CS 425 December 17, 2008 Shaun Martin Brian Pritchett Team ACME Final Presentation.

Slides:



Advertisements
Similar presentations
Project Title Here IEEE UCSD Overview Robo-Magellan is a robotics competition emphasizing autonomous navigation and obstacle avoidance over varied, outdoor.
Advertisements

Electric Bus Management System
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
DETAILED DESIGN, IMPLEMENTATIONA AND TESTING Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Software Engineering 1. Software development – the grand view 2. Requirements engineering.
<<replace with Customer Logo>>
Intel SECSIMPro Script Editor Proposal Presentation E N S C R Y P T The E N S C R Y P T Team Brian Crampton, Eric Miles, & Yoshani Thiruvilangam.
Intelligent Agents Chapter 2. Outline Agents and environments Agents and environments Rationality Rationality PEAS (Performance measure, Environment,
SCRUM © University of LiverpoolCOMP 319slide 1. SCRUM history In 1986, Hirotaka Takeuchi and Ikujiro Nonaka More an observation of good practise in manufacturing.
Mini Grand Challenge Contest To Enhance CS Education Bob Avanzato Associate Professor of Engineering Penn State Abington 1600 Woodland Road Abington PA.
Robotics and Me Vidyasagar Murty M.S. in Industrial Engineering University of Cincinnati.
AI and Autonomous Vehicles Daniel Landers COMP Intelligent and Interactive Systems 3/10/2007.
Project Planning Dr. Jane Dong Electrical and Computer Engineering.
CSE Design Lab – Milestone 2 James Hopkins Dave Festa Dennis O’Flaherty Karl Schwirz.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Quality is about testing early and testing often Joe Apuzzo, Ngozi Nwana, Sweety Varghese Student/Faculty Research Day CSIS Pace University May 6th, 2005.
Simultaneous Localization and Map Building System for Prototype Mars Rover CECS 398 Capstone Design I October 24, 2001.
CSC230 Software Design (Engineering)
Planning. SDLC Planning Analysis Design Implementation.
Dec09-11 Embedded Systems Design Though Curriculum Jacqueline Bannister Luke Harvey Jacob Holen Jordan Petersen Client: Computer Engineering DepartmentAdvisors:
Μ - CART Microprocessor – Controlled Aerial Robotics Team (Ongo03) An Ongoing Senior Design Project Department of Electrical and Computer Engineering Iowa.
Project Manager: Rajiv Chalasani Mark Goesmann Kevin Staake David Nyman Client : Dr. Lynn Beck Department of Economics.
S/W Project Management
Shaun Martin & Brian Pritchett.  Team Introduction  Problem Definition  The Challenge  Contest Rules  Demonstration  Current Design  Who are the.
Ruslan Masinjila Aida Militaru.  Nature of the Problem  Our Solution: The Roaming Security Robot  Functionalities  General System View  System Design.
Multi-agent Research Tool (MART) A proposal for MSE project Madhukar Kumar.
Feasibility Study.
1 Nassau Community CollegeProf. Vincent Costa Acknowledgements: An Introduction to Programming Using Visual Basic 2012, All Rights ReservedAn Introduction.
Intelligent Agents Chapter 2. CIS Intro to AI - Fall Outline  Brief Review  Agents and environments  Rationality  PEAS (Performance measure,
Project Plan for nSite Central Michael Dunn Ryan Sessions Kyle Kerrigan.
1 R.O.M.P Robot Orientation Mapping Project (Project Plan) Team Evolution Peri Subrahmanya: Lead Designer Michael Lazar: Project Manager Sean Hogan: Lead.
Team Members: Dave Rudolph - Lead Web Designer Lead Programmer Samara Secor - Lead Analyst Documentation Specialist.
Intelligent Ground Vehicle Competition Navigation Michael Lebson - James McLane - Image Processing Hamad Al Salem.
Traffic Management Transit Management Emergency Management Fixed Point-to-Fixed Point Communications Roadway Toll Administration Remote Traveler Support.
Chapter 2 Hande AKA. Outline Agents and Environments Rationality The Nature of Environments Agent Types.
Design Through Curriculum on Embedded Systems Team:Aisha Grieme, Jeff Melvin, Dane Seaberg Advisors: Dr. Tyagi and Jason Boyd Client: Dept. of Electrical.
IEEE Robotics - Requirements Presentation Presented by Jason Abbett and Devon Berry.
A Multidisciplinary Approach for Using Robotics in Engineering Education Jerry Weinberg Gary Mayer Department of Computer Science Southern Illinois University.
University of Windsor School of Computer Science Topics in Artificial Intelligence Fall 2008 Sept 11, 2008.
Design of the New Handy Board for Robotics Using the NI LabVIEW Embedded Module for ADI Blackfin Processor Fred Martin, Assistant Professor, Computer Science.
Intelligent Agents อาจารย์อุทัย เซี่ยงเจ็น สำนักเทคโนโลยีสารสนเทศและการ สื่อสาร มหาวิทยาลัยนเรศวร วิทยาเขต สารสนเทศพะเยา.
The Software Development Process
CHROMATIC TRAILBLAZER 25 th November, 2008 University of Florida, Department of Electrical & Computer Engineering, Intelligent Machine Design Lab (EEL.
Introduction of Intelligent Agents
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Abstract A Structured Approach for Modular Design: A Plug and Play Middleware for Sensory Modules, Actuation Platforms, Task Descriptions and Implementations.
Ali Alkuwari Patrick SwannJad FarahMarcus SchafferKorhan Demirkaya Long QuyDenden TekesteNgoc MaiSteven Weaver.
MSE Presentation 1 Lakshmikanth Ganti
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
Facilimange Dynamics aka “Facilies” CS 425 Final Presentation Curtis McKay Manneet Singh Brad Vonder Haar.
Lesson 3-Multimedia Skills. Overview Members of a multimedia team. Roles and responsibilities in a multimedia team.
The George Washington University Department of ECE ECE Intro: Electrical & Computer Engineering Dr. S. Ahmadi Class 4/Lab3.
 Introduction  What is Driverless Car ?  History  Component  Action  Technology  Advantages  Disadvantages  Conclusion  Reference.
The George Washington University Electrical & Computer Engineering Department ECE 002 Dr. S. Ahmadi Class3/Lab 2.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
1 The Software Development Process ► Systems analysis ► Systems design ► Implementation ► Testing ► Documentation ► Evaluation ► Maintenance.
Abstract Each July, the Association for Unmanned Vehicle Systems International holds an annual International Aerial Robotics Competition (IARC), with major.
Meghe Group of Institutions Department for Technology Enhanced Learning 1.
SCRUM © University of LiverpoolCOMP 319slide 1. SCRUM history In 1986, Hirotaka Takeuchi and Ikujiro Nonaka More an observation of good practise in manufacturing.
CPSC 420 – Artificial Intelligence Texas A & M University Lecture 2 Lecturer: Laurie webster II, M.S.S.E., M.S.E.e., M.S.BME, Ph.D., P.E.
Intelligent Agents. Outline Agents and environments Rationality PEAS (Performance measure, Environment, Actuators, Sensors) Environment types Agent types.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
© 2005 Prentice Hall, Decision Support Systems and Intelligent Systems, 7th Edition, Turban, Aronson, and Liang 6-1 Chapter 6 Decision Support System Development.
The entire system was tested in a small swimming pool. The fully constructed submarine is shown in Fig. 14. The only hardware that was not on the submarine.
Informed Traveler Program and Applications Agile / Scrum Overview Jerry Inberg.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Executive Project Kickoff
Presentation transcript:

