V. Kulipanov3 IRSF, LondonApril 16, 2008 1 BESP settlement system Recent developments and progress report 3 IRSF, London, April 16, 2008.

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

The development of the payment system in Bulgaria and SEPA preparation
Multibanking.
MICEX Settlement House as settlement services provider.
Presented By : Sreedhar V. An end to end integrated solution with an ERP platform of Microsoft Dynamics NAVISION o A single platform that provides overall.
NBFC Application  The Application covers the following areas:  Credit Department  Settlement Department  Accounts Department  Risk.
ELECTRONIC FUNDS TRANSFER FINANCIAL INFORMATION SYSTEMS.
Straight Through Processing (STP) Development Concept & Roadmap Indonesian Central Securities Depository (KSEI) Indonesian Central Counterparty (KPEI)
Anticipated changes in BESP system of CBR Vladimir Kulipanov 10 th IRSF, MICEX, Moscow November 1, 2011.
CONSUMER BANKING SYSTEM. PURPOSE STATEMENT  The purpose of our project is to provide fast and safe analysis of sales data of banks by the state bank.
BESP SYSTEM Main features and recent statistics Vladimir Kulipanov 7 th IRSF, ICAP, London April 14, 2010.
MICEX FX market : current conditions and prospects Igor Marich, Vice-president, MICEX Ruble Forum 2009 Moscow, 10/11/2009.
Federal Public Service FINANCE TAXES AND TAX COLLECTION Administration of Recovery 1 Accountancy aspects of the EURO changeover at the Ministry of Finance.
13th SAARC Payments Council Meeting July 29 Thimpu, Bhutan Latest Payment System Development / measures For SPC Objectives Presented By : Nepal Rastra.
Using BESP today Sergey Romanchuk, Head Of FX&MM SCB Metallinvestbank, President ACI Russia. 9 th Russian Ruble Settlement Forum, London,
Upay User Guide
Upay User Guide WELCOME TO UPAY This guide aims to help you use the upay website. You will receive a welcome from Wolfson College.
Model Bank Testing Accelerators “Ready-to-use” test scenarios to reduce effort, time and money.
National Clearing Centre National Clearing Centre 2008.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
London 16Apr08National Foreign Exchange Association, Russia 1 NFEA view on RUB settlements for foreign banks Dmitry Piskulov, Ph.D. (Econ.) Chairman of.
A participants view of BESP Sergey Romanchuk, Deputy Head Of Treasury SCB Metallinvestbank, President ACI Russia. 7 th Russian Ruble Settlement Forum,
Structure and Basic Methodology of Preparation and Taking of the Russian Agricultural Census 2016 Deputy Head of Rosstat Dr. Konstantin Laykam FEDERAL.
1 BANK OF ALBANIA AECH PROJECT. 2 Introduction What is AECH? ACH System Components AECH Project Implementation Plan AECH Activities & Responsibilities.
Bolshakov Mikhail London, 9th IRSF April 12, 2011 BESP (Russian RTGS) implementation: up-to-date state and development perspectives.
Anticipated changes in Russian National payment system Vladimir Kulipanov, CBR London, 15 th IRSF May 13, 2014.
Developments concerning the Community Plant Variety Office of the European Union (CPVO) online application system Meeting on the development of a prototype.
Payments in Russia: the background for revisal
MICEX SH & NDC – on the way to merge By: Sergey A. Sukhinin Chairman of the Board Executive, CEO MICEX Settlement House.
Sarah Medlar Relationship Manager CLS Services Istanbul 3 October 2003
Best Practices FX Business. Pre-trade preparation and documentation.
® ® CLS and the CLS Logo are registered trademarks of CLS UK Intermediate Holdings Ltd © 2012 CLS UK Intermediate Holdings Ltd. CLS and.
Monitoring Information System Greece Working Group Meeting Brussels, June 2000 STRUCTURAL FUNDS
New sources – administrative registers Genovefa RUŽIĆ.
IMPLEMENTATION OF ACTION PLAN FOR SUMMARY CPV REGULATION & IMPLEMENTATION Using of CPV codes became mandatory in Europe from December 16, 2003.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
ACSDA International Seminar Johannesburg, South Africa November 19-21,2003 Centralized X Decentralized Systems Amarílis Prado Sardenberg Amarílis Prado.
SPI Project: Technical and regulatory requirements for improving clearing and settlement of checks, drafts and promissory notes Regulatory Impact Assessment.
Progress in implementation of Real Time Gross Settlements System (RTGS) «BESP» Vladimir Kulipanov 6 th IRSF, Moscow November 10, 2009.
V. Kulipanov5 IRSF, London, Apr 28, BESP payment system Recent developments and progress report Central Bank of Russian Federation 5 IRSF, London,
DEPOSITORY MODEL AND ISSUER SERVICES PROVIDED BY KSEI Dhaka, July 3, 2009.
Upay User Guide WELCOME TO UPAY This guide is aimed to help you to use the Upay website. To launch Upay you will need to navigate to
Warsaw, 17 June 2013 Introduction of Securities Netting to Cash Market Trade Clearing.
M-PEDD Technical Working Group
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. Confidential – Oracle Internal 1.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. 1 Confidential – Oracle Internal.
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. 1 Confidential – Oracle Internal.
The Consolidation Process The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the course on the.
State Cadastral Registration in the Russian Federation:
Targeting of Cash balance on the single treasury account
Enron North America Corp. Back-office Systems
Payment and Settlement Systems in India - Recent Major Developments
UIF ANNUAL REPORT 2005/06 PRESENTATION TO THE PORTFOLIO COMMITTEE
Accelerator Pack FCUBS 12.3
Exchange of News Session Albanian Treasury System
The Consolidation Process The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the course on the.
Rouble settlements for international banks
Managing cash flows and balances at the Single Treasury Account
Accelerator Pack FCUBS
Accelerator Pack FCUBS 12.4
Order-to-Cash (Project-Based Services) Scenario Overview
Accelerator Pack FCUBS
Payment & Settlement System Developments
Order-to-Cash (Project-Based Services) Scenario Overview
PAYMENT SYSTEM IN NEPAL
The Unified Central Securities Depository
Accelerator Pack FCUBS
WORKING PARTY ON NATIONAL ACCOUNTS Paris, 4-6 November 2009
Accelerator Pack FCUBS
Presentation transcript:

