Maite Barroso – WP4 Barcelona – 13/05/2003 - n° 1 -WP4 Barcelona- Closure Maite Barroso 13/05/2003

Slides:



Advertisements
Similar presentations
GridPP7 – June 30 – July 2, 2003 – Fabric monitoring– n° 1 Fabric monitoring for LCG-1 in the CERN Computer Center Jan van Eldik CERN-IT/FIO/SM 7 th GridPP.
Advertisements

CERN – BT – 01/07/ Cern Fabric Management -Hardware and State Bill Tomlin GridPP 7 th Collaboration Meeting June/July 2003.
Project Management Summary Castor Development Team Castor Readiness Review – June 2006 German Cancio, Giuseppe Lo Presti, Sebastien Ponce CERN / IT.
Panel A4 Summary WP4: short deadline for first deliverables; cannot expect the final product to look the same WP4: how to guarantee that a fabric node.
19/06/2002WP4 Workshop - CERN WP4 - Monitoring Progress report
DataGrid is a project funded by the European Union CHEP 2003 – March 2003 – Towards automation of computing fabrics... – n° 1 Towards automation.
German Cancio – WP4 developments Partner Logo WP4-install plans WP6 meeting, Paris project conference
DataGrid is a project funded by the European Union 22 September 2003 – n° 1 EDG WP4 Fabric Management: Fabric Monitoring and Fault Tolerance
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
ASIS et le projet EU DataGrid (EDG) Germán Cancio IT/FIO.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
NGOP J.Fromm K.Genser T.Levshina M.Mengel V.Podstavkov.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
WP4-install task report WP4 workshop Barcelona project conference 5/03 German Cancio.
EGEE is a project funded by the European Union under contract IST Quattor Installation of Grid Software C. Loomis (LAL-Orsay) GDB (CERN) Sept.
7/2/2003Supervision & Monitoring section1 Supervision & Monitoring Organization and work plan Olof Bärring.
1 Linux in the Computer Center at CERN Zeuthen Thorsten Kleinwort CERN-IT.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
Cluster Reliability Project ISIS Vanderbilt University.
EDG WP4: installation task LSCCW/HEPiX hands-on, NIKHEF 5/03 German Cancio CERN IT/FIO
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Scalable Systems Software Center Resource Management and Accounting Working Group Face-to-Face Meeting October 10-11, 2002.
Partner Logo DataGRID WP4 - Fabric Management Status HEPiX 2002, Catania / IT, , Jan Iven Role and.
Olof Bärring – WP4 summary- 4/9/ n° 1 Partner Logo WP4 report Plans for testbed 2
Configuration Database MICE Collaboration Meeting 28, Sofia David Forrest University of Glasgow Antony Wilson Science and Technology Facilities Council.
May PEM status report. O.Bärring 1 PEM status report Large-Scale Cluster Computing Workshop FNAL, May Olof Bärring, CERN.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
1 MassChallenge Technology Review MassChallenge Technology Review (April July 2011) MassChallenge Web Technology Review April July 2011 Johnny.
1 The new Fabric Management Tools in Production at CERN Thorsten Kleinwort for CERN IT/FIO HEPiX Autumn 2003 Triumf Vancouver Monday, October 20, 2003.
German Cancio – WP4 developments Partner Logo System Management: Node Configuration & Software Package Management
Deployment work at CERN: installation and configuration tasks WP4 workshop Barcelona project conference 5/03 German Cancio CERN IT/FIO.
20-May-2003HEPiX Amsterdam EDG Fabric Management on Solaris G. Cancio Melia, L. Cons, Ph. Defert, I. Reguero, J. Pelegrin, P. Poznanski, C. Ungil Presented.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
Lemon Monitoring Miroslav Siket, German Cancio, David Front, Maciej Stepniewski CERN-IT/FIO-FS LCG Operations Workshop Bologna, May 2005.
Installing, running, and maintaining large Linux Clusters at CERN Thorsten Kleinwort CERN-IT/FIO CHEP
May http://cern.ch/hep-proj-grid-fabric1 EU DataGrid WP4 Large-Scale Cluster Computing Workshop FNAL, May Olof Bärring, CERN.
Olof Bärring – WP4 summary- 4/9/ n° 1 Partner Logo WP4 report Plans for testbed 2 [Including slides prepared by Lex Holt.]
Managing the CERN LHC Tier0/Tier1 centre Status and Plans March 27 th 2003 CERN.ch.
Lemon Monitoring Presented by Bill Tomlin CERN-IT/FIO/FD WLCG-OSG-EGEE Operations Workshop CERN, June 2006.
EU 2nd Year Review – Feb – WP4 demo – n° 1 WP4 demonstration Fabric Monitoring and Fault Tolerance Sylvain Chapeland Lord Hess.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Olof Bärring – EDG WP4 status&plans- 22/10/ n° 1 Partner Logo EDG WP4 (fabric mgmt): status&plans Large Cluster.
German Cancio – WP4 developments Partner Logo WP4-install progress CERN, 19/6/2002 for WP4-install.
Maite Barroso - 10/05/01 - n° 1 WP4 PM9 Deliverable Presentation: Interim Installation System Configuration Management Prototype
David Foster LCG Project 12-March-02 Fabric Automation The Challenge of LHC Scale Fabrics LHC Computing Grid Workshop David Foster 12 th March 2002.
ATLAS Distributed Analysis Dietrich Liko IT/GD. Overview  Some problems trying to analyze Rome data on the grid Basics Metadata Data  Activities AMI.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
IBM Express Runtime Quick Start Workshop © 2007 IBM Corporation Deploying a Solution.
INFSO-RI Enabling Grids for E-sciencE Ganga 4 Technical Overview Jakub T. Moscicki, CERN.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
Copyright © 2004 R2AD, LLC Submitted to GGF ACS Working Group for GGF-16 R2AD, LLC Distributing Software Life Cycles Join the ACS Team GGF-16, Athens R2AD,
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Update on Status of Fabric Global Schema Maite Barroso 10/12/2002
Partner Logo Olof Bärring, WP4 workshop 10/12/ n° 1 (My) Vision of where we are going WP4 workshop, 10/12/2002 Olof Bärring.
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Developers’ Guide Maite Barroso 10/12/2002
CERN - IT Department CH-1211 Genève 23 Switzerland t Service Level & Responsibilities Dirk Düllmann LCG 3D Database Workshop September,
QA process for Business Catalyst projects.. Starting a project What QA needs to start testing::  Specifications – A detailed description of the product,
Lemon Tutorial Quattor and Non-Quattor Configuration of the lemon-agent Miroslav Siket, Dennis Waldron CERN-IT/FIO-FD.
Hepix EDG Fabric Monitoring tutorial – n° 1 Introduction to EDG Fabric Monitoring Sylvain Chapeland.
WP4 meeting Heidelberg - Sept 26, 2003 Jan van Eldik - CERN IT/FIO
DataGrid Quality Assurance
Monitoring and Fault Tolerance
Status of Fabric Management at CERN
WP4 Fabric Management 3rd EU Review Maite Barroso - CERN
LEMON – Monitoring in the CERN Computer Centre
WP4-install status update
German Cancio CERN IT .quattro architecture German Cancio CERN IT.
Leanne Guy EGEE JRA1 Test Team Manager
Towards automation of computing fabrics using tools from the fabric management workpackage of the EU DataGrid project Maite Barroso Lopez (WP4)
The Problem ~6,000 PCs Another ~1,000 boxes But! Affected by:
Presentation transcript:

