RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Dec
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Windows Server 2008 R2 Oct 2009 Windows Server 2003
Jan 2016 Solar Lunar Data.
Update on the SVD construction

T1 status (a selection from EDR presentations)
MicroMegas Mechanical Meeting --- Cern April 2014
Baltimore.
Analyzing patterns in the phenomena
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Apr-Jun Jan-Mar Jul-Sep Oct-Dec



Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
CMX scope and functionalities

Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16

Step 3 Step 2 Step 1 Put your text here Put your text here
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat

©G Dear 2008 – Not to be sold/Free to use
Electricity Cost and Use – FY 2016 and FY 2017

Unemployment in Today’s Economy

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2

TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun

Globus-M2 will be constructed by the end of 2015
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Proposed core price & service spec L1 product milestone 31 Dec 2019
Change Management E2E Roadmap
Presentation transcript:

RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined with the LAB in Praha New Test LAB in Geneva University…

RP Card 1 st PCB Card with elect. components: functionality tested OK (see Gueorgui/Walter) Production of Kapton cards started Optimization of lamination process on support board to ensure good planarity

Assembly ( with DT2 ): tools Being finalized Manual positioning of the card vs support with XYΘ stage and 3D CMM Different glues under test

Assembly: packaging First exercise of packaging made with the thermo-mechanical mockup

Assembly: Mechanical decoupling Vacuum flange/ detector package decoupler Loading Springs Reference for Detector Package to Pot

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Temperature Cycling of thermomechanical prototype Consolidate design produce drawings Geometrical precision test Mechanical components order CE07 parts fabricate special parts prepare pipework / feedthroughs (incl. leak test) fabricate interface card flanges fabricate pot hats (Vacuum Praha) follow-up / reception Tooling gluing tools bonding tools detector assembly tools pipework bending/testing tools Hybrid lamination Chip mounting/ bonding Testing Sensor mounting/ bonding Testing Detector assembly Metrology Integration in pots Testing (incl. cooling) beam ? availability hybrid PCB/VFAT (tested) availability sensors (tested) availability interface card (tested) Installation in zone holiday period Test Results Thermo- mechanical prototype Full Integrated Module (10 planes + complete electronics). Extended lab tests. Beam test ? Preparation work area end of access to underground areas X-mas closure conceptual tests DT2 D/T TOTEM Internal Review TOTEM Bondlab TOTEM DT2 D DT2 2T TOTEM DT2 T 2T TOTEM Bondlab TOTEM 2T TS/DEM DT2 D/T TOTEM detector  pot insertion tool 1D, 1T Courtesy by C. Joram