MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &

Slides:



Advertisements
Similar presentations
Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October.
Advertisements

A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Titan-izing the Target Module V.B. Graves 16 Dec 2005.
Data Acquisition Risanuri Hidayat.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Jet Nozzle Analysis M. W. Wendel Oak Ridge National Laboratory February 7-8, 2005.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
CERN Hg Jet System V.B. Graves P.T. Spampinato T.A. Gabriel MUON Collaboration Meeting Lawrence Berkeley National Laboratory February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
MERIT Hg System Final Design Review Hg Target System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Aloha Proof Module Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
SCADA and Telemetry Presented By:.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science.
An Introduction to Real time Systems by Dr. Amin Danial Asham.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
CERN High Power Target Hg Jet Experiment - nTOF11 Facility & Safety Meeting V.B. Graves P.T. Spampinato T.A. Gabriel CERN March 15-17, 2005.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
The complete flow monitoring solution Measure – Display – Switch – Transmit.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
Technology & Engineering Division 1 DAQ for BNL 15 T Pulsed Magnet DATA ACQUISITION FOR PRE-OPERATIONAL TESTING OF BNL-E951 15T PUSLED MAGNET Chen-yu Gung.
Stepper Motor Control, PLC vs VME Herb Strong, Pam Gurd Spallation Neutron Source Oak Ridge National Laboratory October 17, 2007.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Project Example Valves 33 Valves37 Valves 16 Valves 4 Valves 21 Valves 15 Valves 17 Valves31 Valves29 Valves9 Valves\ 22 Valves 30 Valves 19 Valves.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Actuators and Control, Part 5 Grant Agreement No LLP UK-LEONARDO-LMP Project acronym: CLEM Project title: Cloud services for E-Learning.
The complete flow monitoring solution Measure – Display – Switch – Transmit.
Employment of scada system in water purification and transmission system.
Proportional and Servo Valves
Areal RF Station A. Vardanyan
National Centre for Nuclear Research, Poland
Hydraulic control system
Subsystems of EFI Chapter 22 Lesson 2.
Particle Detection System for MERIT
Particle Detection System for MERIT
Presentation transcript:

MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion Center Oct 5, 2005

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 MERIT Collab. Mtg Oct 17-29, 2005 Outline  Operating environment  Requirements / constraints  Power requirements  Instrumentation  Control system scheme  Issues

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 MERIT Collab. Mtg Oct 17-29, 2005 CERN Tunnel Plan View A. Fabich, CERN

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 MERIT Collab. Mtg Oct 17-29, 2005 MERIT Layout TT10 TT2 TT2A ISR (Control Room Location) MERIT Hyd Pump & Controls in TT2

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 MERIT Collab. Mtg Oct 17-29, 2005 TT2A Photos Photos from A. Fabich, CERN Tunnel Width 400cm (158") Width 1.3m (51")

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 MERIT Collab. Mtg Oct 17-29, 2005 Control System Requirements & Constraints  No existing power available in tunnel  Control system mounted on hydraulic pump reservoir  Operator controls 60m away  Will require some level of communication with other control systems (solenoid, beam, diagnostics) and/or a supervisory control system

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 MERIT Collab. Mtg Oct 17-29, 2005 Operating Scenario

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 MERIT Collab. Mtg Oct 17-29, 2005 Power Requirements  Hydraulic pump – 380/460VAC, 50-60Hz, 60A  Proportional control valve – 24VDC  Heater foil – 120VAC  Hg vapor monitor – 120VAC  Instruments – 24VDC

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 9 MERIT Collab. Mtg Oct 17-29, 2005 Minimum Signal Requirements  Trigger (time till pulse)  Ready signal from Hg system  Enable signal from supervisory control system  Also used as abort signal

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 10 MERIT Collab. Mtg Oct 17-29, 2005 Instrumentation & Sensors Controlled Components Hydraulic pump Proportional control valve* Heater foil Analog Sensor Inputs Hg discharge pressure Hg level Hg sump thermocouple Secondary containment thermocouple Cylinder 1 position* Cylinder 2 position Hg vapor 1Hg vapor 2 Hydraulic fluid high pressure Hydraulic fluid low pressure Beam window 1 pressure* Beam window 2 pressure* Digital Sensor Inputs Hydraulic filter dirty switch Hydraulic low level switch Conductivity probe * Critical for system operation or safety

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 11 MERIT Collab. Mtg Oct 17-29, 2005 Proportional Directional Control Valve  Bosch Rexroth 4WREE  Operating pressure: up to 3000psi (210 bar)  Nominal flow: 8.45gpm (32 l/min)  Sensitivity: <= 0.05% (equates to m/sec nozzle velocity)  Supply voltage: +24VDC  Command signal: ±10VDC

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 12 MERIT Collab. Mtg Oct 17-29, 2005 Original Position Sensor  Temposonics G-series linear position sensor  Measured variable: displacement  Measuring range: 2-100in  Repeatability: 0.001% full stroke  Output: voltage or current  Update time: <1ms  Supply voltage: +24VDC  Installed in hydraulic cylinder  Problems: on-board electronics, operates using magnetic field

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 13 MERIT Collab. Mtg Oct 17-29, 2005 Current Position Sensor  Celesco CLWG linear potentiometer  Redundant sensor on cylinder #2  Aluminum body  Voltage divider output  Variable resistor, no on-board electronics  Repeatability < 0.01mm  Linearity 0.05%FS for 450mm range (0.225mm)  Position sensor critical to system control  Piston start/stop locations  Piston position/velocity  Hg flow rate  Jet velocity  Electrical noise may be problem

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 14 MERIT Collab. Mtg Oct 17-29, 2005 LabView-Based Control System  Remote control over long distance limited choices  Analog I/O modules need to be close to equipment and power supplies  LabView controller on laptop computer was chosen  National Instruments recommends CompactPCI I/O modules  Communicates to laptop via EtherNet cable  Allows custom operator interface, data logging if required during development  Should allow straightforward integration with other control systems  Control system development to begin late October

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 15 MERIT Collab. Mtg Oct 17-29, 2005 Procurement  National Instruments hardware & software procured by Princeton  LabView software already procured  Laptop computer provided by BNL  Most instruments specified in Hg delivery system procurement package

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 16 MERIT Collab. Mtg Oct 17-29, 2005 Conclusions  Control system scheme chosen  System development to begin November 2005  Ready when syringe delivered  Most instruments provided with Hg delivery system  Integration with supervisory control system TBD