CS 425 December 17, 2008 Shaun Martin Brian Pritchett Team ACME Final Presentation

Agenda Project Definition Project Plan High Level Design Prototype Demonstration

Project Definition

Team Introduction Clients Dr. Jerry Weinberg, Computer Science Dr. Ryan Krauss, Mechanical Engineering Dr. George Engel, Electrical Engineering

Team Introduction Shaun Martin Planning Manager Customer Interface Manager Process Manager Quality Manager Documentation Lead Brian Pritchett Design Manager Implementation Manager Testing Manager Support Manager Lead Web Design

Team Introduction Mechanical Engineering Team Lukas Pirok Kevin Doss Kaci Backs Lance Labonte Electrical Engineering Team Greg Eddings Jason Tennyson

Problem Definition Develop an autonomous golf cart to compete in the DARPA Mini Grand Challenge. Navigate pathway on college campus Small and inexpensive short-range vehicles Maximum speed: 5 mph Develop an autonomous vehicle to be used for Human Robot Interaction (HRI) research. Possible User Interface

The Challenge Robot will travel a 7 to 8 foot path with 6 checkpoints. The robot must stop within 2 feet on an obstacle. The final checkpoint is on an unpaved path that the robot must navigate. The total distance of travel will be no longer than 0.5 miles. There will be no markers, lines, or beacons to indicate the path.

