1 Status of receivers related activities Damien Prieur University of Pittsburgh 12/01/2010L1Calo Joint Meeting - Heidelberg.

Slides:



Advertisements
Similar presentations
Alice EMCAL meeting, July EMCAL jet trigger status Olivier BOURRION LPSC, Grenoble.
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Pascal PERRODO, ATLAS-LAPP
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
SCT Analyses on Cosmics. Efficiency 2 methods –Online- quick/biased -> located in SCT_Monitoring –Offline- slow/unbiased In agreement with each other.
ATLAS Liquid Argon Calorimeters Geneva Group Alain BLONDEL Arno STRAESSNER Ahmed ABDELALIM Daniel LA MARRA Eric PERRIN Gabriel PELLERITI Gilbert VIOLLAT.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
LAr Response to pions: Data vs MC S.Paganis (Wisconsin) with Isabelle Winterger,Martin Aleksa LAr Week CTB Meeting, CERN, 10-May-2005.
Introduction Construction, Integration and commissioning on the surface Installation and commissioning after installation in the cavern Selected performance.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
L1Calo Intro Cambridge Group, Dec 2008 Norman Gee.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Alan Watson Atlas Trigger Workshop, Amsterdam, 18-22/10/10 1 Calibration of L1Calo L1Calo Calibration Overview L1Calo Calibration Overview Calibration.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
Reflections of a System Run Coordinator Or Equivalent! Bruce M Barnett STFC, Rutherford Appleton Laboratory L1Calo Collaboration Meeting January.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
DØ Algorithms Meeting April 6, Leslie Groer, Columbia Univ Ursula Bassler, LPNHE, ParisCalorimeter Online Software Status 1  Examines  Crate Unpacking.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
L1Calo EM Efficiencies Hardeep Bansil University of Birmingham L1Calo Joint Meeting, Stockholm 29/06/2011.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
Matteo Volpi, Luca Fiorini Timing study with Muons at 90º from first beam PRELIMINARY STUDY (Barcelona) 1 Tile Timing Group meeting 17 September 2008.
The ATLAS Liquid Argon Calorimeter: Overview and Performance Huaqiao ZHANG (CPPM) On behalf of the ATLAS Liquid Argon Calorimeter Group.
4 Dec., 2001 Software Week Data flow in the LArG Reconstruction software chain Updated status for various reconstruction algorithm LAr Converters and miscellaneous.
Check of Calibration Hits in the Atlas simulation. Assignment of DM energy to CaloCluster. G.Pospelov Budker Institute of Nuclear Physics, Novosibirsk,
1 Dead material correction status. Alexei Maslennikov, Guennadi Pospelov. Bratislava/Kosice/MPI Calorimeter Meeting. 8-December Problems with DM.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
L1Calo Databases ● Overview ● Recent Activitity ● To Do List ● Run types Murrough Landon 4 June 2007.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Rainer Stamen, Norman Gee
Monitoring of L1Calo EM Efficiencies
Calorimeter Status Electronics Installation and Commissioning
Online Database Work Overview Work needed for OKS database
Calibration Status Energy Calibration Stabilities/instabilities
Performance of jets algorithms in ATLAS
on behalf of ATLAS LAr Endcap Group
L1Calo Requirements on the DPS
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Online Software Status
Online Software Status
Online SW, DB & Calibration
Remaining Online SW Tasks
Level 1 (Calo) Databases
Cabling Lengths and Timing
Presentation transcript:

1 Status of receivers related activities Damien Prieur University of Pittsburgh 12/01/2010L1Calo Joint Meeting - Heidelberg

12/01/2010L1Calo Joint Meeting - Heidelberg 2 Receivers Software

Overhaul of L1GainDb & UsbController packages Improved USB communication Database access implemented Larg_L1MON_A & Larg_L1MON_C segments enabled Right on time before beam ! Thanks to Murrough L., Fatih B. & Henric W. Have to be moved out of the LArg segment (Tile/L1Calo calibration runs) 12/01/2010L1Calo Joint Meeting - Heidelberg 3 Rx Gains - Online Software Receivers Strategy Defines the set of receiver gains to be loaded Selection through dropdown list in L1Calo panel Must be set before CONFIG step ! Controller communication issues Few USB communication errors observed ~1% Not critical, have to re-config the concerned segment

