Leonardo Rossi – ATLAS plenary- Stockholm 10/07/061 Inner Detector: highlights and concerns  A lot of progress on SCT & TRT integration.  Pixel production.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
M. Gilchriese Pixel Update October 3, M. Gilchriese 2 Outline Barrel status and repair strategy Revised ATLAS installation schedule Finishing pixel.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
A two-stage system for the future cooling system.
`` ATLAS inner detector JV Els KoffemanAtlas - Inner Detector1 Tracking in solenoid 2 Tesla field – 3 pixel layers with 50 um x 400 um cells – 4.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
MICE Spectrometer Solenoids Step IV running
EC: 7 DISK concept Preliminary considerations
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
Services Layout – Update
Radiation Laboratory Meeting
ScECAL+AHCAL+TCMT Combined Beam FNAL
Presentation transcript:

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/061 Inner Detector: highlights and concerns  A lot of progress on SCT & TRT integration.  Pixel production and disk integration is well advanced. Barrel integration suffers from low mass cables cracks.  Services installation has greatly improved but still on critical path.  Concerns in Feb06. and now: TRT  SCT  Pixel  Stave cooling pipe corrosion IDGEN  Service installation TRT  SCT  Pixel  Low mass (type0) Al cable cracks IDGEN  Service installation

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/062 ID Barrel integration Barrel SCT Barrel TRT  Went smoothly (1mm clearance), then connecting all services took ~5 weeks (~1/8 TRT (=9 RODs) and 1/4 SCT (=12 RODs)) + ~2w to check and adjust all and bring to life.  Very important test to verify the delicate connection process and the overall operation (up to data taking and analysis of cosmics run)

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/063 Aim of the combined test in SR1  The operational aspects:  Gain experience with detector operation  Test combined detector supply systems  Development of standalone & combined monitoring tools  Commission and test combined readout and trigger  Commission offline SW chain with real data  The detector performance aspects:  TRT performance with SCT inserted and powered  Test 4 SCT barrels together and operation with TRT  Checks of grounding for SCT and TRT  Test synchronous operation and check for X-talk and noise  Collect cosmics for efficiency, alignment & tracking studies

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/064  TRT & SCT see cosmics, they work together without any noise increase  ~450k cosmic events taken (livetime 57%)  Efficiencies as expected, but for cabling error in 2 modules Few highlights (details in Maria Costa talk tomorrow)

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/065 A hic-up  During the combined test, on May 3 rd, we had a failure of the liquid cooling for the TRT electronics while running unattended. TRT DCS failed to switch off the upper TRT sector Power Supplies after a “missing coolant” alert  the temperature on some on-detector read-out chips went up to 120C for hours.  One wire broke  Luckily no other degradation of performance has been observed after restoring normal conditions (indeed the results shown are obtained after this incident). But the effects could have been much worse.  We then went through a review process, see: to evaluate changes and precautions to avoid similar incidents to happen again and we are now implementing the recommendations of the reviewers (including overheat interlock).

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/066 ID Barrel installation in the pit  Now ID Barrel is already un-cabled and should be ready for pit installation on August 14  Installation coordinators have been named (Apsimon for SCT and Romaniouk for TRT). They have defined a detailed set of Work Packages for installation, connections and sanity checks up to the acceptance sign-off.  The installation process can only begin when all the services for the ID barrel will be tested and the pipes also cleaned. It foresees 5w for the TRT (connect and test) followed by 11w for the SCT, including 2w at the end for final tests (enough? sign-off means EC will be installed and then Barrel inaccessibility for long…).  Prior to the ID Barrel installation there will be a full transport + insertion test (from SR1 to cryostat) to be done with a dummy load on a transport trolley similar to the one to be used for IDB.  Plus the solenoidal B-field measurement

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/067 Inner cryostat equipped with services  Waiting for the ID Barrel, services have been installed. This is now quite advanced (3/4 done) and the work inside the cryostat is expected to ~end by mid July (when B-field measurement should begin)  Other activities not needing access to cryostat bore (e.g. pipe connection to racks) will continue.  Artwork done under enormous schedule pressure

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/068 Pipework from Z=0 to racks  ~1200 pipes (~5000 connections, most crimping plus 800 welds)  Must increase the speed to meet IDB installation (end August) 300 pipes in 20 days 14/7 9/8 9/9

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/069 Solenoidal B-field measurement (see W. Kozanecki talk)  Has to be done before ID Barrel installation, 2w (last of July+1 st of August) and interferes with services installation.  Machine ready and installed in parking position inside cryostat.

