Tokyo - Topical Meeting, March 2006 1 Peter-Raymond Kettle Beam Line Update End-Caps End-Caps Insertion System Insertion System Target System Target System.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
A circle is tangent to the x-axis at (-2, 0) and the y-axis at (0, 2). What is the equation of this circle?
Peter-Raymond Kettle MEG Review February Cockcroft-Walton Status Carlo Bemporad Angela Papa Giovanni Signorelli Peter-Raymond Kettle Carlo Bemporad.
Fishing FishingBot is a robot looks like a fish. It can make to bite fishing needle as closing mouth with Servo Motor when Infrared Sensor Board detects.
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Servo ServoBot is a robot that cleans a thing using Servo Motor.
Mössbauer spectroscopy One has to make suitable radioactive precursor having sufficiently long lifetime albeit not too long. Such precursors are made.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
Class exercise 1 Find the equivalent resistance of the following circuit.
Schedule meeting May May 2011 THE DIFFUSER 1.Requirements 2.Description 3.Components 4.Trials 5.Schedule.
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
As viewed by camera 83.0 mm Beamspot at center of target Viewer on downstream side of target ladder (target camera looks upstream) Expt – 74 Kr Beam.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Absorber Production Status Contents (1)MICE absorber design/status (2)MICE absorber instrumentation (3)Schedule (4)Summary Sasanqua at KEK on 13-DEC,’09.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Peter-Raymond Kettle Tokyo - Topical Meeting, March Beam Monitoring Basis for Discussion only Beam Rate Beam Rate Beam Profile Beam Profile Beam.
LG, 15 March 2007 ATB work for 2007 run1  Repair of ‘guillotine valves’  Repair converter (just after T4 TAX – quite radioactive !)  Invert order of.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Peter-Raymond Kettle MEG Review February BeamBeam LineLine StatusStatus.
CLAS12 Drift Chamber Prototyping
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
ENGM 631 Minimum Spanning Tree. Prototype Example Seervada Park Trams route smallest total distance Phone lines minimum spanning tree Tram limitations.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
 1) Introduction  2) GEANT simulations  3) NEW DESIGN : Technology and Assembly  4) Conclusions Reported by G.Feofilov, CBM meetings, Dubna.
XXXIX PANDA COLLABORATION MEETING GSI-DECEMBER 2011 B. GIRAUDO / D. ORECCHINI CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS FIRST APPROACH AND PRELIMINARY.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
PANDA Target Pipe Meeting Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Target Pipe Meeting February 2013.
Air condition installation
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
MEG Review Meeting June Peter-Raymond Kettle Beam Line Line Status StatusBeam Line Line Status Status.
7/8/08 John Amann LC Mechanical Engineering LC 18M W Beam Dump Mechanical Engineering Design Updates.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20071 Beam Schedule Update.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review CCAT Enclosure Nathan Loewen AMEC Dynamic Structures Ltd. 13 July 2005.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
“CENTRAL SUPPORT FRAME” -
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
Francois and Lau EATM 17 July 2012
CLAS12 Beamline Configurations
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
PANDA Yoke of the Magnet
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
New MWPC for CB Status Report Oct 2004
XFEL bunch compressors
I250Y-R: Target Expt –(05/31/2011) Viewer as seen by camera
Equilibrium Of a Rigid Body.
Beam Halo Considerations for Back Angle Running
Electron Ring IP Region Optics
Presentation transcript:

Tokyo - Topical Meeting, March Peter-Raymond Kettle Beam Line Update End-Caps End-Caps Insertion System Insertion System Target System Target System Schedule Schedule

Peter-Raymond KettleTokyo - Topical Meeting, March COBRA End-Caps Complex design He/Vacuum/N 2 /Air interface Complex design He/Vacuum/N 2 /Air interface Materials minimized Al & CH 2 /EVAL (background) Materials minimized Al & CH 2 /EVAL (background) Non-disruptive Access for Insertion System, Non-disruptive Access for Insertion System, Cables, Gas etc. Cables, Gas etc. Upstream End-Cap: Design Completed Downstream: On Schedule virtually completed linked to Insertion System linked to Insertion System USUSDSDSManufacturer Found & Schedule Still as planned USUS DSDS

Peter-Raymond KettleTokyo - Topical Meeting, March Manufacturer specialists in complex welding & structural design AMS-02 spectrometer He-vessel 2500 l Superfluid He for ISS mission 2008 ISS mission 2008 AMS-02 spectrometer He-vessel 2500 l Superfluid He for ISS mission 2008 ISS mission 2008 ISS

Peter-Raymond KettleTokyo - Topical Meeting, March Insertion System Connects to accelerator Beam pipe Gliding support rings NBR RETRACTED into End-Cap Replacewithwindow Gas-tight to He-side CH 2 /EVAL window Gas-tight to He-side CH 2 /EVAL window normally connected to motor-driven accelerator normally connected to motor-driven accelerator beam tube beam tube frictional hand-drive via electric drill/crank-handle frictional hand-drive via electric drill/crank-handle Detailed FEM study Electric-drill or hand drive View from Inside COBRA

Peter-Raymond KettleTokyo - Topical Meeting, March Target System CH 2 or Rohacell Rohacell Various solutions under study: UCI/PSI/KEK UCI/PSI/KEK Permanent Muon Target Rohacell foam/CH 2 combination Rohacell foam/CH 2 combination Complete Rohacell (too thick mm) Complete Rohacell (too thick mm) CH 2 or polystyrene Target + wire frame CH 2 or polystyrene Target + wire frame MOST LIKELY MATERIAL for initial target PE (CH 2 =CH 2 ) a~ 0.15 or Polystyrene C 6 H 5 CH=CH 2 a~ 0.05 Ellipse: 6  major-axis 162 mm, minor axis 60 mm major-axis 162 mm, minor axis 60 mm thickness 150µm CH 2 equivalent thickness 150µm CH 2 equivalent Support from DC frame- rotatable or translational from DC frame- rotatable or translational Prototypes be investigated at UCI Prototypes be investigated at UCI Target orientation Monte-Carlo just about finished Various solutions under study: UCI/PSI/KEK UCI/PSI/KEK Permanent Muon Target Rohacell foam/CH 2 combination Rohacell foam/CH 2 combination Complete Rohacell (too thick mm) Complete Rohacell (too thick mm) CH 2 or polystyrene Target + wire frame CH 2 or polystyrene Target + wire frame MOST LIKELY MATERIAL for initial target PE (CH 2 =CH 2 ) a~ 0.15 or Polystyrene C 6 H 5 CH=CH 2 a~ 0.05 Ellipse: 6  major-axis 162 mm, minor axis 60 mm major-axis 162 mm, minor axis 60 mm thickness 150µm CH 2 equivalent thickness 150µm CH 2 equivalent Support from DC frame- rotatable or translational from DC frame- rotatable or translational Prototypes be investigated at UCI Prototypes be investigated at UCI Target orientation Monte-Carlo just about finished DC Support Structure

Peter-Raymond KettleTokyo - Topical Meeting, March Target Parking In-Beam Position Parked Position DCStructure InsertionBellows Target Parking possible by simple Rotation

Peter-Raymond KettleTokyo - Topical Meeting, March Target Parking cont. DC-extent InsertionBellows Target Simple target Rotation possible possible Shown:  = 0 ̊ Beam 52 ̊ Touching 52 ̊ Touching 80 ̊ Parked 80 ̊ Parked

Peter-Raymond KettleTokyo - Topical Meeting, March Schedule US: Manufacture ~ Beg. May EARLIER??? DS: Manufacture ~ Mid June EARLIER ???