Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Grey Level Enhancement Contrast stretching Linear mapping Non-linear mapping Efficient implementation of mapping algorithms Design of classes to support.
1 A proposal of new simple system for testing a large number of MPPC for the R&D phase of GLD calorimeter 2007/Feb/6 ACFA ILC Workshop ICEPP, University.
Comparing ZS to VR David Stuart, UC Santa Barbara June 19, 2007.
Juan Valls 1 TOB System Test Status Report  DS ROD System Test Setup  DAQ Software  DS ROD Characterization PLL, FED Timing Scans OPTO Scans  Noise.
Cluster Threshold Optimization from TIF data David Stuart, UC Santa Barbara July 26, 2007.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
E. Noah, CMS Tracker Week, January 2003 APV Power Dependence on Trigger: First Observations on Hybrid Effect first observed in Strasbourg and reported.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
SCT Analyses on Cosmics. Efficiency 2 methods –Online- quick/biased -> located in SCT_Monitoring –Offline- slow/unbiased In agreement with each other.
An offline look at TIF data David Stuart UC Santa Barbara May 2, 2007.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
UA9 Collaboration H8 Sept’10 Run - Preparatory Meeting Review & Status of the Telescope DAQ and Online/Offline Software Mark Pesaresi Jonathan.
October, 2004CMS Tracker Week1 APV settings at cold temperatures Objective: provide recommendations for APV I2C settings for cold operation, for test beam.
Event display monitoring Giuseppe Zito : Infn Bari Italy Beliy Nikita : University of Mons-Hainaut Belgium.
Data Quality Monitoring of the CMS Tracker
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System.
Radiation Damage in the CMS Strips Tracker Christian Barth on behalf of the CMS Tracker Collaboration.
1 APV25 I 2 C parameters Brief reminder of what the I2C registers do (from User Manual) Check on integration centre currently used parameters: TIB/TOB/TEC.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Waclaw Karpinski General meeting CMS TRACKER SYSTEM TEST Outer Barrel –TOB Inner Barrel –TIB End cap –TEC TIB TOB TEC Different Geometries One.
Electrical characteristics of un-irradiated ATLAS07 mini strip sensors A.Chilingarov, Lancaster University ATLAS Tracker Upgrade UK Workshop Coseners House,
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
MPPC update including plastic connector T2K experiment collaboration meeting 2007/4/18 (Wed) S.Gomi T.Nakaya M.Yokoyama ( Kyoto University ) T.Nakadaira.
Monitoring of background events in 2010 run Giuseppe Zito 06/11/2015 PFG/MIG Topical meeting on beam background.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
Data Analysis Econ 176, Fall Populations When we run an experiment, we are always measuring an outcome, x. We say that an outcome belongs to some.
1 Development of Multi-Pixel Photon Counters (1) S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira, K.Yoshimura, (KEK) Oct
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.
September 2007CHEP 07 Conference 1 A software framework for Data Quality Monitoring in ATLAS S.Kolos, A.Corso-Radu University of California, Irvine, M.Hauschild.
January, 2003CMS Ecal1 MGPA Specification Discussion – 9 th Jan. 03 OUTLINE 3 or 4 gain channels discussion technical background - why 3 gains could be.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
CMS Tracker: Detector Control Units & Tracker Monitoring My Summer Student project (A contribution to:) Fatima Kajout 11 th of August 2003Student Session.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
Predicting the In-System Performance of the CMS Tracker Analog Readout Optical Links Stefanos Dris CERN & Imperial College, London.
CMS FED Testing Update M. Noy & J. Leaver Imperial College Silicon Group.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
Summer Student 2003Ferro Livia1. Summer Student 2003Ferro Livia2 Contents Experimental setup Thermal behaviour and cooling performance of the TOB structures.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
CMS strip-Tracker Recent optolinks experience Karl Gill, Francesco Palmonari Thanks also to strip-TK commissioning team (and specifically Erik Butz, Steven.
22/06/2016James Leaver Current FED Tester Status.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Development of Multi-Pixel Photon Counters (1)
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
Monitoring system commissioning
X5 quasi offline Analysis
Characterizing FOX Demonstrator Test Setups for LArDPS to FEX Modules at CERN RuthAnn Gregory.
US Module Production Quality
Optical links in the 25ns test beam
DQM for the RPC subdetector
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci

