SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.

Slides:



Advertisements
Similar presentations
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Advertisements

16 November 2006 CARE06 Annual Meeting INFN-LNF 1 Proposal for a SCRF infrastructure at CERN W. Weingarten with S. Calatroni, R. Losito, J. Tückmantel,
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
EuCARD Task 10.4 Sergio Calatroni. Sub-task New and improved techniques for the production of Nb sputtered Quarter Wave (QW) cavities (CERN, INFN-LNL)
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
14 March 2007O. Napoly, at ESGARD1 Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems (SRF-AS) Preparatory Group.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
19 March 2007Preparation of FP7 bid1 A General Purpose Infrastructure at CERN for R&D and Test of Superconducting Radio-Frequency Cavities and Cryo-Modules.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
21 November 2006Meeting DESY on SCRF Infrastructure1 Proposal for a SCRF infrastructure at CERN W. Weingarten with S. Calatroni, R. Losito, J. Tückmantel,
J.P.Delahaye GDE Meeting OXFORD CERN participation to ILC ILC- MoU: Support to GDE Contribution to GDE: J.L.Baldy: Civil Engineering & Conventional.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
31 October 2007CARE'071 Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems (SRF-AS) Preparatory Group: Olivier.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
Proton Driver Initiatives
New Cavity Techniques and Future Prospects
Uppsala Commitment to ESS and FREIA Planning
Peng Sha Institute of High Energy Physics, CAS
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Accelerator Research and Innovation for European Science and Society
Hosting Orsay Walid KAABI
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
ESS RF Development at Uppsala University
Wolfgang Weingarten - CERN
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Introduction to Jefferson Lab
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Olivier Napoly, coordinator CEA/Irfu
Presentation transcript:

SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G. Müller, R. Seviour, S. Tazzari, A. Ustinov Proposed acronym: Superconducting RF Test Collaboration = SuRFTeC ESGARD-OMIA-meeting-CERN1 11 Sep 2007

OUTLINE ESGARD-OMIA-meeting-CERN2 Main Objectives of facility Collaboration of Participating Laboratories and Institutes Focus of equipment available in SRF test collaboration Proposed investment in central and complementary infrastructures Items proposed for testing in Central Infrastructure Conclusion and outlook 11 Sep 2007

Main Objectives of facility ESGARD-OMIA-meeting-CERN3 11-Sep-2007 Setting up for European accelerator users a multi-purpose state-of-the art network of installations for R&D and test of superconducting radio-frequency cavities and cryo-modules; this network will be:  organized as a collaboration consisting of a basic central infrastructure hosted at CERN and complemented by specific equipment elsewhere;  operated in shared responsibility between the host laboratories for the (recurrent) non-project specific running costs and the user collaborations for the (ad-hoc) specific project costs; with the aim of  providing an infrastructure for the maintenance and tests of SRF cavities of existing facilities and the development of SRF cavities for new facilities,  pushing the SRF technology performance limits,  training a new generation of accelerator experts in the field of SRF, and  facilitating a continuous technology transfer to industry. 3ESGARD-OMIA-meeting-CERN

Main Objectives of facility (2) This proposal provides a necessary test bed for CERN projects and other projects elsewhere in Europe using SRF technology. The SRF infrastructure therefore complements these projects, some of which request financial support within the FP7 program:  The development and test of SRF cavities and other components for the Superconducting Proton Linac SPL to upgrade and partially replace the injector chain for the LHC (CERN);  The validation by RF power tests of the cryo-module prototypes for the proposed International Linear Collider ILC (DESY and associated institutes);  The RF tests of the quarter wave cavities to be used for post acceleration of the radioactive ions for a future EURISOL facility (CERN and associated institutes);  The identification of field emission sites on technical surfaces as used for SRF cavities (Universität Wuppertal);  The development of niobium thin films by alternative methods other than sputter coating and their validation under RF exposure at low temperature (INFN Roma 2);  The development of a laser scanning microscope for identifying defects under RF exposure at low temperatures (Universität Erlangen/Nürnberg). 4ESGARD-OMIA-meeting-CERN11 Sep 2007

Main Objectives of facility (3) Other projects under consideration based on the SRF technology and planned to use the SRF test infrastructure as backup, are the following: The planned Free Electron Laser STARS (BESSY); The 4 th generation light source using an Energy Recovery Linac and prototyping cavities for a future neutrino factory (Cockroft Institute); The SPIRAL-2 at GANIL heavy ion accelerator, the SOLEIL synchrotron light source, and the proton linac for Accelerator Driven Systems ADS (Supratech consortium). 5ESGARD-OMIA-meeting-CERN11 Sep 2007

