Argo & New Telecom. Systems Technical Workshop Introduction and Summary. ADMT#11 October 2010, Hamburg/Germany.

Slides:



Advertisements
Similar presentations
Mercury Quality Center 9.0 Training Material
Advertisements

ADMT10 - Toulouse, 30 Sept 2009 ADMT9 Action 24 “Develop a common method for determining the positions and observation times at DACs”
DBCP Technical Workshop – Angra dos Reis, Brazil – October 20, 2003 ARGOS DOWNLINK Christian Ortega, CLS Bill Woodward, Service Argos.
Multi-Mode Survey Management An Approach to Addressing its Challenges
AIC Report Argo TC AST #8 Paris, IOC of UNESCO. 2 Argo Status 2804 Active Floats 2643 on GTS 2743 at GDACs 115 (258) on “grey list”
Groom-gliders data-management workshop Brest, December 2012 Groom gliders data management n In 2012 : vertical profiles from 26 platforms.
Argo Technologies Argo TC Inputs by S. Riser (UW) DBCP #22, Technical Workshop La Jolla, California.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Early Alert Notification System Sinclair Community College Elizabeth Price Post-Transition ILP & Early Alert Coordinator.
Online data collection A mixed blessing? Samuel C. Lefever Assistant Professor Iceland University of Education Ásrún Matthíasdóttir Assistant Professor.
How to Perform A Lessons Learned Session With Your Project Team
Introduction to the Secure SMTP Server service. Secure SMTP server is a secure, reliable SMTP mail relay server for your outgoing mail. Secure SMTP service.
10th Argo data management 2009 Toulouse User’s manual comment Here is a list of comments received on User’s manual version 2.2 since August 28 th. Jean-Philippe.
State of Indiana Business One Stop Process Storyboards To support RFP and Requirements As of September 13, 2013 Prepared by: RFP Attachment L.
Query Health Business Working Group Kick-Off September 8, 2011.
Partner Network Portal Anna Jones :: July 2006 Partner Training Webinar Communications Sector.
Data Communications and Networks
Argo Information Centre Report M. Belbeoch, Argo TC AST #11, San Diego, USA March 2009
Argo Information Centre Report M. Belbeoch, Argo TC ADMT #10, Toulouse, France September 2009.
Argo September 2004 The status of the Argo project What is Argo trying to do How is it doing it? What have we achieved so far? What has happened since.
Argo Status & issues for ADMT Argo TC ADMT#13 November 2012, Hyderabad.
Framework: ISA-95 WG We are here User cases Studies
Argo & AIC Development Argo TC DBCP #22 La Jolla, California.
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status Argo TC, M. Belbeoch.
JCOMM in-situ Observing Programme Support Centre SeaDataNet Technical Meeting II Paphos, Cyprus March 2012 Mathieu Belbeoch & Kelly Stroker.
Argo Status Argo TC AST#13 March 2012, Paris nations maintain the global array and 20 more fill regional gaps 18 countries active in 2011 (16 inactive)
What happens next? Ensure we know who you are – addresses for each member of each improvement team Register on the website Agree your own aims statement.
© 2014 cPrime Inc., All Rights Reserved JIRA User Essentials.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
Editing RT QC flag in delayed mode ? Virginie Thierry DMQC 4 Toulouse, 28 septembre 2009.
Website Workshop Emma Castro, Contents Questionnaire Results Handouts New Ideas.
Data Buoy Cooperation Panel Hester Viola
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
9° General Meeting Adriano Raspanti - WG5. 9° General MeetingAthens September Future plans CV-VerSUS project future plans COSI “The Score” new package.
Mail Attender for Exchange Technical Overview Presentation Introduction Sherpa Software Group Narrated by Thomas Hand Approximate Time 15 minutes.
EGO – COST - Groom-gliders Kiel meeting Kiel, June 2014 Data-management activity n Within Groom and with COST support, the glider data- management group.
Argos-3 Test program DBCP WorkshopLa Jolla - October 2006 Argos-3: Update and Test Program.
Status of Meta-Files, ADMT 13 Hyderabad, India Esmee van Wijk, Nov 2012 CSIRO Marine and Atmospheric Research, Australia Photo from Katy Hill.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
Text #ICANN51 GAC / GNSO Joint Meeting 12 October 2014.
Argo workshop in Ghana, December Argo data status & data access.
EGEE is a project funded by the European Union under contract IST EGEE NA3 Third parties roles and responsibilities Christos Aposkitis GRNET.
GGUS at PEB – –- page 1 LCG Klaus-Peter Mickel, GridKa Karlsruhe LCG-PEB-Meeting ( ) The Global Grid User Support Model (Report of GDB.
1 AARP Tax-Aide Prospective Volunteer Recruitment System Leadership Reports and VMIS Functionality 11/4/09.
Registration Solutions for your Event Management.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
An Introduction to the Argo Data Sytem South Pacific Workshop 11 – 14 October 2005 Mark Ignaszewski FNMOC.
The APEX Truncated Negative Pressure Drifts (TNPDs)
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
1 The Argo project 21st Century in-situ Ocean Observing System M. Belbeoch, Argo Technical Coordinator with inputs from D. Roemmich, Argo Steering Team.
Assessment activity 1.4 use IT to aid communications P5/P6.
Internet addresses By Toni Grey & Rashida Swan HTTP Stands for HyperText Transfer Protocol Is the underlying stateless protocol used by the World Wide.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
JCOMM Observation Programmes Support Centre – Argo Information Centre November 2014 Argo Status Argo TC, M. Belbeoch.
Advanced Tricks and Troubleshooting.  Introduction  Uploading File Bundles  DragonDrop Media Players  Embedded Media Player Sample HTML Code  Embedded.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Basel, September 2, 2008 Work Stream Summary define.xml/eSubmissions.
OceanSITES: New Perspectives Nathan Anderson. Overview Summary of the Documentation – Data Providers’ Guide* – How to participate in OceanSITES (recently.
Argo & Google Ocean.
On the use of the CRC for decoding Argo data
M. Belbéoch, 8 June 2018 Global Argo Status M. Belbéoch,
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Assess Survey Invitations
CIIMS Proposal for TOP-003 Approach
CLIENT RELATIONSHIP MANAGEMENT KEEPING TRACK OF REQUESTS THE EASY WAY
International Argo Data Management Team
Argo Information Centre & Argo Users
Presentation transcript:

