Target 18 Jun. 2008 H. Kanda. To do list Aluminum cell (Type 2 and 3) –Mirapro: Invoices delivered, invoice for the shorter cell was requested PET pipe.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Liquid Hydrogen Absorber
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Progress and Plan for Superconducting RF Cavity RF Group.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 Advanced Technology Reliable Quality Customer Satisfaction Copyright © CALB All Rights Reserved
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
“Move & leave” lens zoom and focus adjustment method. “Move & leave” lens zoom and focus adjustment method. Patent no.: Patent no.:
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Bubble Chamber Experimental Readiness Review September.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
HD target.
HAPEX III / PVDIS Targets Dave Meekins. Target List Loops – LH2 25 cm – LD2 25 cm – 20 cm Spare Solid target – Dummy tgts of correct length – Optics tgt.
RPC production at GT (status and plans). Status After the IFR meeting in Rome a new version of the Production Plan have been proposed to GT Main requirements.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
To do for the next K0 beam time Department of Physics, Tohoku University H. Kanda.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
CLAS12 Drift Chamber Prototyping
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Xenon Detector Installation schedule Satoshi MIHARA.
Preparation of the new target cell 20 Dec H. Kanda.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
WP2 13/07/2011M. Dracos1 Marcos Dracos IPHC-IN2P3/CNRS, Strasbourg.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
S A Griffiths CM42 June 2015 Electrical & Control.
Miscellaneous (いろいろ) 8 Jul Hiroki Kanda.
Integration issues at IHEP
IHEP Cryomodule Status
FourStar 4K x 4K JHK imager
Prototype cryomodule development
Presentation transcript:

Target 18 Jun H. Kanda

To do list Aluminum cell (Type 2 and 3) –Mirapro: Invoices delivered, invoice for the shorter cell was requested PET pipe –Teiyo: delivered, shrinkage test is done, pressure test is under design PET cell –Daiwa can, Teijin chemical, Teiyo U-Varnish –Planar film jig and mold test of mold release agent polymerization method strength test (room temperature / low temperature)  test specimens are ready thickness measurement –Cylindrical film jig and mold thickness measurement SPARE cell (SUS in Type 1 shape) –Mirapro : Delivered in the last week –SUS vs. Upilex adhesive test is under progress (by Kimura) Recovery of k0d2con Buy N2 gas for the valve operation Alignment –monitor with a network camera –moving and tilting the target cryostat (measurement by rulers and levels?) Status monitors

Essences SPARE cell (SUS in Type 1 shape) –Mirapro : Delivered –SUS vs. Upilex adhesive test is under progress (by Kimura) Recovery of k0d2con –Successfully recovered by trying fsck on knoppix thanks to the journaling file system –Monitoring and controlling of the cryostat system was checked and confirmed Buy N2 gas for the valve operation –Already transported into the second exp. hall (1 cylinder for about 6 month operation) –10 litter cylinder can be obtained from Tomoe shokai for the sudden shortage of the gas Alignment –new network camera was delivered –jigs for locating it in the hole in the lower pole were ordered to Chiga-san –moving and tilting the target cryostat (measurement by rulers and levels?) Status monitor for temperature etc. –Knowing the sudden stop of the water pump Pump seems to work continuously more than 1 month! Interlock for the Pair Magnet was checked and confirmed Making the operation procedure for the emergency

Schedule First 10 June Middle 10 June Last 10 June First Half July Latter Half July August OperationTest run with the old cell Test run with the spare cell Experiment Run with the spare cell Test run with the new cell??? Spare cell (SUS) DeliveryAdhesive Pressure test Adhesive test (SUS) ContinueFinalize K0d2conRecovery finished Alignment and monitor Order of camera Delivered Design and order of jigs To be delivered Procedure of alignment Delivery of jigs Mounting of camera Alignment test Alignment PET tubeDesign and order of jigs Delivery of jigs Pressure test U-VarnishDesign of jigs and molds Order of jigs Tension test Agent test Test continued Delivery of jigs Test of polymerization ContinueFinalize? New cell (Aluminum) Invoice for parts OrderDeliveryAdhesive of windows?? Pressure test??

Network camera Zooming of the new network camera worked well! (0.5mm lines can be resolved from a distance of 40 cm) But because it doesn’t have the IR sensitivity, the view in the darkness is very poor.  need an LED illumination? 明るいとき 真っ暗な時 IR view with Corega Camera

Devices connected to the LNS network Several network devices will be installed in the second experimental hall –Video camera for a refrigerator with alcohol –Video camera for the target alignment –Data logger for the status monitor Private addresses or global addresses? –Private address: iptable is needed for the tunneling of the access from the PC out from LNS –Global adress: seamless access – Consult to Dr. Ishikawa or Dr. Yamazaki