Holloway, University of London) P. Burrows, Oxford University F. Zimmermann, CERN A. Wolski, CI North America T. Raubenheimer, SLAC M. Ross, FNAL Asia K. Yokoya, KEK N. Toge, KEK T. Sanuki, University of Tokyo J. Gao, IHEP E-S. Kim, KNU

ATF System/Group Coordinators The System/Group Coordinators will be appointed by the Spokesperson with the approval of ICB. The appointment of the System/Group Coordinators shall be made in a manner consistent with the ATF Annual Activity Plan. The System/Group Coordinators will coordinate the tasks charged to the assigned Systems or Groups, and will help the Spokespersons and the Deputies to coordinate the ATF/ATF2 research programs. In case of any small study group with less than five members, the Spokesperson or the Deputies may assume the role of Coordinator for this group on an acting basis.

ATF System/Group Coordinators Deputy for Beam Operation: Shigeru Kuroda (Toshiyuki Okugi) Deputy for Hardware Maintenance: Nobuhiro Terunuma (Masao Kuriki) Deputy for ATF2: Andrei Seryi (Toshiaki Tauchi) Hans Weise, DESY Frank Zimmermann, CERN Philip Burrows, Oxford Grahame Blair, RHUL Philip Bambade, LAL Marc Ross, FNAL Janice Nelson, SLAC (not decided) Andrei Seryi, SLAC Bob Meller, Cornell Jie Gao, IHEP Eun-San Kim, KNU Kiyoshi Kubo, KEK Shigeru Kuroda, KEK Nobuhiro Terunuma, KEK Masao Kuriki, KEK Toshiaki Tauchi, KEK Toshiyuki Okugi, KEK Riyuhei Sugawara, KEK Tomoyuki Sanuki, University of Tokyo

Agenda for 4th ATF TB/SGC Meeting, CI, May 2007 Review of Hardware and Instrumentation R&D at ATF Jan-May 2007: Plan of beam extraction by using strip-line kicker with pulse bump orbit (Takashi Naito) Laser wire R&D progress (Stewart Boogert) FONT R&D progress (Glenn Christian) X-SR and CSR R&D (Nobuhiro Terunuma) IP cavity nm-resolution BPM (Yosuke Honda) Status of ATF DR BPM upgrade (Janice Nelson) Plan and preliminary results for fast ion instability study (Junji Urakawa) Proposals for new studies: MONALISA in ATF (David Urner) ILC LC-BEAM-3 collimator damage test (Nigel Watson) Status of ATF2 project (Toshiaki Tauchi and Andrei Seryi) TB and SGC joint discussions: ATF2 construction schedule and beam commissioning. Remote participation by collaborators in ongoing research program at ATF.

Beam extraction using fast kicker/pulse bumped orbit (T. Naito) System required to produce beam with ILC-like time structure in ATF2 by single-bunch extraction from ATF damping ring. Will use two fast (~ 3 ns) kickers, pulsed orbit bump, and septum. On schedule for beam tests in Spring 2008.

Extraction line laser wire (S. Boogert) Aims for fast beam-size measurement in extraction line with micron precision. Extensive characterisation of system performance and various improvements and upgrades made over the past year, including installation of new (custom) lens. Beam-size measurement of 8  m demonstrated. Laser upgrade in summer 2007 planned, in order to reduce laser waist size.

FONT4 R&D Progress (G. Christian) Aims to develop digital technology for feedback at ILC IP on nanosecond timescales. Current system goal is for total latency of 140 ns or less. This goal has now been demonstrated in beam tests in the ATF extraction line, using bunches with 154 ns separation.

X-ray synchrotron radiation beam-size monitor (N. Terunuma) Aims to develop a fast (~ ms) beam-size monitor with micron resolution, for damping ring tuning and maintenance of optimum performance. Earlier studies (2005) revealed orbit oscillations at a frequency of 100 Hz, and amplitude of around 10 µm in the vertical. Following grounding and shielding work on the ATF electrical systems, the amplitudes of orbit oscillations have been reduced substantially.

Coherent Synchrotron Radiation (A. Aryshev) CSR has the potential to impact beam stability in the ILC damping rings. The project at the ATF aims to characterize CSR effects in the storage ring, and validate theoretical models. Using a Schottky Barrier Diode, mm-wavelength signals have been detected from the beam in a dipole in the first few turns after injection. The strength of the signal increases as the square of the bunch charge as expected for coherent radiation; but wake fields may also display this behaviour. Tuning the injection systems on the mm-wavelength signal has been shown to be an effective technique for optimizing injection into the ATF damping ring.

