E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Advertisements

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D on Cavity Integration and Test H. Hayano,
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
● Offer the reliable system to the Asian regional facility STF. ● Improve TTF design and demonstrate in the beam line for RDR / TDR. ● Establish industrial.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
S1G Experiment Schedule Plan
Status and plans for the 3.9 GHz section of XFEL
ILC10 Beijing Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S1-G cryomodule assembly status
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
KEK injector cryomodule
IHEP Cryomodule Status
Construction and First Coo-down Test of cERL Injector Cryomodule
TTC meeting at Milano, 2011' Feb. .28
TTC meeting, Milano Global Design Effort
Presentation transcript:

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 2 INFN FNAL Angelo Bosotti Serena Barbanotti Rocco Pararella Carlo Pagani Arrival date in Japan ; 7 th Feb Departure date ; (FNAL) 12 th Feb (INFN) 13 th Feb Stay in Urban Hotel for 5 nights (FNAL) 6 nights (INFN) Tuner Assembly Team for S1-Global

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 3 08 Mon; am. Visit at STF, Check of Tuner Parts pm. INFN/FNAL/KEK meeting for tuner assembly 09 Tue; am. / pm. Assembly of Blade tuners for 2 FNAL cavities 10 Wed; am. / pm. Assembly of Saclay tuners for 2 DESY cavities night Welcome party for INFN/FNAL colleagues 11 Thu; National Holiday am. Spare day for tuner & mag. shield assembly pm. Preparation of hanging cavities on GRP 12 Fri; am. Alignment of hanging cavities pm. INFN/FNAL/KEK meeting for next step Rough Schedule of Tuner Assembly

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 4 Package from FNAL Big Box from FNAL was delivered at KEK in 27 th, January. Warm part couplers and components, Blade Tuners, Magnetic shields, Ti 2-phase pipes and bellows, Copper cooling straps, etc.

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 5 Package from DESY Big Box from DESY was delivered at KEK in 1 st, February. Warm part couplers and components, Saclay Tuners, Magnetic shields, Ti 2-phase pipes and bellows, Copper cooling straps, etc.

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 6 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping system Up stream Down stream FNAL#1,#2 AES004, ACC011 DESY#1,#2 Z108, Z109 KEK#1,#2 MHI05, MHI06 KEK#3,#4 MHI07, MHI09

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 7 Eight Cavities for S1-G ; HLRF Cavity Type of Tuner (Location) 1. AES-004 (29.4 MV/m) ; Blade tuner (center) 2. ACC-011 (33.3 MV/m) ; Blade tuner (center) 3. Zanon-108 (31.3 MV/m) ; Saclay tuner (end) 4. Zanon-109 (30.7 MV/m) ; Saclay tuner (end) 5. MHI-05 (27.1 MV/m) ; Slide-Jack tuner (center) 6. MHI-06 (27.7 MV/m) ; Slide-Jack tuner (center) 7. MHI-07 (33.6 MV/m) ; Slide-Jack tuner (end) 8. MHI-09 (27.0 MV/m) ; Slide-Jack tuner (end) Average = 30.0 MV/m

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 8 Cavity Q ext P 30MV/m 1. AES-004 (HT) 5.9 x W 2. ACC x W 3. Zanon x W 4. Zanon x W 5. MHI x W 6. MHI x W 7. MHI x W 8. MHI x W Eight Cavities for S1-G ; LLRF

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 9 Cavity as received after string assembly (vacuum) (Ar gas 1 bar) 1. AES-004 (Ar) ( ) MHz 2. ACC MHz 3. Zanon MHz 4. Zanon MHz 5. MHI MHI MHI MHI Cavity Measured by K. Watanabe

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 10 Cavity Eacc,max(VT) Po(cw) Po( 5Hz ) 1. AES x MV/m 117 W 0.9 W 2. ACC x MV/m 144 W 1.2 W 3. Zanon x MV/m 106 W 0.8 W 4. Zanon x MV/m 76 W 0.6 W 5. MHI x MV/m 103 W 0.8 W 6. MHI x MV/m 163 W 1.3 W 7. MHI x MV/m 247 W 2.0 W 8. MHI x MV/m 192 W 1.5 W Eight Cavities for S1-G ; Cryogenics Estimated cavity dynamic Eacc,max (5Hz)  total 9.1 W

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 11 He Jacket Welding of 4 KEK cavities MHI-Kobe 2010, Jan. 29 MHI-05 MHI-07 MHI-06 MHI-09

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 12 Cavity string assembly of KEK cavities Feb. 15 ~ ; class-1000 clean room Cleaning and setting of support posts Feb. 22 ~ ; class-1000 clean room Cleaning and disassembly of 4 input couplers Cleaning and setting of 4 KEK cavities Preparation of Gate-valve, Taper & 3 Bellows Mar. 01 ~ ; class-10 clean room String assembly of 4 KEK cavities Leak check, Ar gas slow leak up to 1 atm Mar. 08 ~ ; outside of clean room Tuner assembly and Alignment of 4 cavities

E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 13 Coupler Assembly for S1-Global DESY Denis Kostin KEK Eiji Kako Work at KEK from 15 th to 23 th in March. Assembly of warm couplers for 2 FNAL cavities. Assembly of warm couplers for 2 DESY cavities One warm coupler for AES004 cavity from FNAL will be delivered till the end of February.