Maite Barroso – WP4 Barcelona – 13/05/ n° 1 -WP4 Barcelona- Closure Maite Barroso 13/05/2003

Maite Barroso – WP4 Barcelona - 13/05/ n° 2 Olof vision vs reality today Did Olof’s vision become reality? NOTE: components not finished yet are marked in red.

Maite Barroso – WP4 Barcelona - 13/05/ n° 3 Configuration today Node profile Configuration Database Node profile Configuration Database Abra-cadabra Hocus-pocus HLDL template CDB API PAN Cache Node profile NVA API PC

Maite Barroso – WP4 Barcelona - 13/05/ n° 4 Monitoring today Monitoring repository Agent Repository server Repository API Transport SQL DB Alarm GUI PC Node profile Sensor Monitoring Component

Maite Barroso – WP4 Barcelona - 13/05/ n° 5 Fault tolerance today Fault Tolerance Rule Editor Correlation Engine Rule HLDL Node profile Monitoring API PC CDB Job scheduling Actuator FT Component ???

Maite Barroso – WP4 Barcelona - 13/05/ n° 6 Installation&Maintenance today PC RPM Software repository RPM Cache Node profile Component NCM SPM Component SPM rpmtpkgt??

Maite Barroso – WP4 Barcelona - 13/05/ n° 7 Resource mgmt today Job scheduling Scheduler Runtime Control PBS Admin API LSF RMS Component Node profile Monitoring??

Maite Barroso – WP4 Barcelona - 13/05/ n° 8 Summary Good progress made in all the tasks since last workshop. Very good integration, support and response to bugs. CONGRATULATIONS! Testing plans. Keep on updating them regularly Priorities for coming months: 1)Continue support of released components 2)Finish developments and LCFGng components 3)Testing (use WP4 nodes), documentation 4)Prepare integration 5)Translate configuration and components to use the new configuration and installation framework

Maite Barroso – WP4 Barcelona - 13/05/ n° 9 DISCUSSION: What happens to EDG software after the lifetime of EDG? u GOAL: finding a single strategy that can be deployed independently of whether related projects (EGEE, LCG) will take over EDG software or not u EDG license allows anybody to use EDG software and further develop it as long as EDG is appropriately credited. This model allows other projects to take over EDG software u There was consensus that no separate body should be put in place to continue branding EDG. u PROPOSAL: to make EDG software publicly available in well known software repositories such as sourceforge. u EDG license guarantees source code distribution and re-use, EDG design can only be protected by patenting. It is too late for this.