PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Advertisements

PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
PHENIX WEEKLY PLANNING 9/6/2007 Don Lynch. 9/6/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upin progress.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
PHENIX WEEKLY PLANNING 4/19/2007 Don Lynch. 4/19/2007 Weekly Planning Meeting 2 Schedule MuTr FEE upgrade prototype 5/9/07 End of Run Party 6/29/07 Next.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 7/19/2007 Don Lynch. 7/19/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 8/9/2007 Don Lynch. 9/9/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch. 7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch

5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD East 7/19/07 Start Shutdown /2/07 [this space available] x/xx/xx MuTr FEE chip capacitor rmvl 6/6/07 ISO Audit5/21-25/07 MPC South remove for upgrade7/20/07 RPC Factory Safety Review5/18/07

5/24/2007 Weekly Planning Meeting 3 Yesterday’s Maintenance Day: May HyTec VTX vibration tests 2 locations tested, NW & SW lower HBD mtg bracket 3 tests NW with & w/o magnets on, SW w/o magnets ~90 hz largest resonance spike, but still small No detectable change with magnets on PC3-E FEM repair PbSc mainframe swap BBC daughter card repairs Ts5 ts server HBD capacitor decapitation test

5/24/2007 Weekly Planning Meeting 4 Next 2 Maintenance Days: May 23, June June 6?: MuTr Capacitor De-Capitations? HBD resistor adjustments? June 20?: No plans yet Get requests in early, especially if work permit required

5/24/2007 Weekly Planning Meeting 5 roll-up door services on this wall looking towards tent area RPC Factory looking towards storage & assembly areas

5/24/2007 Weekly Planning Meeting 6 CMS Factory is similar to our Tent Layout Cosmic Ray Test Stand Transport Table Assembly Table Staging Table

5/24/2007 Weekly Planning Meeting 7 RPC Assembly “Factory” at BNL

5/24/2007 Weekly Planning Meeting 8 Tent Layout

5/24/2007 Weekly Planning Meeting 9 Equipment Tent (Gap Testing, Module Assembly, Cosmic Ray Test), (existing from PHENIX PC w/ sealed lights and HEPA filters) 2 ~9000 btu/hr AC’s (portable or window type) 1 Gap Check Table ~5’ x 8.5’ 2 Staging Tables ~5’ x 8.5’ 2 optical Tables ~5’ x 8.5’ for module assembly HV/LV Crate & Electronics DAQ Table ~3.5’ x 5’ holds DAQ Computer, CAMMAC & NIM Crate 2 Cosmic Ray Test stands ~6’ x 9’ 1 Computer Desk for data analysis computer ~3’ x4’ 2 Phone/ethernet connections for DAQ and computer desks V duplex outlets on amp circuits (4-15 amp, 2-20 amp?) 1 Rolling transport table ~5’x8’ to move gaps & modules in tent & to storage ~ 4 chairs, 2 for each desk Book shelf

5/24/2007 Weekly Planning Meeting 10 Equipment Outside of Tent –Storage racks for gaps, modules, raw materials & fabricated frame details –Interior racks for test gases (near tent 2 R-134A, 1 SF6, 1 isopropane) –Half octant assembly table –½ ton-1 ton jib crane/A-Frame hoist for half octant ass’y area –Tech area: Desk & chairs Hardware & tool cabinets (lockable) Phone & internet (shared with tent computer) Book shelf File cabinet (lockable) Outside of Building 912 –Storage racks for spare and empy gas bottles –Area for N2 buggy Utilities –Electric, phone and internet –N2 gas lines from buggy to gap & module storage areas

5/24/2007 Weekly Planning Meeting 11 Equipment (Not in Layout) Security & Safety –Barriers (To Be Defined) –SF6/R134A detector Housekeeping & Misc. –Trash cans (2) –Water (Drinking) –Vacuum –Printer –Webcam (2?) –Weather station? –Portable ladder –Hand tools, portable electronic tools, etc.