Commissioning of the Optical Link: 5189 laser diodes were tested in the slice test at TIF each laser was tuned, to determine the optimal gain and bias setting, during the standard commissioning procedure with the CMS Tracker online software XDAQ and the analysis software RootAnalyser. A commissioning run is performed for each temperature: 15,10,0,-10,-15 0 C. This analysis is performed using the offline commissioning CMSSW framework (by Rob) Almost completed: 1)Validate CMSSW procedure for the basic configuration of the Optical Link Debug/test the code  Check using TIF data 2)Compare CMSSW – Root Analyser 3)Compare the performances of different Subsystems (TIB TOB TEC) 4)Study performance and detailed temperature effects (nominal 15 0 C, 10 0 C, 0 0 C, C, C) Ongoing: 1.Propose new histograms and variables for link performance (E.g. link noise contribution at different bias values... ) 2.Propose a standard procedure for monitoring of link performance during the Tracker operations (Reliability and radiation effects)

Package: /CMSSW_1_4_0/src/DQM/SiStripCommissioning: /SiStripCommissioningClients/src/OptoScanHistograms.cc (RB) (  /SiStripCommissioningAnalysis/src/OptoScanAnalysis.cc) Source_run#.root For each Gain produces: 1) Summary Histos_run#.root (not yet implemented!) 2) debug_7531.log file RU file stored on Castor + Cabling from Online DB /SiStripCommissioningSources/src/OptoScanTask.cc (RB) GainSummaryPlot.cc (VR) Summary plots.gif.root *Actual Gain : 0 *LLD bias setting : 21 *Measured gain [V/V] : *'Zero light' level [adc] : *Link noise [adc] : *Baseline 'lift off' [mA] : *Laser threshold [mA] : *Tick mark height [adc] : *Actual Gain : 1 *LLD bias setting : 20 *Measured gain [V/V] : *'Zero light' level [adc] : *Link noise [adc] : *Baseline 'lift off' [mA] : *Laser threshold [mA] : *Tick mark height [adc] : *Optimum LLD gain setting : 1 Analysis Procedure:

W W/2 Lift Off Laser Threshold = Lift Off –W/2 Tick Mark hight = W * Base Slope Measured Gain = Tick Mark * (1/0.8) * (1.024/1024) Best Gain ~= 0.8 Bias setting = Lift off + 2 Zero Light Level Laser Bias (I2C) 1 count = 0.45 mA FED output Laser Current = (Laser Thr * 0.45) mA Overlapping range 50% range “Tick” “Base” Fit to points within the 20% and the 80% of the range Coded by Rob

RUN #T nom ( 0 C)Partition TIBTOBTEC (reduced # of Connection) TIBTOBTEC TIBTOBTEC TIBTOBTEC TIBTOBTEC TIBTOBTEC TOB PP TEC TEC TIB PP TIB TOB Variables Monitored: 1)Best Gain 2)Bias Setting 3)Measured Gain 4)Base Slope 5)Tick Mark hight 6)Zero Light Level 7)Lift Off 8)Laser Thresold

Few Plots

@ different gains Bias Setting for different subsystem Measured Gain Target Gain = 0.8 Mainly Gain = C - Run 11309

Tick Height Slope vs Tick Base slope W = (Slope / Tick) -1 Independent on the subsystems and Gains (Laser + LLD) (Laser + LLD + APV) Input tick to link (=APV output tick) Different behavior TIB, TOB, TEC due to the different low voltage drop (see A. Venturi talk) C - Run 11309

Baseline lift off (mA) Laser threshold (mA) Zero Light Level  Trim DAQ value C - Run This distribution strongly depends on the temperature of each Fed channel. Gain 0 Correlated to Laser th = Lift off – W/2 - Related to the AOH temperature Double peak in TIB modules Structured peak in TOB and TEC TOB always higher  To compare with the distribution from the production

Digression: “Why double peak in laser th distribution?”

