【機密性2、機構内限り 】 Phase to start waste management Main RN OriginWaste typeWaste quantity Site/Operator/ Intention to carry out waste management Temporary Storage.

Slides:



Advertisements
Similar presentations
Lesson 3 Responding to Emergency Events. For additional information or questions please contact Toledo-Lucas County Health Department APC:
Advertisements

Development of WM strategy and implementation 1. Clarification of dominant nuclides and important characteristics of waste ( Cs only? with long-lived nuclides?
Solid Domestic Waste IB Syllabus 5.5.1, AP Syllabus Ch 21 Personal Waste Audit Trashed video.
International Atomic Energy Agency IX.4.3. Waste management.
1 RADIOACTIVE WASTE MANAGEMENT PART 2 A RAHMAN RWE NUKEM Ltd (UK) Name, company and chapter.
Progress on Offsite Cleanup Efforts in Japan Takeshi SEKIYA Ministry of the Environment, Japan 1 Senior Regulators’ Meeting at 56th IAEA General Conference,
Chapter 24 Solid and Hazardous Wastes
Chapter 24 Solid and Hazardous Waste
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
Exemption, Clearance, Discharges
1 RADIOACTIVE WASTE MANAGEMENT (PART 1) A RAHMAN RWE NUKEM Ltd (UK)
Regulation on Lead in Thailand Prasert Tapaneeyangkul Ministry of Industry.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
KOCKS INGENIEURE Case Studies for Options of Sustainable Sewage Sludge Disposal in China - Abstract and Conclusive Information - Dr. Weimin.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
STRAGEGY FOR ENHANCING SHARE OF NUCLEAR ENERGY – Ensuring Safety & viability S.S. Bajaj Chairman, AERB 6 th Nuclear Energy Conclave, New Delhi 14 Oct 2014.
Chapter # 1 Introduction To Pollution Prevention.
IAEA International Atomic Energy Agency CS-81 to prepare a work plan and material for developing a guidance on management of large amounts of radioactive.
Solid Waste are useless, unwanted or hazardous materials resulting from human activities Rubbish that may decompose e.g. food materials Non-decomposable.
IAEA International Atomic Energy Agency Consultants’ Meeting to develop a guidance document on management of large amounts of radioactive waste after an.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
Waste Management in PDO Corporate Environmental Advisor
Pollution Prevention and Minimization. Pollution Prevention Though an obvious concept, this has been one of the most difficult concepts to implement Congress.
Shore Reception Facilities
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Field Visit MODULE 8: Walkthrough of a Healthcare Waste Treatment Facility.
Disposal of Waste from Contaminated Areas around Fukushima RSLS meeting October 23,
Environmental Impacts of Nuclear Technologies - 2 Bill Menke, October 25, 2005.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
11 IAEA 56 th General Conference Senior Regulators’ meeting The French doctrine for the management of the Post-Accident Nuclear Situation André-Claude.
Some points on management of waste resulted from decontamination State agency on the Exclusion zone management L. Zinkevych Kiev June
,Yalta,17-th Symposium of AER1 IMPACT OF CHANGED FUEL PERFORMANCES ON SAFETY BARRIER EFFECTIVENESS AT NORMAL OPERATION OF NPP WITH VVER A.V.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Source Control Project, Phase I Chemical hazards Objectives  Development of the of risk assessment methodology based on the use of approaches of ISO
Source Control Phases I-II: Source Control Phases I-II: Main findings  Facility: drinking water and sewage treatment utility in Apatity, Murmansk region,
Centre for Radiation, Chemical and Environmental Hazards Radiation Protection Division formerly the National Radiological Protection Board Environmental.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
Program Objectives n Define “Decontamination”. n Identify the steps in the decon process. n Demonstrate, by building, a decontamination reduction zone.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
POLLUTION. WHAT IS POLLUTION??? Definition: Any changes in the environment which results in its harmful effect is called “Pollution” of the environment.
Waste treatment after a radiological accident Miliza Malmelin.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
CONSEQUENCE ASSESSMENT. Consequence Assessment Definition: The analysis, evaluation, and interpretation of available information associated with an actual.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Nuclear and radiological incidents – Introduction
Nuclear Power Plant How A Nuclear Reactor Works.
A Brief Overview of the Radioprotection Activities in the Joint Research Centre Ispra - Italy Nina JUDGE * and Francesco D’ALBERTI ** * Medical Service.
Solid Waste In the US 98.5% of the solid waste comes from mining, oil production, agriculture, sewage sludge, and industry The remaining 1.5% is municipal.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
Bellwork: 03/15/2011 What is “e-waste” and why is it a problem?
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
The material flow and indicators toward a sound material cycle society in Japan Keiko Omori Research Center for Advanced Policy Studies Institute of Economic.
Solid and Liquid Wastes PH 385 Environmental Health.
Introduction to Groundwater International Groundwater Resources Assessment Centre Dr Neno KukuricThessaloniki, 2008.
Exposure Modelling Day 1.
Program Objectives Define “Decontamination”.
Occupational Radiation Protection during High Exposure Operations
Resource Conservation and Recovery Act (RCRA)
Consultants’ Meeting to develop a guidance document on management of large amounts of radioactive waste after an emergency situation 04, Feb. – 08, Feb.
Srinivasa Reddy Mallampati,a* Yoshiharu Mitoma,b Cristian Simionc
Environmental Biotechnology
SFD in India Containment Emptying Transport Treatment Reuse/
Noteworthy points of environmental remediation work in Fukushima
Radioactive Waste Management in the Waste building H09
Radwaste: status & way forward
SOLID WASTE MANAGEMENT PRINCIPLES
Presentation transcript:

