Background Approved by SCOH and AASHTO Board of Directors, May 7, 2005 TSP·2 implemented in 3 Phases – 1. Technical Services »Awarded and Contract Executed.

Slides:



Advertisements
Similar presentations
1 Helen Wood, GEO Secretariat Director Secretariat Transition Update.
Advertisements

ROADS PAVEMENT FORUM ROODE VALLEI COUNTRY LODGE PRETORIA 13 November 2001 TECHNOLOGY TRANSFER CENTRES Kenny Kistan.
Medicaid and Vivitrol Strategies in Colorado
Insert software product logo (or name) on slide master AASHTO Civil Rights and Labor Management System Executive Summary.
AASHTO Technical Service Programs: Eligibility for SP&R Match Waiver Jim McDonnell, PE Program Director, Engineering AASHTO Research Advisory Committee.
The Rocky Mountain Pavement Preservation Partnership Lloyd R. Neeley, P.E. Utah Department of Transportation RMPPP Vice-Chair.
Board Brief March 24,  Previous survey conducted 7 years ago  PY assessment requested by President ◦ Conduct a complete review.
ASSIST: Next Generation Making a New ASSIST a Reality CIAC Conference - San Diego, CA April 22 and 23, 2010 Shawn Brick, Glenn Dunkle, Bob Quinn.
2  A nonprofit, nonpartisan association  Represents highway and transportation departments in the 50 states, the District of Columbia, and Puerto Rico.
State and Local Partnership in Research. Research.
TIMELINE August, 2003 Submitted Proposal to develop an Agricultural Innovation and Commercialization Center September, 2003 Awarded 1 of 10 grants for.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Transportation Asset Management A Framework for Successful Performance-Based Planning Michael Bridges, P.E. Undersecretary – Office of Management and Finance.
1 ADSC: The International Association of Foundation Drilling.
Matching Grants. Address humanitarian conditions that benefit a community in need Direct Rotarian involvement Match at least two countries (host and international)
A Health and Medical Coordinating Coalition for Western Massachusetts
Pennsylvania Public Private Transportation Partnerships (P3) Office of Policy & Public Private Partnerships Implementation Manual &
Patty Broers Research Coordination Unit Chief.  “The most serious mistakes are not being made because of wrong answers. The truly dangerous thing is.
1 -WHRP - Serving WisDOT Through Useable Research Presented to WisDOT Regional Offices Spring 2007 By Hussain Bahia, Dan Enz, and Andrew Hanz.
Update of the National Highway Specifications Web Site Ken Jacoby Federal Highway Administration Office of Asset Management August 4, 2009 Chicago, IL.
Review of Staffing Levels
Federal Geographic Data Committee: Coordination Group Meeting Proposal: FGDC Annual Planning Process & Monthly Performance Management Reviews Submitted.
Board of Trustees Orientation September 23, 2014 Dr. George Railey Vice Chancellor of Educational Services and Institutional Effectiveness 1.
AASHTOWare Program Overview to the Safety Data Systems Task Group of the Safety Management Subcommittee Presented by Tony Bianchi, Project Manager AASHTO.
Equipment Working Group. 2 TWG Members Chair: Erle Potter, Virginia DOT Vice Chair: Steve McCarthy, UDOT – (Environmental and Research) Vice Chair: Ron.
HEB Transit: A Two Committee Approach to Stakeholder Involvement James Powell North Central Texas Council of Governments August 4, 2009.
1 Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the TPB Technical Committee Andrew.
ALA FINANCE BEST PRACTICES ASSOCIATION FOR LIBRARY SERVICE TO CHILDREN BUDGET PROCESS 2011 Midwinter Meeting Friday, January 7, 2011.
Transportation Research Board National Cooperative Research Programs RAC 101 July 26, 2010 Kansas City.
LTAP Northeast Region Annual Meeting. May 5-6, 2015 Mystic, CT National Local Technical Assistance Program Association Update.
Jennifer Brandenburg, PE AASHTO Subcommittee on Maintenance Monterey, California July 15, 2008.
FHWA Updates WASHTO Committee on Maintenance Cheyenne, Wyoming March 8, 2010 U.S. Department of Transportation Federal Highway Administration.
Women in Engineering (WIE) Wing-Kam Li R4 WIE Coordinator/ GOLD rep on WIEC Chicago, Jan 2007.
Proposal to Establish the Transportation/Land Use Connection Program Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item 14.
Workforce Productivity Team Phase 1 Update 9/14/2015 Draft for Discussion & Policy Purposes Only1.
TransXML Survey and Scoping Study NCHRP Project Task 295 (2011) Frances Harrison Spy Pond Partners, LLC.
AASHTO Technical Committee on Cost Estimating AASHTO Subcommittee on Design Annual Meeting July 20, 2009 Lesly Tribelhorn, Chair, TCCE.
Managing a Research Program from Various Funding Sources Sandra Larson, P.E. Research and Technology (R & T) Bureau Director Iowa Department of Transportation.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
S C O F A — S T A N D I N G C O M M I T T E E O N F I N A N C E A N D A D M I N I S T R A T I O N H T T P : / / S C O F A. T R A N S P O R T A T I O N.
Transportation Technology Exchange Globally Presented by: Kay Nordstrom U.S. Dept. of Transportation at U.S./East Africa Workshop Arusha, Tanzania August.
AASHTO’s Research Advisory Committee (RAC) and its Role within AASHTO Jim McDonnell, P.E. Program Director, Engineering AASHTO July.
District Assembly Rotary District 5450 Grants June 2, 2012 Presented by Carolyn Schrader Chair, District Grants Subcommittee.
1 Report on the TPB Work Session on the Metropolitan Area Transportation Operations Coordination (MATOC) Program, and Recommendations on Traffic Management.
NASA Shared Services Center National Aeronautics and Space Administration Overview.
Ontario Library Association Super Conference January 29, 2004 Toronto, Ontario.
NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways.
Welcome to the 2015 Annual Meeting.  Michael Bufalino ◦ Oregon Department of Transportation ◦ Research Director.
AASHTO Vision for Highway Safety Joel McCarroll, P.E. AASHTO Chicago, Illinois July 28, 2009.
Comparison of Proposals to Restructure Central Office Administration Owen Maurais Executive Director, PREP February 8, 2007.
Ohio Transportation Planning Conference July 16, 2014.
Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013.
Part-financed by the European Union From application to implementation – the procedures Joint Technical Secretariat Lead Applicant Seminar for 1st application.
Overview of SCOH Strategic Plan AASHTO Subcommittee on Design 2010 Annual Meeting Rick Land, Vice Chair AASHTO Highway Subcommittee on Design and Chief.
What we plan to do and why
Governance and Collaboration By-Laws
ODOT Flexible Funds Program Overview
Enterprise Content Management Owners Representative Contract Approval
Don’t Reinvent the Wheel: Building the Federal Program and Project Management Community of Practice Christie Rewey Project Management Coordination Office,
Pavement Preservation
Executive Sponsor: Marcos Trujillo, Acting Division Director
Transportation Research Board National Cooperative Research Programs
Executive Sponsor: Marcos Trujillo, Acting Division Director
Region X Coordination and Collaboration
Glenn Engstrom, MnDOT Director, Office of Materials and Road Research
Standing Committee on Highways
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
Advancing Pavement Preservation Through Certification
Equipment Management Technical Services Program
ADSC: The International Association of Foundation Drilling
Presentation transcript:

Background Approved by SCOH and AASHTO Board of Directors, May 7, 2005 TSP·2 implemented in 3 Phases – 1. Technical Services »Awarded and Contract Executed with the National Center for Pavement Preservation May 2006 – 2. Pavement Preservation Regional Partnerships »Approved and Executed September 2007 – 3. Bridge Preservation Technical Services and Regional Bridge Preservation Partnerships »Pending Approval

Background Current voluntary contribution is $9,500 for Phases 1 and 2. TSP·2 is financially supported by 38 states and 1 Canadian province TSP·2 worked with Northwestern University & FHWA to cultivate Bridge Preservation

Oversight Panel Steve Varnedoe, NCDOT, Chair Roy Rissky, KDOT, Mississippi Valley Rep. Peter Weykamp, NYSDOT, NASHTO – Rep. John Vance, MDOT, SASHTO – Rep. Tom Raught, NMDOT, WASHTO Rep. Bruce Johnson, ODOT, Subcommittee on Bridges & Structures Judith Corley-Lay, NCDOT, Subcommittee on Design, Joint Technical Committee on Pavements Colin Franco, RIDOT, Subcommittee on Materials Leonard Evans, ODOT, Subcommittee on Transportation Asset Management Jim Sorenson, FHWA Liaison Ken Kobetsky, AASHTO Contact

Preservation Help Desk At least 700 requests for assistance have been received Requests in second year of operation increased by 87% over the first year Topics include: – Preservation Treatments – Application Conditions – Materials – Asset Management

Website and On-line Services Between November 2006 and August 2008 totals approximately 1.6 million hits Monthly hits have increased over 11- fold from November 2006 to August 2008 Bridge Preservation added <1 month ago, have had over 2,000 bridge content hits

Website

Technical Transfer Development, hosting, and staffing of a TSP2 information booth Providing speakers at numerous professional venues across the nation Development of surveys for pavement preservation treatment technologies

Regional Pavement Preservation Partnerships Establishment and facilitation of regional partnerships: – Midwestern – Northeast – Southeastern – Rocky Mountain

Pending AASHTO approval, expand TSP·2 Program to include: – Bridge Preservation Outreach and Help Desk – Bridge Preservation Website and On-line Library – Establish and Facilitate Bridge Preservation Partnerships Next Steps

Proposed voluntary contribution is $20,000 for Phases 1, 2 and 3. (Combined pavements & bridges) Approved use of 100% SP&R funds to cover voluntary contribution (State match not required) RFP for bridge preservation contractor to be developed by TSP·2 Oversight Panel Next Steps