The Challenge A robot that stops for more than 60 seconds when not waiting for an obstacle to be removed will be considered “brain dead.” No human contact with the robot is allowed. Robots will also be judged on how it interacts with the crowd.

Contest Rules 1.) Must be powered by batteries (no combustibles). 2.) May be constructed from anything that does not interfere with rule 1. 3.) Must stay between 1 and 5 mph. 4.) Must be able to transport 1 gallon of water. 5.) Must have a clearly labeled stop button or switch. 6.) Should be in the lb range.

Contest Rules 7.) Max size is 216 feet cubed (6 x 6 x 6). 8.) No communication between the robot and an outside device is allowed, except for GPS. 9.) Communication between devices that are part of the robot is allowed. 10.) The robot must be a single entity. 11.) Robots are ground robots. No aerial robots are allowed.

Current Design - Overview GPS (2) -waypoint navigation -intelligent redundancy Camera(s) -path finding -trajectory planning -obstacle avoidance Sonars (4) -obstacle avoidance -trajectory planning -I 2 C bus DC Motor -steering position control -gear reduction for torque -I 2 C bus Linear Actuator -braking position control -I 2 C bus Quadrature Encoders (2) -velocity control -steering position control -I 2 C bus

Who are the Users? Team ACME Professors & students pursuing research in HRI Bystanders during demonstrations

Software Requirements Must be able to run on Windows machine Desired programming language is C++ OpenCV for Image Processing Use APIs developed by ECE team

System Functionality Interface with GPS units for navigation Laser for obstacle avoidance Multi-threaded application Image Processing User Interface for HRI research

Requirements Analysis Interviews with Dr. Weinberg What needs to be done this year? Phone conferences with Ross Mead What sections of code need to be improved? Review of existing code

Project Plan

Software Process - Scrum

Pre-Game Phase Two sub-phases: Planning High level design / Architecture Deliverables: Product backlog Coding / Documentation Standards Design Documents

Development Phase Implements iterative cycles called “Sprints” Sprints consist of: Sprint planning meeting Detailed design Implementation Testing Review

Post-Game Phase Final phase of Scrum Sub-phases: System testing Final Release Deliverables: Final Documentation Working Product

Roles Scrum Master / Product Owner Project manager Interacts with customer Maintains product backlog Scrum Team Primary concerns: sprints Customer Synonymous with client Management Dr. Blythe and Dr. Fujinoki

Software Engineering Methods Version Control Subversion Review Required with Scrum Ranges from informal “desk checks” to inspection reviews Dependent on importance of current sprint

Software Tools TortoiseSVN Free version control system that integrates within the Windows shell Microsoft Project Project management software to assist teams in assigning tasks, managing resources, and assigning workloads Microsoft Visual Studio 2008 Primary IDE used for development OpenCV Open-source cross-platform computer vision library

Testing Plan Unit Testing Individual modules will be tested by developer during sprint Integration Testing Completed sprint product tested with current working product System Testing Fully developed system tested during post-game phase Final testing session prior to final release

Estimation Method Wideband Delphi Estimation Requires that a work breakdown structure be implemented prior to using this estimation method Work breakdown structure for our project will be the product backlog list Kickoff meeting which correlates to our sprint planning meetings. Specific tasks are selected Make individual estimations Worst case, best case, average case are logged. Estimate is the average

Project Timeline TaskDurationStartFinish Orange Cone Interaction12 days12/1/200812/15/2008 Sprint Planning Meeting1 day12/1/2008 Detailed Design3 days12/2/200812/4/2008 Implementation5 days12/5/200812/11/2008 Unit Testing2 days12/12/200812/14/2008 Sprint Review Meeting1 day12/15/2008 Sprint Completed0 days12/15/2008 Integration Testing4 days12/16/200812/19/2008 Obstacle Avoidance12 days1/12/20091/26/2009 Sprint Planning Meeting1 day1/12/2009 Detailed Design3 days1/13/20091/15/2009 Implementation5 days1/16/20091/22/2009 Unit Testing2 days1/23/20091/25/2009 Sprint Review Meeting1 day1/26/2009 Sprint Completed0 days1/26/2009 Integration Testing4 days1/27/20091/30/2009 Velocity Control12 days2/2/20092/16/2009 Sprint Planning Meeting1 day2/2/2009 Detailed Design3 days2/3/20092/5/2009 Implementation5 days2/6/20092/12/2009 Unit Testing2 days2/13/20092/15/2009 Sprint Review Meeting1 day2/16/2009 Sprint Completed0 days2/16/2009 Integration Testing4 days2/17/20092/20/2009