Collaboration of Participating Laboratories and Institutes ESGARD-OMIA-meeting-CERN6 11-Sep ESGARD-OMIA-meeting-CERN

Focus of equipment available in SRF test collaboration ESGARD-OMIA-meeting-CERN7 11-Sep ESGARD-OMIA-meeting-CERN

Focus of equipment available in SRF test collaboration (2) ESGARD-OMIA-meeting-CERN8 11-Sep ESGARD-OMIA-meeting-CERN

Proposed investment in central and complementary infrastructures ESGARD-OMIA-meeting-CERN9 11-Sep-2007 Technical work packages at central infrastructure Work package 1 (CERN-AB-RF):  managerial and technical coordination matters. Work package 2 (CERN-AB-RF):  RF testing activities in SM18, both at room temperature and low temperature  extension of bunkers,  acquisition of low and high power equipment at various frequencies,  re-cabling of cryostats regarding the RF tests, including temperature mapping;  RF characterization of samples and cavities  assembly and cleaning operations of ancillary equipment (SM18 and B. 252). Work package 3 (CERN-AT-ACR):  cryogenic refurbishment, re-cabling of cryostats regarding the cryogenic operation,  extension of the infrastructure to continuous operation at 2 K (SM18). Work package 4 (CERN-TS-MME):  surface polishing and cleaning activities (B. 118);  coating activities (B. 252);  characterization of samples by DC methods. 9ESGARD-OMIA-meeting-CERN

Proposed investment in central and complementary infrastructures (2) ESGARD-OMIA-meeting-CERN10 11-Sep-2007 Technical work packages at complementary infrastructures Work package 5 (BESSY):  RF testing at room and low temperatures, down to 1.8 K, and low and high RF power of a the fundamental and 3rd harmonic system for the linac composed of TESLA like cavities at 1.3 GHz (HOBICAT). Work package 6 (CI):  design, construction and commissioning of a 1.3 GHz host cavity to qualify samples made from niobium and other superconducting materials suitable for SCRF application. Work packages (three partners of Supratech):  preparation and upgrade of a diversified and large turn-over test infrastructure for, among others, SPL type cavities at 700 MHz;  coupler test and window coating station for various frequencies;  Upgrade of electropolishing and chemical polishing stations;  Proviion of1400 ºC UHV furnace (optional additional equipment). Work package 10 (TUD):  UHV furnace (hot zone 2.1 m high with 0.17 m diameter; up to 1900 °C with p < mbar) ;  Vertical test cryostat (useful cold volume of 2.2 m depth and 0.35 m diameter, T > 1.8 K);  Equipment for cleaning and assembling the cavities as well as for their rf - controls is provided and maintained. 10ESGARD-OMIA-meeting-CERN

Proposed investment in central and complementary infrastructures (3) ESGARD-OMIA-meeting-CERN11 11-Sep-2007 Criteria: The classification into core and additional activities is in line with the CERN Council strategy document (Lisbon 2006); Duplication was avoided (vacuum furnaces, electropolishing equipment etc.); Equipment needed to increase test throughput was not retained (4 th vertical cryostat at CERN, etc.); General purpose and equipment not directly linked with SRF tests and R&D was not retained (civil engineering work, network analyzer, RGA, 3 GHz photoinjector etc.). 11ESGARD-OMIA-meeting-CERN

Proposed investment in central and complementary infrastructures (4) ESGARD-OMIA-meeting-CERN12 11-Sep-2007 Direct costs, but no travel and consumables included Numbers are tentative 12ESGARD-OMIA-meeting-CERN

Items proposed for testing in central infrastructure ESGARD-OMIA-meeting-CERN13 11-Sep ESGARD-OMIA-meeting-CERN

11 Sep 2007ESGARD-OMIA-meeting-CERN14 CERN SM18 Preparation area next to clean room – bunkers in the background

Conclusion and Outlook The proposal described the purpose, organisation, and necessary investment needed for a the refurbishment/upgrade of a network of installations in Europe for R&D and test of superconducting radio-frequency cavities and cryo-modules:  Non exhaustive list of collaboration partners open to others  Shared responsibility of host laboratory for the recurrent operation and the users for the specific project equipment and test  Equipment for purchase or upgrade was identified (core / additional activities)  Preliminary cost estimate was provided but needs to be revisited  Test objects for central infrastructure were identified Remaining items for FP7:  Collecting the financial commitment of some partner laboratories 15ESGARD-OMIA-meeting-CERN11 Sep 2007