Argo & New Telecom. Systems Technical Workshop Introduction and Summary. ADMT#11 October 2010, Hamburg/Germany

2 Workshop Objectives Need for an overview on the (heterogeneous) practices Users have gained enough experience to feedback Forum to: –share some of the knowledge –discuss the impacts on data processing chains and data formats –Discuss advantages/disadvantages, problems, plans, etc –encourage a broader use of the new systems –report back to the AST Long run objectives: Rational (raw) formats management Reduce data management costs Harmonize practices Set up a task team (within the AST) to follow up.

3 Status, as of September 2010

4

5 350 Iridium floats deployed so far

6 Status, as of September 2010 APEX –Start in 2005 –# profiles available (users interest) –102 Cycles per Float (CPF) –82% efficiency –Max age= 1902 days –Dep. failure rate: 4%

7 Status, as of September 2010 SOLO –~70 floats WHOI –High deployment failure rate in the early years PROVOR/ARVOR –16 Provor (14 Bio Argo, 2 IFM) –3 Arvor (France & Italy) –~100 CPF –Dep. failure rate 0% –POPS: JAMSTEC NEMO –10 JAMSTEC & Eq., 2 AWI, 1 POLAND –84 CPF, 100 PPF –Dep. failure rate 1%

8 Real-time tracking by the AIC/JCOMMOPS Existing: Argos/Argos-3: database link with CLS (oracle-oracle) Iridium: AOML.phy files (CLS-A), CLS DB, GTS, GDACs, manual Need: Real-time, impartial, at the air-time provider level. Advantage: rigorous and transparent Argo status (reliability stats.) can track float that do not distribute data (or forgotten by their PI) can detect floats back on line, beached floats, … floats for which data distribution was stopped. can track new float users and invite them to join Argo, share data … (or not!) Solutions: SBD (copy the AIC as one of the 5 addresses) Copy/Download of RUDICS.msg directly on AIC’s FTP Synchronization with central Iridium data services (CLS, Joubeh, ?)

9 Argo & New Telecom. Systems Workshop Summary Workshop was a good initiative. Information need to circulate further. Most of Argo groups are experimenting Iridium or planning to First Argos-3 float will be deployed next month Good overview on practices that can be compiled (mission/data flow) Sampling requirements were discussed. potential bias on the array if mission parameters become too heterogeneous (using downlink or interactively). Possibility to compress the.msg files in dialup/RUDICS to decrease air- time cost could be requested to manufacturer(s). difficulties for some users on dialup (multiple connections required => increase cost dramatically). Decrease the number of levels, or use a “kill cmd” might help reduce costs Users need help to choose between the 3 telecom. methods available: SBD (binary) or dialup/CSD/RUDICs (txt).

10 Workshop Summary Concerns with the long run archival of raw data. DAC duty. Difficulties to fill up meta files properly with mission parameters. Mission conf. changes should be transmitted by floats when possible. Need of recommendations for reducing the number of sampling levels for TESAC (until we switch to BUFR). Suggestion to use some standard Argo vocabulary in.msg file (not possible in.sbd) and in manufacturers Users’ manual. AIC needs a cc of.sbd messages (reserve an address for the AIC) Possible “reserved block” for AIC use in iridium.sbd messages. Harmonization? AIC needs access (FTP) dialup/RUDICS raw.msg files (via dl./upl.) ftp.jcommops.org user=iridium / pw=argofolks ftp.jcommops.org AIC Notification: TELECOM_ID IMEI for SBD / Board# for Dialup/RUDICS (and for netCDF PTT …)

11 Workshop Summary Suggestion to run another workshop aside of the AST Suggestion to set up a Task Team to work on data formats and see where harmonization is possible and, where recommendations can be made to Argo groups and manufacturers, in order to, strengthen the Argo core mission, reduce data management costs and, allow flexibility for the future. Short Term Actions TC to prepare the summary for the ADMT Report TC put all talks on the AIC website TC to compile the workshop report (and circulate it before final distribution)

12 Actions Items Make recommendations regarding netCDF file. Update Manual. Make recommendations regarding TESAC levels compression. Update Manual. DACs are recalled to make sure to archive all raw data (Iridium) AST to make recommendations regarding sampling scheme (China/India to send their sampling details). All Argo Programmes to cc AIC on iridium data (.sbd,.msg)  To work ad hoc. Discuss the workshop outcomes and potential follow up within the AST. (Agenda item for AST#12 and why not another workshop)