Project Timeline Emergency Shutoff12 days2/23/20093/9/2009 Sprint Planning Meeting1 day2/23/2009 Detailed Design3 days2/24/20092/26/2009 Implementation5 days2/27/20093/5/2009 Unit Testing2 days3/6/20093/8/2009 Sprint Review Meeting1 day3/9/2009 Sprint Completed0 days3/9/2009 Integration Testing4 days3/10/20093/13/2009 Crowd Interaction System12 days3/16/20093/30/2009 Sprint Planning Meeting1 day3/16/2009 Detailed Design3 days3/17/20093/19/2009 Implementation5 days3/20/20093/26/2009 Unit Testing2 days3/27/20093/29/2009 Sprint Review Meeting1 day3/30/2009 Sprint Completed0 days3/30/2009 Integration Testing4 days3/31/20094/3/2009 Remote Drive System12 days4/6/20094/20/2009 Sprint Planning Meeting1 day4/6/2009 Detailed Design3 days4/7/20094/9/2009 Implementation5 days4/10/20094/16/2009 Unit Testing2 days4/17/20094/19/2009 Sprint Review Meeting1 day4/20/2009 Sprint Completed0 days4/20/2009 Integration Testing4 days4/21/20094/24/2009 System Testing17 days4/6/20094/27/2009

Project Timeline – Sample Sprint

Risk Analysis RiskLikelihoodCostPlan Temporary loss of team member 10%7 days-redistribute roles New contest rules20%3 days -revisit high level design -add new rules to product backlog list Delays due to other teams70%7 days -consult client -work on tasks that are independent of other team -consult upper management -conduct team meeting Interface with existing system 80%7 days -study existing code prior to integration -consult last year’s team Sensor failure25%3 days -debug code -check electrical system -consult ECE team Steering failure25%3 days-consult ME team Hardware failure15%2 days-consult teams -redesign if legacy hardware is needed

Coding and Documentation Name and author(s) at top of each file. A brief description Required files will be listed. Above each function prototype, a brief description of the function will be included. Above each function definition, a more detailed description of the function will be included. Inputs, outputs, and return types will be listed, including a brief description of how they will be used.

Coding Example // // ostream& <<(out, th) // Last modified: 14Feb2008 // // Outputs the parameterized thread to the parameterized output file stream. // // Returns: the output file stream // Parameters: // out in/out the output files stream // th in/out the thread to output // ostream& operator <<(ostream &out, const Thread_t &th) { out << th.getName() << " [" << th.getID() << "]"; return out; } // <<(ostream &, const Thread_t &)

Conflict Resolution Procedure The group member with the issue will present their problem to the other team member. The two will attempt to come to an agreement. If no agreement can be made, the group will approach upper management for a resolution.

Ethical Considerations We will do our best to produce solid code that completes the project that is agreed upon between us and our client. We will not take credit for code written by previous teams. We will not take credit for code or work done by teams we are working with.

High Level Design

PEAS Description PEAS – Performance, Environment, Actuators, Sensors Used to determine what type of agent will be used, robot control system, and robot architecture Agent TypePerformance Measure EnvironmentActuatorsSensors Autonomous Golf Cart Safe, successful navigation to desired waypoint following competition standards Campus pathways, students, other traffic, various obstacles Steering, accelerator, brakes, display Camera, Sonar, Outdoor laser, GPS, motor sensors, keyboard

Task Environment Partially observable Sensors do not provide complete state of environment Stochastic Hard to keep track of all unobserved aspects Next state cannot be determined based on current state Dynamic Environment is constantly changing Continuous Environment is constantly changing over time Multi-agent Sequential Previous actions can impact current actions

Goal-based Agent

High Level Design Robot Control Behavior-based Control System Robot exhibits many “behaviors” Allows for modularity and iterative development Robot Architecture Subsumption Architecture reactive robot architecture heavily associated with behavior-based robotics Emulates concurrency

Finite State Machine Model

Subsumption Architecture Model

Current Product Backlog TaskPriority Orange Cone Interaction1 Obstacle Avoidance2 Velocity Control3 Emergency Shutoff System4 Flag System (demonstration or competition) 5 Crowd Interaction6 Remote Drive7 Improved User Interface8

Current Product Backlog TaskPriority Orange Cone Interaction1 Obstacle Avoidance2 Velocity Control3 Emergency Shutoff System4 Flag System (demonstration or competition) 5 Crowd Interaction6 Remote Drive7 Improved User Interface8

Prototype Demonstration

Questions?