TIB Double SidedTIB Single Sided Fiber 1 Fiber 2 Fiber 3 Ccu26 ccu28 ccu30 Ccu27 ccu29 ccu31

CERN, 9 th October 2007 V. Radicci 12 Laser temperature “Tracker Map”: (fiber gain T=150C) “CMS Tracker Map Visualization” tool used here to map the laser temperatures: - TOB is hotter - two different temperatures for TIB modules (green and yellow in the map)  double peak in the TIB distribution Laser Threshold distribution Color scale from Red = hot to Blue = cool TIB Layers TOB Layers TID Disks TEC Disks - Powerful tool also for mapping the tick height, base slope… - Interesting results will come from the correlation between Tick and Laser Temperature CERN, 9 th October 2007 V. Radicci 12

CMSSW vs RootAnalyser:

CMSSW RA (T=-10 0 C) Difference channel by channel between Best Gain(CMSSW) – Best Gain (RA) 3.4% with diff>0 1) Comparison of Best Gain chosen for each laser

CMSSW RA Difference channel by channel between Bias (CMSSW) – Bias (RA) 16% with diff>0 mainly ±1 1) Comparison of Bias setting chosen for each laser

Due to the different gain Good agreement Robust performance of new code

Measured Selected Gain  comparison with the simulation

T=15 0 C T=10 0 C T=0 0 C T=-15 0 C T=-10 0 C Range 0.62 V/V – 0.96 V/V independent from temperature in Agreement with simulation! G0G1G2G3 T=15 0 C3.8%84.4%10.4%1.2% T=10 0 C7.3%84%7.8%0.7% T=0 0 C18.9%76.4%4.1%0.5% T=-10 0 C34%63.4%2%0.3% T=-15 0 C40.1%58.3%1.3%0.3% Gain spread looks reasonable. Usual effect of increased gain with higher temperature. Values to be compared with simulation

Temperature dependence – all distributions are fitted with a Gauss function, the mean and the error are plotted as a function of Temperature

Nominal cooling temperatures !! The parameterhave to be determined by comparing with other measurements: PLC, DCU - Laser threshold current is temperature dependent. - Different values with gain and subsystems at the same nominal temperature! - The the laser threshold (I th ) can be used to evaluate the actual laser temperature T according its known exponential behavior:

T Warm – T +10 T Warm – T 0 T Warm – T -10 T Warm – T -15 In order to compare the AOH temperature and 1)the temperature of the cooler or of the air (PLC measurements), 2)the temperature of the sensor and of the hybrid (DCU readings) we can considering the temperature variation ΔT=(T 1 -T 2 ), measure on the same element (laser, hybrid…), for different experimental condition. ΔT evaluated from I th for different values of

Mpv from the fit Warm : C Warm : 0 0 C Warm : C Warm : C C : C DCU- Hybrid DCU- Sensor PLC Warm : C ~4.9 Warm : 0 0 C ~15.1 Warm : C ~23.5 Warm : C ~ C : C To be checked!!!! A. Venturi

Now “the laser is a good thermometer” !!! Note large ΔT over nominal

Effect of T on link gain and tick mark height (Laser + LLD) Tick height at FED (Laser + LLD + APV) Input tick to link (=APV output tick) Laser alone W = Tick Height / Base Slope Measured gain prop to Tick

Fit slope: G0: G1: G2: G3: Decrease = (0.55±0.02) % / 1 0 C Fit slope: G0: -2.4 G1: -3.1 G2: -4.4 G3: -5.8 Decrease = (0.49±0.03) % / 1 0 C Gain change seems dominated by laser –Individual lasers vary more and do not necessarily follow average trace APV tick is constant!

Fit slope: G0: G1: G2: G3: Decrease = (1.0±0.1) % / 1 0 C Fit slope: G0: 0.18 G1: 0.19 G2: 0.18 G3: 0.18 Decrease = (1.0±0.1) % / 1 0 C Particular behavior of the Zero light level an explanation could be considering the fed temperature channel by channel

Conclusion –Links commissioning software/analysis in use on TIF data CMSSW code stable –New parameters included »Laser threshold, noise, tick input height –Able to check out detailed effects –Move development effort now onto details of performance (e.g. noise) and monitoring (Ana talk)