V. Kulipanov3 IRSF, LondonApril 16, BESP settlement system Recent developments and progress report 3 IRSF, London, April 16, 2008

V. Kulipanov3 IRSF, LondonApril 16, General characteristic of BESP Voluntary participation; Gradual introduction; Real Time Gross Settlement system; Some liquidity saving features, generally attributed to Net Settlement systems; Centralization at the federal level.

V. Kulipanov3 IRSF, LondonApril 16, Information on the Web The relevant information about BESP settlement system, applicable regulations and statistics will be available in the “English” part of Internet site in mid May

V. Kulipanov3 IRSF, LondonApril 16, Options of membership Special participation Direct participation Associated participation

V. Kulipanov3 IRSF, LondonApril 16, Options of membership Special participation Direct participation Associated participation CBR Head Office BESP system CBR Branches

V. Kulipanov3 IRSF, LondonApril 16, Options of membership Special participation Direct participation Associated participation CBR Head Office BESP system CBR Branches Bank DSP

V. Kulipanov3 IRSF, LondonApril 16, Options of membership Special participation Direct participation Associated participation CBR Head Office BESP system CBR Branches Bank DSP Bank ASP Non-bank ASP

V. Kulipanov3 IRSF, LondonApril 16, UFEBM BESP CBR Transport system DS P AS P DS P AS P DSP SWIFT transport SSP Conversion SWIFT formats UFEBM V – scheme Transport

V. Kulipanov3 IRSF, LondonApril 16, Functions of Central Bank in BESP Regulator and oversight authority OperatorUser

V. Kulipanov3 IRSF, LondonApril 16, Time schedule Until BESP was implemented Interregional Settlement System Up to 2 days

V. Kulipanov3 IRSF, LondonApril 16, Time schedule After implementation of BESP Core of BESP system System runs in Real time Unified Schedule for all time zones

V. Kulipanov3 IRSF, LondonApril 16, Three phases of BESP business day Preliminary phase Regular phase Final phase

V. Kulipanov3 IRSF, LondonApril 16, Preliminary phase Updating regulatory and reference information; Registration /exclusion/ temporary suspension of BESP participants; Initial liquidity setting in BESP by DSP Setting (multilateral, bilateral, etc) limits to benefit from liquidity saving mechanism

V. Kulipanov3 IRSF, LondonApril 16, Regular phase Payment acceptance and processing; Queue maintenance and management; Information exchange with BESP participants; Liquidity management by DSP; Temporary suspension/release of DSP participation by CBR.

V. Kulipanov3 IRSF, LondonApril 16, Final phase Daily completion of BESP settlement; Generation and transmission of statements and reports to BESP participants; Generation and transmission of output report to the General Ledger; Information archiving.

V. Kulipanov3 IRSF, LondonApril 16, Views on DSP liquidity Entire liquidity of DSP Available line of overdraft credit Account balance Total liquidity Liquidity for BESP Liquidity for Local PS Acc+OvdrftBESP+LocalPS

V. Kulipanov3 IRSF, LondonApril 16, Liquidity bridge between BESP and Local payment system Liquidity in BESP Liquidity in Local PS

V. Kulipanov3 IRSF, LondonApril 16, Liquidity in BESP Liquidity in Local PS Liquidity bridge between BESP and Local payment system

V. Kulipanov3 IRSF, LondonApril 16, Single transaction Business process Technical checks. Logical checks. Liquidity sufficiency check (Queue). Payment settled. Finality and irrevocability. Synchronization request from BESP system to accounting systems. Debit/Credit confirmation.