IP cavity nm-resolution BPM (Y. Honda) Aim is to develop a cavity BPM with nm resolution, which can be used at the IP of ATF2, to confirm achievement of the goal of delivering beam with stability on the nm level. Two BPMs have been fabricated, the detection electronics developed, and the BPMs have been installed, calibrated and tested in the ATF extraction line. Resolution of around 8 nm has been demonstrated at a bunch charge of 7  Further developments are planned to improve time resolution capability for multibunch mode.

ATF damping ring BPM upgrade (J. Nelson) Improved BPM performance at ATF is needed in order to demonstrate the goal of 2 pm for the ILC damping ring vertical emittance. Progress continues with installing and testing Echotek BPM electronics at the ATF. Digital electronics provides high-resolution (~ µm) turn-by-turn measurements with good stability and low systematics. Currently, twenty BPMs (ten in each arc) have been installed, with recent modules provided by Fermilab. Significant improvements are already seen in BBA data collection and analysis. ± 700 um ± 25 um

Fast ion instability: recent results and future plans (J. Urakawa) Fast ion instability is a serious concern for the ILC damping rings. Experiments at ATF in 2004 showed beam-size blow-up along the bunch train, as a function of beam current and vacuum pressure. The experiments were repeated in early 2007, but no clear blow-up was observed. The difference may be due to the vertical emittance, which was around 5 pm in 2004, and pm in The experiments will be continued later in 2007, with (it is hoped) much lower vertical emittance, and with a “gas inlet vacuum chamber” to provide a local pressure bump.

Proposal: MONALISA (D. Urner) MONALISA aims to demonstrate monitoring of the relative position of a final doublet quadrupole and the Shintake monitor in ATF2 at the nanometre level. Ultimately, the goal would be to monitor the position of the IP BPM at the same level, as part of the overall goals for nanometre beam stability in the second phase of ATF2. The vacuum pipes required for the laser beams in the monitoring system have the potential to introduce forces on the final doublet quadrupoles and the Shintake monitor. This issue needs to be carefully considered as part of the plan. Initial studies are required to understand the potential impact, and to demonstrate that no adverse effects will result.

Proposal: LC-BEAM-3 collimator damage test (N. Watson) The goal is to collect data on the effect of beam impact on candidate materials for the ILC collimators, including titanium alloy. Data on performance of different materials under impact of high-energy electron bunches are needed in parallel with collimator wakefield studies, to optimize the design of the ILC collimators. The ATF extraction line provides a unique opportunity to perform these tests in a relevant regime of beam energy and beam size. Fractures and the impact of shock waves are a concern. Data are required to validate models of mechanical response to the energy deposition, including shock waves. Heated Zone Compressive waves Reflected tensile waves Reflected Shear Waves

Proposal: LC-BEAM-3 collimator damage test (N. Watson) Initial experiments would involve locating a movable sample of candidate materials in the ATF extraction line, to be impacted by the beam. Further experiments would allow measurement of the potentially damaging shock waves in a sample generated by a bunch impact. For these experiments to be carried out, the radiation rules at ATF need to be modified (expected in the next few months), and the radiation that will be generated by the tests must be carefully modelled. sample holder x y reference pin hole guide channels low mass mounting CuTi target area 10mm

Discussion: Remote participation in ATF studies Workers at SLAC participated in BBA studies at ATF in February Computer connection (“desktop sharing”) provided by WebEx. Audio/video connection provided by Skype. ATF rules restrict remote “control” of the machine, for reasons of personnel and machine protection. Experience was frustrating at times, but ultimately very successful. Several options exist for IT tools to support: –sharing data; –remote participation. Experiments should continue, but should not be too ambitious too quickly.

Conclusions The ATF continues to provide a unique facility for an active R&D program on instrumentation and beam dynamics. The R&D program at ATF is focused on critical issues for the ILC. There continue to be important developments. Two new proposals: –MONALISA for ATF2 –beam collimator damage tests were approved by the Technical Board and System/Group Coordinators, subject to certain conditions. IT tools are becoming available to support data sharing and remote participation in experiments. Initial tests have been encouraging, and it is hoped there will be increasing opportunities for remote participation by ATF collaborators.