W E L C O M E Power Grid Corporation of India Limited.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

Appropriate Market Structure of Regional Integration, Pool and Exchange Nepalese Perspective Chandan Kumar Ghosh Assistant Manager, Nepal India Electricity.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Hon’able Members of Standing Committee on Energy WELCOMES POWER GRID CORP. OF INDIA LTD.
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
W E L C O M E Power Grid Corporation of India Limited.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
Evolution of Indian Power Grid Phenomenal expansion since Independence  Generation : 1349 MW 101,866 MW (in 1947) (in 2001)  Grid : Local grid – at.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
POWER GRID CORP. OF INDIA LTD. Dr. Montek Singh Ahluwalia
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Overall National Grid Development: Constraints & Options
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
Transmission Tariff V.Balaji Chief Manager SRLDC.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
UI – ITS MANY AVATARS!. UNSCHEDULE INTERCHANGE It's more than what meets the eye!!!!
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
W E L C O M E Power Grid Corporation of India Limited.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
ENERGY CONSERVATION IN SR - A CASE STUDY
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
Presentation transcript:

W E L C O M E Power Grid Corporation of India Limited

AVAILABILITY BASED TARIFF: EAST SOUTH INTER-REGIONAL LINK TALCHER-KOLAR UNIFIED LOAD DESPATCH SCHEME CHINA EXPERIENCE

AVAILABILITY BASED TARIFF – AN INTRODUCTION CAPACITY AND ENERGY CHARGES - DE-ALIENATED CAPACITY CHARGES LINKED TO AVAILABILITY. ENERGY CHARGES AS PER SCHEDULE. PRICING FOR DEVIATIONS FROM SCHEDULE LINKED TO FREQUENCY

ADVANTAGE ABT. SIMPLE TO IMPLEMENT DOES NOT REQUIRE ANY ADDITIONAL INVESTMENT MAKES USE OF INDUSTRIES PSYCHOLOGY EXHIBITS ALL PROPERTIES OF GAME THEORY. TANGIBLE SHIFT FROM COMMAND AND CONTROL CULTURE TOWARDS CONTRACTUAL CULTURE

MAXIMISATION OF GENERATION AVAILABILITY- MEET MORE CONSUMER DEMAND ECONOMY IN OPERATION – REDUCE COSTS RESULT :- IMPROVED QUALITY OF SUPPLY. HIDDEN CAPACITY HARNESSED. MERIT ORDER IN GENERATION. G GRID DISCIPLINE

POST ABT SCENARIO DRAMATIC IMPROVEMENT IN THE FREQUENCY HYDRO GENERATION OPTIMISED PUMPED STORAGE UTILISED DIURNALLY LOAD CURVE FLATTENED INCREASED BILATERAL TRADING NEYVELI TO PONDY KERALA TO TAMILNADU ER POWER TO WR THROUGH SR EFFICACY OF ABT MECHANISM IS GLOBALLY APPLAUDED. COMPARISION 3D DEMAND EXCERPTS

POST ABT SCENARIO ENHANCED ASSISTANCE TO WESTERN REGION ON OPPORTUNITY BASIS ONCE ABT IS IMPLEMENTED IN EASTERN REGION OTHER REGIONS WOULD FURTHER AVAIL SURPLUS POWER OF EASTERN REGION. COST OF IMPORTS WOULD REDUCE. BILATERAL(FIRM) TRANSACTIONS POISED TO INCREASE. CAPACITY UTILISATION OF GENERATING STATIONS INCLUDING CAPTIVE POWER PLANTS WOULD INCREASE.

AVAILABILITY BASED TARIFF – CHRONOLOGY 1980’sCONCIEVED BY SHRI BHANU BUSHAN DURING HIS TENURE IN NTPC 1991PRESENTED BY POWERGRID AS A SOLUTION FOR TECHNICAL AND COMMERCIAL PROBLEMS IN REGIONAL GRID OPERATION IN INDIA DEVELOPMENT OF SPECIAL ENERGY METERS INITIATED BYPOWERGRID WHICH WAS INSTRUMENTAL FORIMPLEMENTATION OF ABT 1993EXAMINED AND ENDORSED BY WORLD BANK / ADB APPOINTED CONSULTANTS (ECC OF USA) 1994ACCEPTED BY GOVT.OF INDIA.. IMPLEMENTATION DELAYED DUE TO MIS-APPREHENSIONS AND INCONCLUSIVE DISCUSSION 1999REFFERED BY GOI TO CERC JANNOTIFIED BY CERC-DEFFERED DUE TO STIFF OPPOSITION FROM SOME PARTIES 2000DECREVISED NOTIFICATION ISSUED BY CERC- IMPLEMENTATION HELD UP DUE TO STAYS OBTAINED IN HIGH COURT BY SOME SEB’s

: IMPLEMENTED IN WESTERN REGION : IMPLEMENTED IN WESTERN REGION : IMPLEMENTED IN NORTHERN REGION : IMPLEMENTED IN NORTHERN REGION : IMPLEMENTED IN SOUTHERN REGION : IMPLEMENTED IN SOUTHERN REGION