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0610 Evaporative cooling system  Just one (maybe the most complex) of the ancillary systems necessary to operate ID Barrel (and later EC and Pixel). Main cooling plant and control PLC Heater control Heater power supplies USA.L2 Heater power supplies US.L2 Distribution racks x 4 US15 USA15UX15 platforms On-detector loops capillaries and HEX’s heaters Loop-Back

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0611  Loop-back tests are foreseen in the cryostat prior to ID Barrel installation to verify (+clean) the circuits.

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0612 Liquid 16Bar Vapour 2Bar Heater loads x 5 TE bulkhead  Loop-back tests are foreseen in the cryostat prior to ID Barrel installation to verify (+clean) the circuits. 5 full circuits with heat loads (mimicking detector), simplified for all (clean + test).

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0613 EC integration - SCT  ECC arrived at CERN on Feb 23 and completed acceptance tests on March 24 (500 points visual inspected, continuity tests, leak tests,…)  Cont. tests found 50 new disconnects due to unplug at the Temporary Interconnect, which required repair (now partially done).  April 10 moved on cantilever tool and during May it was fixed into its “integration” position

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0614  June: the Inner Thermal Enclosure was inserted (min clearance 2mm) sealed and grounded  Then the front membranes were added (separate sheets for gas and grounding)  Tests from mid-July to Aug 4 th then integration with TRT begins and plan to be ready for combined tests from early September to early November  RFI: beginning of December

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0615  ECA arrived at CERN on Apr 21 st and completed acceptance tests including all disk running cold on June 22 nd

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0616  Number of dead channels remains constant and at the 0.2% level (typical value for both Barrel and EC SCT).  VCSEL failure is not negligible, 4% of the modules is readout through the redundant scheme (1 link out of 2 working). This number is stable  Integration steps of ECA follows ECC with ~1 month delay (now getting shorter).

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0617 TRT EC  ECC Harnesses installed and under testing. Active gas and cooling running. Faraday shields installed, CO2 safety valves in place. 0.5% dead channels.  Moved to ID trolley  First tests with self trigger allows to see cosmics, complete SCT & TRT test will follow from September

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0618  ECA FE electronics installed and tested. Active gas leak tightness OK, single cooling circuits leak tested: OK, 0.3% bad channels.  HV tests ~OK  problems with 2 wheel sectors, repair once on integration trolley  Integration with SCT should follow (for both TRT EC) according to SCT schedule.  ECC combined test in SR1 test area, ECA will follow N.B.: 1 broken fuse found for EC A after ~1 year (out of 15000);  replaced

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0619 Pixel progress  The Pixel End Cap integration is proceeding well.  PixelECC at CERN and passed the acceptance (leak check and connectivity) tests. Dead channels at few per mille level.  PixelECA ready for transport. Still need some repair at CERN (problems with 3 modules)  We are preparing for cosmic tests with PECC to:  test whole DAQ chain  commission a lot of service SW, from DCS to heavy usage of CondDB and survey data.  and offline SW (detector description, track reconstruction,...)

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0620  In practice

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0621 Barrel progress  Module production is done  IZM part finished with 97% yield after rework  AMS part should end in a couple of weeks with ~90% yield  1744 modules are needed and we’ll have ~2300 good bare modules. This allows to produce more staves to minimize # of “inserted”.  Stave cooling pipe corrosion has been solved using three paths  Change the pipe (for staves not yet loaded with modules)  Insert a smaller pipe (for already loaded stave)  Build new staves (to compensate for losses in the above)  all progressing well

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0622 Stave loading  61 staves with the new pipe already loaded, 25 still to go (should end in September).  35 of the 42 staves already loaded have now inserted pipe and 13 are qualified (the rest is ongoing, a couple of staves have been “lost”) 2.7 Staves/Week 4.5 Staves/Week  Strategy is to have mixed bi-staves in Layer2 (less cooling needed after irradiation) and non-inserted elsewhere. Therefore only 26 “inserted” are needed (and extra modules become necessary).

