SLS-RFM WG deadlock over 2.4.18 NASA’s position –Rec. 2.4.18 has a number of critical flaws including a logical dependence upon an SFCG recommendation.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

WRC-12 Agenda Item 1.7 ICAO WG-F Mexico City April 2010.
Data Rate Nomenclature We should agree upon a common scheme for describing the various data rates in a system that works for optical communication – In.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.10 – Allocation requirements of safety systems of ships and ports Presenter: Peter Pokorny.
10-Dec-2012-cesg-1 SLS-OPT: Optical Communications Working Group (1 of 6) Problem and Issues: None. However, schedule for standards publication is very.
November SLS RFM and RNG REPORT 18 November 2004.
Direct Sequence Spread Spectrum. Spread Spectrum Spread power of signal over larger than necessary bandwidth in order to: 1. Reduce interference by signal.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
Doc.: IEEE /0104r0 Submission July 2010 Alex Reznik, et. al. (InterDigital)Slide 1 Channel Selection Support in TVWS Date: Authors:
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand István Bozsóki Head of Division BDT/IEE/SBD 1.
Proposed revision of ITU-R Recommendation providing EESS (active) Performance and Interference Criteria May 13, 2015 Committee On Radio Frequencies Thomas.
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
1 16 June 2006 Space Link Services Area report to CESG Rome, Italy, 16 June 2006 J.L. Gerner / G. Moury.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
ESA Report to CMC ESA / ESTEC, 5th November 2009 Mario Merri (deputising JFK / NPESA CCSDS Delegate)
CCSDS P1A/B Meeting - Frascati - Nov 8, Gilles Moury, Guy Lesthievent - 1 Proposal to P1A & P1B Increasing allowed frame lengths and interleaving.
CCSDS Security WG meeting October 2008, hosted by DLR at DIN premises (Berlin) 1 Data Link Security BOF An ESA contribution on Lessons Learned and Issues/Questions.
NGU Proposed revision of recommendation CCSDS (401-B-20) on TC bit rate NGU WG Fall CCSDS Meeting - London UK - Oct 25, 2010.
SFCG Report to CEOS Frequency Protection for EO Satellites 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 Novenber 2009.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP University of Bologna ITALY ESA – European Space Agency ESOC - European.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
1 THE GOES N GENERATION SATELLTES April 27, 2004 Peter Woolner, Mitretek Systems.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Brainstorming for Future WWG Activities 1.High data rate wireless Blue Book (Start 2012) –PHY and MAC, star topology; we offer a set of recommendations.
Doc.: IEEE /00144r0 Submission 3/01 Nada Golmie, NISTSlide 1 IEEE P Working Group for Wireless Personal Area Networks Dialog with FCC Nada.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
April Space Link Services AREA REPORT 15 April 2005.
Doc.: IEEE /??r0 TG4a PresentationSlide 0 Ultra Wideband in Europe The final few regulatory processes May 2006.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Frequency Management Office 1 The Space Frequency Coordination Group (SFCG) ESF WorkshopCagliari, 29 October, 2004.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
Evaluation Criteria and Traffic Models Status Update Farooq Khan IEEE Interim Meeting Garden Grove, CA, USA May 10-13, 2004.
Agreement concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch.
Angelo Vian President of FEPAC Washington, D.C., U.S.A. – May 10-11, 2007 Biennial Meeting International Lending Agencies and Consulting Industry – BIMILACI.
Transfer of Standards To Inactive Status John Lemon.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Agenda item 1.16 VHF data exchange system (VDES).
Agenda Item: 1.12 Title: Extension of current worldwide allocation to the Earth exploration–satellite (active) service in the frequency band 9300– 9900.
SLS-RFM WG deadlock over
Fall CCSDS Meeting - London UK - Oct 25, 2010
Progress report by the Chair of the informal group on REC
SLS AREA REPORT Goal: Next Generation Uplink WG
Informal document GRE Rev.1
Considerations for LDPC codes selection
DESIGN OF A SPECIFIC CDMA SYSTEM FOR AIR TRAFFIC CONTROL APPLICATIONS
Spectral Control Issues for TGg
Update of ARIB Activities on IMT Standardization
Status Report on Usage of TV White Space in Japan
IEEE Working Group on Mobile Broadband Wireless Access
Interoperable NGV PHY Improvements
Adult Education Survey Anonymisation Point 6
INMARSAT > CTO> RMA
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Compliance for statistics
Presentation transcript:

SLS-RFM WG deadlock over NASA’s position –Rec has a number of critical flaws including a logical dependence upon an SFCG recommendation (on maximum occupied bandwidth) which does not and may never exist –NASA agreed to adopt with the proviso that Rec would be adopted pursuant to footnote 4; Rec would have included conventional modulations, and therefore in the absence of Rec current rec is null, void, and without force or effect –The changes proposed for by CNES to correct these flaws are not editorial in nature and should not be approved without agency review –Agreement reached at 2001 meeting at Pasadena called for introducing filtered OQPSK as a recommended modulation for the general case for the MHz band in Rec –Subsequent discussions at Paris and College Park meetings modified this proposal to include also GMSK and 4D-8PSK TCM for the general case –NASA’s interpretation of Rec as currently phrased is that it has no applicability because it is conditioned upon a non-existing SFCG recommendation