ULDC-THE EYES AND EARS OF THE SYSTEM OPERATOR ALL CONSTITUENTS GET THE SAME DATA IN REAL TIME. TRANSPARENCY. SYNERGY IN OPERATION. NO “PASSING THE BUCK” APPROACH. QUANTUM LEAP IN VISIBILITY TO OPERATOR. INCREASED CONFIDENCE. FOCUS ON SECURITY AND ECONOMY. SOME ULDC PICTURES

ULDC-THE EYES AND EARS OF THE SYSTEM OPERATOR PREMPTIVE, DYNAMIC “EARLY WARNING” SYSTEMS. LOAD ANGLE. ALARMS CONTINGENCY ANALYSIS GRID LESS VULNERABLE TO DISTURBANCES. ANALYSIS OF GRID INCIDENTS – ACCURATE AND EASIER RESTORATION AFTER PERTURBATION BECOMES MUCH FASTER.

ULDC LOAD FORECASTING. LOAD FORECASTING. HYDRO SCHEDULING. HYDRO SCHEDULING. HYDRO THERMAL CO-ORDINATION. HYDRO THERMAL CO-ORDINATION. UNIT COMMITMENT. UNIT COMMITMENT. LOAD MANAGEMENT. LOAD MANAGEMENT.

POST ULDC SCENARIO FREQUENCY OF WR & ER AVAILABLE TO OPERATOR IN SR TO DECIDE WHEN HOW WHERE FROM/TO EXCHANGE POWER OPERATORS OF ALL REGIONS CAN ACT IN CONJUNCTION TO GET THE BEST FOR THE COUNTRY AS A WHOLE.

POST KOLAR HVDC SCENARIO SUBSTANTIAL IMPROVEMENT IN THE VOLTAGE PROFILE FOR THE REGION. TRUNK LINE LOADINGS EASED – INCREASED TRANSFER MARGIN. IMPORT FROM ER AROUND 800 MW M MORE DEMAND CAN BE MET. DEPLETED HYDRO RESERVES CAN BE CONSERVED. AVERAGE COST OF POWER IS BROUGHT DOWN ABOUT 250 MU WORTH RS 40 Cr. IMPORTED FROM ER IN DEC02 INCREASED TRANSACTIONS POWER IS BEING WHEELED FROM ER TO WR VIA SR. TRANSACTION BASED ON DIFFERENTIAL PRICE BETWEEN WR AND SR

MORE TO COME… MW POLE-II LIKELY TO BE COMMISSIONED BY FEB MW POLE-II LIKELY TO BE COMMISSIONED BY FEB-2003 ADDITIONAL POWER TRANSFER BETWEEN ER AND SR ADDITIONAL POWER TRANSFER BETWEEN ER AND SR MORE ROOM FOR WHEELING BETWEEN ER-WR MORE ROOM FOR WHEELING BETWEEN ER-WR VIJAYAWADA-MADRAS LINK IS LIKELY TO BE COMMISSIONED BY FEB 2003 VIJAYAWADA-MADRAS LINK IS LIKELY TO BE COMMISSIONED BY FEB 2003 VOLTAGE PROFILE LIKELY TO IMPROVE FURTHER. VOLTAGE PROFILE LIKELY TO IMPROVE FURTHER. TRUNK LINE LOADING CONSTRAINTS WOULD BE FURTHER EASED. TRUNK LINE LOADING CONSTRAINTS WOULD BE FURTHER EASED. MORE MARGIN FOR TRANSFER FROM ER/WR. MORE MARGIN FOR TRANSFER FROM ER/WR. MORE COMPETITION POSSIBLE AMONGST GENERATORS. MORE COMPETITION POSSIBLE AMONGST GENERATORS. IMPROVED STABILITY. IMPROVED STABILITY.

BACK TO SLIDE

01-JAN JAN-02 FREQUENCY COMPARISION SOUTHERN REGION

02-JAN JAN-02 FREQUENCY COMPARISION SOUTHERN REGION

03-JAN JAN-02 FREQUENCY COMPARISION SOUTHERN REGION

04-JAN JAN-02 FREQUENCY COMPARISION SOUTHERN REGION

05-JAN JAN-02 FREQUENCY COMPARISION SOUTHERN REGION

06-JAN JAN-02 FREQUENCY COMPARISION SOUTHERN REGION

FREQUENCY COMPARISION JAN 2002 AND JAN 2003 JANUARY 2002 JANUARY 2003

RANGEJAN-02JAN TO 50.5 (HZ) 30 %97 % COMPARSON OF FREQ JAN-02 & JAN days

JAN-02JAN-03 ENERGY IN MUs COMPARSON OF KADAMPARI PUMPED ENERGY 20 days

3D VIRTUAL REALITY SR FREQ JAN 03 SR FREQ DEC 02 SR FREQ JAN 02 SR FREQ MAR 02 SR DEMAND JAN 03 SR DEMAND DEC 02 SR DEMAND JAN 02 SR DEMAND MAR 02 AP DEMAND JAN 03 KER DEMAND JAN 03 KAR DEMAND JAN 03 TN DEMAND JAN 03 BLR VOLT JAN 03 SPARE BLR VOLT JAN 02 SPARE