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0623  Also creating a pool of the “best 30 staves” to be devoted to the B- layer (=22 staves) which is more critical for precise vertexing.  Barrel integration started in late April and 2 bi-staves were loaded on their support frame (for layer 2).  Tests showed that two low mass (Al) cable were broken, this stopped integration and started investigations on the possible causes.

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0624 The low mass (or type0) cable problem  The barrel Al cables are made of 100  m wire for signal and 300  m for power (21 wires in a bundle), both wire-bonded on a small printed board + mini connector (~1m, module  PP0).  The initial interpretation was that the cable was stressed during manipulation and strain relief and better practice should solve the problem.  Visual inspection and electrical tests after stress on all production started and found that ~50% of the 2000 cable produced are bad or likely to evolve bad.  Indeed the insulation was found to have cracks and, being the insulator much stronger than a 100  m Al wire, any stress would concentrate on the wire thus breaking it (sooner or later), this is not true for the thicker power wires.

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0625  The statistics of the faults is:  Green = good  Yellow = broken insulation but only on 1 or 2 power wires  Red = broken insulation on signal wires  Black = electrical failure  Then the initial interpretation true but partial: some cables are already damaged in the production process (that’s why we did not see with home made prototypes...). Unfortunately our QA did not spot early this problem.  The problem shows-up just after a heat shrink (example) Al shines through insulator crack

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0626  Last week visit to firm in Taiwan of our experts analyzed production process and found ways of reproducing the problem  Wires are bent and then immersed in 400C NaOH for stripping.  Excessive bend and high T can damage the insulator  New production process should give 50 cables this week and then 130/w (1000 cables to produce ~ 2 months).  After analysis of the 50 cables we’ll already know if the problem is solved, but we’ll continue detailed QA (including visual inspection, which is very manpower consuming)

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0627  We already restarted integration of bi-staves last week with the green+yellow cable set and we are now back to the mid-April time frame…  i.e. we have lost ~3 mo in the already critical barrel integration process.  We’ll than have a TC review on July 18 (chair A. Clark) to:  Evaluate if the technical solutions are ok  Evaluate what can be done to speed-up the schedule (without risk)  Once the work packages will be defined there may be a call for help to non-pixel groups in case this is deemed necessary to meet the April 2007 installation date (preliminary analysis indicate there is no time for pixel installation in the 2008 shut down).

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0628 Some about software: New Tracking progress with v.12 σ(1/p T ) σ(d0) sinΘ x σ(z0) Resolutions as a function of |  | (single , 100 GeV/c): New Tracking improvement from to

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0629 NewTracking now at level of other trackers  Total multiplicity per event (P>1 GeV): xkalmaniPatRecnewTracking  Primary track efficiency / fake rate : xkalmaniPatRecnewTracking Barrel98% / 4.1%98% / 0.4%98% / 0.3% Transition99% / 5.2%99% / 0.3%99% / 0.9% Forward98% / 4.2%99% / 1.6%98% / 1.9%  Number of hits per track Pixel/SCT/TRT : xkalmaniPatRecnewTracking Barrel 2.75/8.07/ /7.92/ /8.06/26.83 Transition 2.80/8.08/ /7.90/ /8.00/23.92 Forward 3.03/8.68/ /8.31/ /8.57/12.78

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0630 Conclusions  ID is progressing well toward integration and installation, but the next weeks and months are very critical as we have a very condensed installation schedule.  The ID barrel installation will be a major milestone as it should also include bringing to life and safely operate complex ancillary systems (evaporative cooling, PS system, gas systems) which have not been commissioned yet. The experience in SR1 is positive, but problems cannot be excluded.  Pixel Barrel has a schedule risk that we are trying to minimize

Leonardo Rossi – ATLAS plenary- Stockholm 10/07/0631  ….but we finally hope to succeed…  …and keep the ATLAS logo high