Organics Detection System Sites. Organics Detection System 14*/33 (42%) surface water DW facilities are ODS host site participants; 2 are industrial host.

Slides:



Advertisements
Similar presentations
Investigation of methodologies to control dust on county roads in western North Dakota.
Advertisements

Puyallup IT & Communications Puyallup Services and South Sound 911 TOPICS Summary – Current Direction of IT & Communications South Sound Updates Puyallup.
Oil Analysis Implementation Strategy J. Mike Weiksner BSME - Auburn University Years in Industry (EMO) Hold Certifications in Vibration & Oil.
Cheshire Elementary School Sanitary Sewer Improvements Preliminary Informational Meeting April 13, 2009.
The real cost of modernisation Phil Hoare Head of Customer Support.
Tribal School Air Toxics Monitoring: Nenahnezad Air Quality Control & Operating Permit Program May 23,2012.
Regulatory / WDR Update What’s Going On?. Waste Discharge Requirements Adapted by the State Water Resources Control Board on May 2, 2006 Adapted by the.
One powerful future. Maintenance Considerations for Emergency Power Systems Ben Thomas Customer Services Manager.
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
Pollution Prevention for Light Industry and the Service Industry P2 Ideas for Urban Environments.
Monitoring Water Quality Using ArcView GIS Lindsay Chischilly Mentor: Dr. Don Huggins Will Spotts Jeff Anderson Kansas Biological Survey Haskell Indian.
KELDRICK W. APRIL Power plant  Prevent blackouts by inspecting power plant equipment and ordering repairs when necessary What do they do?
Tymber Skan BCC Update Orange County Government January 27, 2015.
Radiological Health Advisory Board Meeting May 25, 2011.
Smart Monitoring © 2008 Applera Corporation and MDS Inc.
Identifying and Visiting Small Businesses for Water Pollution Prevention Presented by: Richard Hoiland - City of Vancouver, WA NAHMMA Conference – Tacoma.
Server Virtualization: Navy Network Operations Centers
Rogue Basin Water Quality Implementation Plans Greg Stabach, Natural Resources Project Manager Rogue Valley Council of Governments.
© ABB Oy 1 DOCPLCMODEL03 ABB ULMA / Web Imaging Systems lifecycle management model (LCM) March 2004.
By Anthony W. Hill & Course Technology1 Common End User Problems.
Environmental Energy Technologies Division The Heavy Oil Storage Tank (HOST) Project Donald Lucas David Littlejohn Ernest Orlando Lawrence Berkeley National.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Spills/Incident Management Monitoring, Mapping and Contingency Planning Jerry Schulte, Manager Source Water Protection and Emergency Response for ORSANCO.
Dr. Matt Helmers Assistant Professor and Extension Agricultural Engineer Dept. of Agricultural and Biosystems Engineering Iowa State University How is.
USGBC NY Upstate Chapter R333 Domestic Hot Water: Usage Research DHWUR Hugh Henderson March 22, 2014.
Radar stage sensors and other instrumentation issues from the ICOM (Instrumentation Committee) November 14, 2006 James Fallon Annual COE-NWS-USGS Mississippi.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
U.S. Department of the Interior U.S. Geological Survey Water-Quality Monitoring: Data Collection and Analysis Strategies for Designing Program.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
CPAC May 2005 John Mosher – Honeywell Sensing & Control Sensor Actuator Manager (SAM) Controller Considerations And Specification Identification.
Civil Service of MoD Currus in the Operational Area 29. May 2008.
Sales Objections and FAQs 920-LC Analytical Systems.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
OHIO RIVER MONITORING AND ASSESSMENT Program Overview.
The 900 series LC Analytical 920 LCSemi-Prep 940 LC.
Page 1 Town of Williamston Water Rates. Page 2 Page 3 Major New Costs Incurred Due to MCRWASA Plant Coming On Line Extra staff time: $10,000 (estimated)
2015 Monitoring Activities: Summer Water Quality Conditions Technical Committee Meeting October 6-7, 2015 Agenda Item #5.
Incident Command Tool for Protecting Drinking Water (ICWater) Doug Ryan USDA Forest Service Olympia, WA.
Imagination at work Enhanced inspection via real-time collaboration Michael Domke Product Line Manager GE Inspection Technologies A4A 2015.
Delaware’s Non-Tidal Monitoring Update for CY 2011 February 8,
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
1/16/2016The GC-in-a-PC 1 Pneumatic Focusing Gas Chromatography PFGC Robert O’Brien, Portland State Univ. & VOC Technologies The GC-in-a-PC Development.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Information Technology Service Availability Metrics March 2008.
Facilities Incident Notification. Reporting Requirements All employees are required to report immediately any incidents, accidents, or major equipment.
ORSANCO’s FY16 Technical Program. WQ Monitoring Programs Bimonthly & Clean Metals Sampling – Metals & traditional 15 mainstem, 14 tribs,
Source Water Protection Efforts Organics Detection System & Spill Notification Technical Committee Meeting, February 10-11, 2016 Covington, KY.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
1 Emergency Preparedness for Utilities Presented by: Chris Saunders Team Manager, Annapolis Sewer Service Area Anne Arundel County Bureau of Utilities.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Presentation to City Council January 28, Spill Summary January 9, 2014: At least 7500 gallons of an industrial chemical 4-Methylcyclohexanemethanol.
INLAND PRODUCTION FACILITIES CONTINGENCY PLAN REQUIREMENTS Risk and Hazard Analysis Resources at Risk ID 1.
Our certified technicians will diagnose hardware issues with your Toshiba computer/Laptop, troubleshoot your computers software and repair systems start.
Minor Irrigation (Stat.) Wing The Census of Minor Irrigation Schemes is conducted once in five years under the “Rationalization of Minor Irrigation Statistics.
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
Threat of Flooding in the Green River Valley Public Health and Medical Response Briefing Healthcare Coalition Quarterly Meeting August 17, 2010.
Request for Information (RFI) for the provision of a Turnkey Project for an Enhanced Unattended Transmission Substation CORP3430 Date: 4th March 2016.
Thomas M. Canty, P.E. J.M. Canty Inc. Buffalo, NY
INDUSTRIAL TROUBLESHOOTING Chapter 4
Small Sites Planning & Scheduling
Career JEOPARDY! Cluster: Information Technology
Expediting Document Delivery from Remote Storage
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Completion Report Summary
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
L&V Manpower Development Prepared by: HR department Mar, 2013
Operations Management
DIMETRA™ EXPRESS SYSTEM SERVICES
Youth Program Compliance
Presentation transcript:

Organics Detection System Sites

Organics Detection System 14*/33 (42%) surface water DW facilities are ODS host site participants; 2 are industrial host sites, and HQ (17 total locations). – *NKY Water can also analyze VOC’s upon request – Recently approached by Henderson to become involved with ODS program 3 conventional GC systems installed late 2014 AEP-St. Albans, Portsmouth, Paducah 2 GC/MSD systems installed: Wheeling & HQ 9 sites are running more than one sample/day – All sites will be running 4-6 samples per day by end of grant Pittsburgh to become active ODS site this fall 2015 with process GC capabilities (relocation of Wheeling unit) – Site inspection performed, lab modifications necessary by PWSA before installation can occur (Fall 2015) Old instrumentation donated to Thomas More Biological Field Station, NKY Water, UC Cincinnati, IL American (Cairo) and P&T parts to Metropolitan Sewer District

Organics Detection System 3 Laboratory renovations/relocations for ODS host sites; staff handled instrument relocation, start up and re-calibration – Additionally Staff installed “old” ODS systems at NKY Water & TMC Biology field station and provided training & start up ODS renovation started in 2009; components starting to show wear, minor repairs (so far) becoming more frequent, taking advantage of remote diagnosis and troubleshooting capabilities to reduce staff travel time. – Mother boards – Auto sampler (alignment, needles, incorrect volume draw, blocked flow path etc.) – Software issues

Organics Detection System ODS travel related repairs (non-warranty, non- maintenance agreement) – 30 hours computer related – 26.5 hours diagnose, non repairable (shipped to vendor) – 9 hours Autosampler related Anticipate more frequent repair trips as systems age – Only the GCMSD portion of instrumentation is covered by Maintenance Agreements

Organics Detection System Performance Operations

ODS Operational Summary Overall, ODS sites were unable to run daily river water samples 11.4% of the time. Leading causes of downtime (>1 day) were related to: – Staffing issues (6.3%) – Major laboratory renovations/ relocations (3.4%) – Instrument Failure (1.7%)

Organics Detection System Operations

Spills and Emergency Response Spill Reports: January 1 – August 31 Total Spills Received/Evaluated – 460 Impacting Ohio River – 164 Significant Spill Events CSX Bakken Crude Kanawha River Gavin Plant Fly Ash Release Big Run Creek/Big Sky Oil Spill Mycrocystis Greg Youngstrom Lila Ziolkowski Eben Hobbins Stacey Cochran Travis Luncan Jason Heath Ryan Argo Sam Dinkins Jeff Thomas Steve Braun Rob Tewes