5/24/2007 Weekly Planning Meeting 12 ISO Registration Audit This week… could still come to PHENIX Anyone on site may be interviewed by the reviewers including PHENIX visitors on BNL site. Safety: ISO Registration Audit 1. BNL has an ESSH policy (If you really want to be clever, know that ESSH is Environment, Safety, security and Health.). 2. Everyone is personally responsible for safety at BNL. ACTIVITY Define Work Identify Hazards Develop Controls Perform work within Authorizations Feedback and Improvement LABORATORY FACILITY

5/24/2007 Weekly Planning Meeting 13 Procedures Review Nothing New to report this week. Efforts will be continued this week 50 Active PHENIX procedures identified Subdivided into 3 groups: Gas System Procs(18)Rob to review Elect System Procs (19)Paul to review Mech System Procs (13)Don to review Determine if OK as is, needs rev./combine  system expert input

5/24/2007 Weekly Planning Meeting 14 JTA Review All training records gathered for PHENIX technical staff techs and engineers. Cannot change JTA’s yet because of inconsistencies in JTA’s and Equivalencies. Visual Basic/Excel program written to evaluate individual records This effort continues....

5/24/2007 Weekly Planning Meeting Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ? HBD West repair4/269/14 End of Run 76/296/29 EOR Party 6/296/29 Flammable Gas Purge6/297/2 Open Rolling Wall and Disassemble7/27/9 MuID collar removal, MMS move S.7/97/9 Disconnect EC and Move to AH7/107/16 RPC Engineers coordination visit7/167/26 Reconnect EC for maintenance in AH7/167/23 Move MuID collar to AH7/167/16 Install IR floor plates, rolling cart & move manlift to IR7/177/18 Install CM access ladder7/187/18 Remove HBD East7/197/19 Remove MPC South7/207/20 MPC South upgrade/ bench tests7/238/13 Move CM south7/237/23 Remove SouthEast Vertical Lampshade7/247/24 Remove MPC North7/257/30 MPC North upgrade/bench tests7/308/6

5/24/2007 Weekly Planning Meeting Summer Shutdown Schedule (cont’d) ItemStartComplete MuTr Capacitor Decapitation7/258/31 Reinstall MPC North8/68/13 Move CM North8/138/13 Reinstall MPC South8/138/20 Repair RXNP Phototube8/138/20 Install CM Crane8/209/3 Misc. Subsystem Maint./repair/Upgrade7/1610/1 Misc. Infrastructure Improvements7/1610/1 MuTr FEE Prototype (Sta. 2N lwr oct.)9/39/28 HBD West Mechanical/Gas Reinstall9/179/24 HBD EAST Mechanical/Gas Reinstall 9/2410/1 HBD Electrical Reinstall9/1710/8 EC Roll In10/810/10 DC East repair10/1110/12 HBD/MPC/Other TBD Commissioning10/110/31 Start of Run 811/111/1

5/24/2007 Weekly Planning Meeting 17 5 Year Plan 2007 HBD Repairs, DC (minor) repairs), MPC N&S upgrade,MuTr FEE upgrade prototype, infrastructure upgrades & repairs, misc. subsystem work 2008 MuTr FEE upgrades 1 octant 1&2 S, Cu absorber test, RPC3 S, infrastructure upgrades & repairs, misc. subsystem work 2009 Scaffolding in MMS and MMN, MuTr FEE N&S stn. 2 & 3, MuTr N&S stn. 2 & 3 repairs, RPC2 S&N, RPC3 N, Cu absorbers, infrastructure upgrades & repairs, misc. subsystem work 2010Remove HBD & RXNP, remove beampipe, DC West upgrade, VTX barrel, RPC1 N&S, MuTr FEE stn. 1 N&S, MuTr stn. 1 N&S repairs, infrastructure upgrades & repairs, misc. subsystem work 2011NCC S, FVTX, infrastructure upgrades & repairs, misc. subsystem work 2012NCC N, upgrades contingency & wishlist, infrastructure upgrades & repairs, misc. subsystem work * Years refer to the shutdown year and follow the run with the similar number (i.e. work in 2007 is to be done in the shutdown that follows run 7, and so on)

5/24/2007 Weekly Planning Meeting 18 Other Work Empty and discard old container VTX chiller test New Crane Stairway to HBD NCC Electronics CM Extension Step

5/24/2007 Weekly Planning Meeting 19 Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info Memorial Day Holiday Next Monday Remember to Remember