SLS-RFM WG deadlock over CNES’s position (1)  Referring to CCSDS procedure manual §3.2.3 concerning CCSDS Recommended Standards (Blue Book), "A CCSDS Recommended Standard must be reconfirmed or updated every five years, or it shall be retired to "CCSDS Historic" status". The Rec has been published in June 2001 and by this fact should not be deeply modified till June So only editorial changes have to be discussed in May 2004 meeting.  CNES considers that the modifications proposed by other agencies to correct "critical flaws" are not editorial in nature.  CNES position on Rec has then changed as far as there is still the ambiguity of when applying Rec or Rec for MHz band use.  The work of SFCG concerning the use of MHz band is still in process. The strict channelization noted in CCSDS rec may not be recommended. But the provisional SFCG Rec14-3R5 recommends in point 6 "that bandwidth efficient modulation and coding techniques be used in accordance with CCSDS Rec (401)2.4.18, taking also into account SFCG Rec21-2 regarding adjacent channel interference". So we can then note that SFCG encourages the use of 4D-8PSK-TCM.

SLS-RFM WG deadlock over CNES’s position (2) –  Adding filtered OQPSK and GMSK as proposed by the other agencies will correspond to a backward or at the best a static process in the sense of the use of more bandwidth efficient modulations as far as those scheme are far less efficient than the actual recommended one and no real power gain (more than 2 dB) can be offered by this techniques even when associated with sophisticated coding schemes. –  The new ESA proposition to add SCCC-8PSK to Rec has to be done according the CCSDS new procedure : measurements on equipments (or mockup) have to be presented to agencies before entering in a White new recommendation as far as there are still important open questions on this scheme. In parallel, the study of applicability to CCSDS of the ETSI DVB-S2 standard has to be conducted and measurements have also to be presented as this is also a candidate solution. –  CCSDS MC and the IOAG have asked to limit the number of recommended modulations and coding in order to ensure systems interoperability, but all the new added propositions in Rec are going in the wrong way.

SLS-RFM WG deadlock over CNES’s position (3) –  CNES is worrying about the fact that numerous missions of the others agencies plan to transmit few to ten Mb/s in X band (8025/8400 MHz) instead of using S band (2200/2290 MHz) due to the fact that the S band is already very used (agencies are forced to coordinate themselves). X band is already populated by most of Earth Exploration Satellite Services (40 missions operational and 40 missions planned to be launched before 2015). This migration to X band has to be monitored in order to avoid soon the same coordination problem. Frequency is not unlimited resource so the best effort has to be done by each agency to optimize the most efficiently the use of the band. –  CNES recalls that X band is issued in the Global Monitoring Environment Satellites (GMES) agreement between agencies and is so used for Civil Security services (such as forest fire, floods, …). Interference cases are not acceptable as far as a loss of data may lead to loss of life.

SLS-RFM WG deadlock over CNES’s position (4) –  CNES proposes to set up an Action Item to: –1. Define with accuracy how to compute without any doubt spectral efficiency –2. Define then what is a bandwidth efficient modulation shaping and coding techniques –3. Generate a measurement based snapshot of the different standardized techniques in terms of spectral efficiency and power margin. Then this will be used to recommend without ambiguity adequate separation criteria for applicability of Rec A and Rec

SLS-RFM WG deadlock over Aerospace’s position –Rec needs some changes to align it with SFCG Rec R5 –Since 4D-8PSK TCM is a combined modulation and coding scheme, any other type of coding are not recommended. Therefore for those missions which are more concerned about power efficiency than bandwidth efficiency (such as small aperture ground terminals), more power-efficient codes and/or modulations cannot be accommodated. –Furthermore, those missions which need to be more bandwidth efficient than 4D-8PSK TCM may need to use higher order alphabets such as 16QAM.

SLS-RFM WG deadlock over ESA’s position –ECSS RF & Modulation Standard allows both SRRC-OQPSK and 4D-8PSK TCM for symbol rates higher than 2 Ms/s in the MHz band –ESA is in favour of approving Rec with conventional modulations thereby aligning CCSDS with ECSS –Furthermore, ESA is proposing to add SCCC-8PSK to for missions requiring higher power efficiency than 4D-8PSK TCM for the same spectral efficiency –ESA has participated to the work of DVB-S2 (subject to patents) and does not see any advantage over SCCC-8PSK as shown in the presented ESA paper but does not object to other Agencies’ evaluations

SLS-RFM WG deadlock over Conclusions –WG decided to ask SLS Area Director for guidance on this issue with the aim of progressing the work of the WG –WG suggests that the AD consult with the CESG and/or the CCSDS management council –If in the future WG unanimity as per CCSDS Procedures Manual cannot be reached, how can consensus be interpreted?