12/01/2010L1Calo Joint Meeting - Heidelberg 4 Rx Gains – Database Structure Oracle INTR server Store conditions before start of run Strategy, final gains, DACs & status Factor folders 8192 channels/factors per folder Define Strategies One strategy = set of factor folders Selected on L1Calo panel Gains from different folders are factorized (per channel)

12/01/2010L1Calo Joint Meeting - Heidelberg 5 E T Calibration

12/01/2010L1Calo Joint Meeting - Heidelberg 6 E T Calibration LArg/L1Calo energy scans Match L1Calo to LArg offline energy Use calibration OFCs Corrections for high voltage, dead channels Correction for disabled FEBs, dead OTX HAD Gains produced in time for beam Thanks to Veit Scharf & Antoine Marzin EMB, EMEC, HEC, Tile EM

12/01/2010L1Calo Joint Meeting - Heidelberg 7 No calibration for FCAL yet Technical issues to reconstruct LArg energy Problematic towers Few towers with non-optimal calibration Sick TBB EMB/EMEC overlap region All trigger cable installed Have to determine correct length E T Calibration HAD EM

12/01/2010L1Calo Joint Meeting - Heidelberg 8 Splashes Correlation plot from Huaqiao Zhang 3% bias for EMB and EMEC To be investigated TBB delays not appropriate Set to calibration instead of physics Few % deviation

12/01/2010L1Calo Joint Meeting - Heidelberg 9 B/EC Overlap Region

12/01/2010L1Calo Joint Meeting - Heidelberg 10 Overlap cabling Barrel Receiver EMEC Receiver EMB Overlap ‘octopus’ cable 37-pin to 4 x 9-pin connectors EMEC Overlap VGA + ‘E’ connector EMB & EMEC overlap channels summed at the receivers level

12/01/2010L1Calo Joint Meeting - Heidelberg 11 ‘E’ connectors EMB Crate EMEC Crate Breakout box Bill Cleland Pittsburgh 4 x 4-pair cables 1 x 16-pair cable Overlap cabling All cables installed Cables prod. & inst. Michel Mathieu Andrei Akimov

EMB EMEC pair A-Side 12/01/ L1Calo Joint Meeting - Heidelberg Overlap timing from beam-splash events Octopus cables 5S & 1S were in place Set receiver gains to alternate the EMB/EMEC signal components vs phi connector 20

A-Side C-Side EMEC EMB EMEC EMB phi 13 TT to TT timing raisonnable for EMB Unexpected offset between EMB & EMEC… 50 ns 63 ns Overlap timing from beam-splash events Cables longer than nominal values To be on the safe side ~10-15 ns Non nominal TBB delays ~3-6 ns Bug in length calculations ~20 ns Still ns to be understood PS rise time ≠ energy fraction [bc] EMEC EMB EMEC EMB 12/01/2010L1Calo Joint Meeting - Heidelberg

12/01/2010L1Calo Joint Meeting - Heidelberg 14 Calibration delays set until first collisions Determined from single-layer phos4 runs Then moved to physics delays Based on calibration delays + LAr tool to get physics/calib. time difference Tower Builder Boards delays Back layer is the culprit Most probably bug in calibration cable length used to compute phys/calib difference eta=0.15 (0x ): eta=0.05 (0x00100c01): Ps Fr Md Bk Central towers not timed Caused by physics delays

12/01/2010L1Calo Joint Meeting - Heidelberg 15 TBB delays database, Paolo working on it Understand physics delays at eta=0 Barrel/End Cap overlap region Have to accumulate data to check/compute timing Understand discrepancies wrt computed values Ongoing work