【機密性2、機構内限り 】 Phase to start waste management Main RN OriginWaste typeWaste quantity Site/Operator/ Intention to carry out waste management Temporary Storage PredisposalDisposal NPP Site Around buildings An early phase of an emergency exposure situation 1.Rubble (Concrete, Metal) 2.Logged wood 1.Approx. 54,000 m 3 2.Approx. 68,000 m 3 3.? NPP Site/ TEPCO/ Reduction of radiation dose to the worker, To secure a space of installation NPP Site/ TEPCO/ Reduction of worker’s radiation ?/?/To carry out decommissio ning Others1.EPP 2.Treatment equipment for contaminated water (Cesium adsorption vessel, Sludge etc.) the Exclusion Zone A late phase of an emergency exposure situation Cs-134 Cs-137 Sr-90 1.Conbustible waste 2. Incombustible waste 3. Soil 4.Others arising from decontamination work (Wood, Grass, etc.) the Exclusion Zone/ ?/ Reduction of radiation dose to the worker the Exclusion Zone/ ?/ Reduction of radiation dose to the worker and the public ?/?/National strategy??? Out of the Exclusion Zone An existing emergency exposure situation Cs-134 Cs-137 Target: >8,000 Bq/kg 1.Incineration ash 2.Wasted sludge (Domestic water) 3.Wasted sludge (Industrial water) 4.Sewage sludge 5.Agriculture and forestry waste Out of the Exclusion zone/?/Red uction of radiation dose to the public Out of the Exclusion zone/?/Natio nal strategy??? Fukushima NPS

【機密性2、機構内限り 】 Chernobyl TMI

【機密性2、機構内限り 】 Emergency preparednessAccident management phase Long term protective action NPP Site Around buildings Temporary storage Duration allowed adoption Predisposal For implementation during accident management phase Disposal the Exclusion ZoneTemporary storage Method for temporary storage Duration allowed adoption Predisposal Requirements of implementation in an emergency exposure situation and in an existing exposure situation Safety Case and Safety assessment Siting process Disposal Availability of disposal in an existing exposure situation Out of the Exclusion Zone Temporary storage Criteria of contaminated material which should be observed Handling method of contaminated material Duration allowed adoption Predisposal(Refer to implementation in an existing exposure situation of the exclusion zone) To adopt use of existing facilities for domestic and industrial waste Recycle/ reuse of material generated from an existing exposure situation Disposal To adopt use of existing facilities for domestic and industrial waste