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments This payment will be processed first This payment will be processed only after all time-critical payments are settled This payment will be processed last This payment will be settled before any ordinary payment is processed

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Set-off

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Set-off

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Set-off

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Set-off

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Set-off

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Optimization

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Optimization

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Optimization

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Optimization

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Optimization

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Optimization

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Optimization

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP Ordinary payments Time-critical payments Optimization

V. Kulipanov3 IRSF, LondonApril 16, Queuing in BESP At the end of day all payments in queues are automatically cancelled !

V. Kulipanov3 IRSF, LondonApril 16, Information services for DSP Results of processing of the recently input document; Debit/Credit confirmation based on the recently input document Final daily statement Without request On request Correspondent account balance; BESP Liquidity statement; Total overnight line of credit, and it’s available value; Aggregated value of incoming payment orders in the queues of other DSP Banks Liquidity statement for affiliates Intraday statement … and some other minor issues…

V. Kulipanov3 IRSF, LondonApril 16, New business opportunities that were enabled by BESP Extension and unification of business day schedule throughout entire territory of the country, which result in acceleration of payments, stop discrimination of banks on “the geographical” basis; Concentration of liquidity flows over nostro accounts of Direct participants, who may now provide their fast payment services to non- member banks.

V. Kulipanov3 IRSF, LondonApril 16, Joining BESP membership How to apply. Where to apply. Requirements to be met by applicant. Terms of expected reply. Necessity of pilot run. Self-evaluation act for security recommendations of CBR. Terminal of DSP. Functionality and integration. Available STP features.

V. Kulipanov3 IRSF, LondonApril 16, BESP tariffs 25 RUR per ordinary payment 30 RUR per time-critical payment Applicable to Direct Settlement Participants Applicable to Associated Settlement Participants 20 RUR per payment

V. Kulipanov3 IRSF, LondonApril 16, Pattern of Contracts Bank DSP Amendments to Banking Account Contract Amendments to Technical interfaces Contract

V. Kulipanov3 IRSF, LondonApril 16, Launch Date of BESP July 1, All regulated documents were adopted and became effective by that date. Technical preparations were finished. The first participants were in. The system started, however there were no payments until… December 21, 2007 The first few payments came through.

V. Kulipanov3 IRSF, LondonApril 16, BESP in figures Quantity of Direct, Associated and Special participants.

V. Kulipanov3 IRSF, LondonApril 16, BESP in figures Volume and total Value of payments.

V. Kulipanov3 IRSF, LondonApril 16,

V. Kulipanov3 IRSF, LondonApril 16, BESP in figures Comparison of active participants to their total quantity

V. Kulipanov3 IRSF, LondonApril 16, BESP in figures The average daily value of liquidity in the system was 92 mln. RUR The average processing time of single transaction is 30 seconds.

V. Kulipanov3 IRSF, LondonApril 16, BESP Pilot Run BESP Pilot Run continues even after the system itself was successfully launched on Dec 21, The reason is to provide testing facilities to new prospective BESP participants. BESP Pilot Run provides entire collection of BESP services, that are available in the real system. BESP Pilot Run is performed in the real-time manner, where the prospective participants experience liquidity control mechanisms, Limits control mechanisms, Queuing control mechanisms, and, of cause, try sending and revoking their payment instructions.

V. Kulipanov3 IRSF, LondonApril 16, By the date April 11, 2008 BESP Pilot Run was covering 55 regions of Russian federation, located in 11 time zones. The overall amount of registered participants totals to 698, including: D.S.P.S.S.P. A.S.P. Banks others BESP Pilot Run

V. Kulipanov3 IRSF, LondonApril 16, The future possible participants MICEX Settlement House and National Clearing Centre to join BESP; Anticipating for SBERBANK to come during 2008; Estimates for Critical quantity of members to join BESP.

V. Kulipanov3 IRSF, LondonApril 16, The future possible participants from top 30 Citibank Zenit Transcreditbank Russian Standard Promsvyazbank Micex Settlement House Petrocommerce Raiffeisenbank Uralsib Already BESP members Gasprombank Pilot run completed CBR consent received

V. Kulipanov3 IRSF, LondonApril 16, What’s next? anticipated and discussed steps Extending the schedule to enable almost non-stop operations during the business week. Introduction of obligatory membership in BESP for banks; Introduction of Max cap of payment for local Payment Systems when every bank joins the BESP system; Tariff policy encouraging the use of BESP.

V. Kulipanov3 IRSF, LondonApril 16, Thank you for attention! Questions welcome!