Accounts Chamber of the Russian Federation Approaches to comprehensive project and program audit in the Accounts Chamber of the Russian Federation.

Slides:



Advertisements
Similar presentations
1st Meeting of the Working Party on International Trade in Goods and Trade in Services Statistics - September 2008 Australia's experience (so far) in.
Advertisements

CHAPTER 2 Client-Adviser Relationship. Introduction A vast amount of information is available to clients, but an adviser’s judgement is needed. Building.
Software Analysis Tools
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
Pertemuan 5-6 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Introduction to Software Architecture. What is Software Architecture?  It is the body of methods and techniques that help us to manage the complexities.
Conclusions, planning and prospects Follow-up committee meeting 6 October, Leuven.
Business Driven Enterprise Architecture Assessment Methodology Josh Arceneaux August 16, 2011.
1 July 23, 2002 Strategic Technology Plan Briefing to LOT Committee.
Project Management Basics
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Enterprise Architecture
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
Software Project Management Introduction to Project Management.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Architectures review for interoperability in e-health
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on finances Partner Search Forum Poznań, Poland 16 – 17 December 2008.
The Challenge of IT-Business Alignment
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Uncertainty management in Statoil (Risk and opportunity management)
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
Accounts Chamber of the Russian Federation Auditor of Accounts Chamber of the Russian Federation Alexander Piskunov Possibilities of using information.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
Relationships July 9, Producers and Consumers SERI - Relationships Session 1.
Ит Application of special software for IT-audit Nikolay Nekhoroshkin Alexey Solodov Accounts Chamber of the Russian Federation.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
The Future Approach to EU Budget Support Structured Dialogue Meeting 9 th /10 th November 2011 Lars Wilke, DG DEVCO A2 Economic Analysis, Public Finance,
University of Sunderland CIFM02 Unit 4 COMM02 Project Planning Unit 4.
Catawba County Board of Commissioners Retreat June 11, 2007 It is a great time to be an innovator 2007 Technology Strategic Plan *
Development of standard for state information systems and projects audit Proposals for the Work Plan 2014–2016 Accounts Chamber of the Russian Federation.
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
Experience of the Accounts Chamber of the Russian Federation in Performance Auditing of Public Debt Management Vilnius, Lithuania June 2011 Accounts Chamber.
1 V&V Needs for NextGen of 2025 and Beyond A JPDO Perspective Maureen Keegan JPDO Integration Manager October 13, 2010.
MODEL-BASED SOFTWARE ARCHITECTURES.  Models of software are used in an increasing number of projects to handle the complexity of application domains.
Business System Analysis Methodology Presentation.
What is Enterprise Architecture March Enterprise Architecture Architecture –the fundamental organization of a system, embodied in its components,
University of Sunderland ENGM91 Unit 4 ENGM91 Project Planning Unit 4.
Copyright 2012 John Wiley & Sons, Inc. Chapter 12 Project Auditing.
Vector INTERNAL CONTROL Mike Trigg. vector WHAT IS INTERNAL CONTROL? A key part of effective corporate governance Policies and processes to: - make operations.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Capacity building for the development of the sustainable use strategy of water resource in DPR Korea.
What has been accomplished at the end of MSD 1 & 2?
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Collaboration Process 1. IC Objectives and Risk Tolerances Define, document, and implement top-down internal control objectives and risk tolerances: 
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
United Nations Statistics Division Developing a short-term statistics implementation programme Expert Group Meeting on Short-Term Economic Statistics in.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
RISK MANAGEMENT SYSTEM
Role of The Software Development Plan (SDP)
Herman Smith United Nations Statistics Division
Enhancing employers’ involvement in Social Protection policy debates
Agile Software Development
Division of powers between IA, SAI and FI
the Public Procurement Audit Practical Guide
of the Russian Federation
Accountability Issues in Proposal Writing
Module 8- Stages in the Evaluation Process
Nada Al Dosary Edited By: Maysoon AlDuwais
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT– WEEK 4 Mumtaz Ali Rajput +92 – 301-
USE OF PEMPAL KNOWLEDGE PRODUCTS
Software Analysis Tools
Accounts Chamber of the Russian Federation
And now the Framework WP4.
Presentation transcript:

Accounts Chamber of the Russian Federation Approaches to comprehensive project and program audit in the Accounts Chamber of the Russian Federation

Main problems for project implementations Incompleteness and inconsistency of information. Irrelevance and lack of coordination in management decisions. Poor resource management. 2

Information technology improvements in management and audit 3

Structure of this talk Methodology: –comprehensive audit; –architecture and capabilities evaluation; –scenario evaluation. Tools: –resource and schedule audit; –interval-based evaluations. 4

METHODOLOGY 5

The architecture of comprehensive audit 6

Indicators for comprehensive evaluation 7

The practice of comprehensive audit 8

Some approaches to activity management Classic project management. Business performance management (BPM). Architecture management. Capability management. Net-centricity. 9

The scheme of the methodical and IT infrastructure 10

Evaluating architecture Coherence of the architecture with the goals and budgets. Interaction of stakeholders. Cost of ownership. Dynamics of architectural change According to ANSI/IEEE : Architecture is the fundamental organization of a system embodied in its components*, their relationships to each other and to the environment, and the principles guiding its design and evolution * - information, financing, materials, products …..

Using the capabilities approach for a comprehensive evaluation of an information system 1212 Capability: property of a system, probability that the system will succeed in achieving the goal of its functioning. The correspondence between required and predicted state sets in the functioning of a system can be represented as the probability of the following binary predicate being true: predicted state set required state set

Methodical basis for comprehensive scenario evaluation 1313

TOOLS 14

Information technology for assessment of large projects 1515 Audit of programs and projects (software package)

Interval-based assessment of investment projects 1616

Estimating capabilities with an interval analysis system 1717

Capability indicator at a high level 1818

1919 The capability level requires detailed analysis

Capability indicator at a critically low level 20

Conclusion The application of these methods and tools will allow to formulate recommendations on: improving the feasibility of projects and programs, minimizing negative consequences of projects, reducing risks in project implementations, and generally improving efficiency of projects. 21

Questions?