Compressor status AWAKE Technical Board meeting 19 August 2015.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
Chubaka Producciones Presenta :.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
Compressor status AWAKE Technical Board meeting 19 May 2015.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
UED ASTA Mechanical Mechanical Design Status Eric Bong 20 May 2014.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Calendar for 2011 Months of the Year with Holidays.
EDR of the TOTEM Roman Pots - CERN - 24 November 2005 Beniamino Di Girolamo - CERN PH/ATT ATLAS Roman Pots at IR1 Beniamino Di Girolamo CERN.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Update on the Laser Beam Line
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
The months of the year January February. The months of the year March April.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
TBTS Test Program & Schedule G. Riddone
AWAKE Technical Board, 19 August E. Gschwendtner, CERN.
Michał Matusiak Sławomir Wronka
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Teleconf ACS – FREIA 28th March 2017
AWAKE e-spectro update
News about the WA104 Programme
Progress with Experimental Vacuum Chambers
Diffuser status October 2017
Far Detector Activities Late 2017 – Early 2018
X-ray Pump-Probe Instrument
Teleconference ACS – FREIA 20th February 2018
February 2007 Note: Source:.
Two-beam Test-stand Design and Construction Status
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
2015 January February March April May June July August September
Presentation transcript:

Compressor status AWAKE Technical Board meeting 19 August 2015

Technical Offers from Amplitude Technology February 2015 – “Standard” vacuum chamber D=1500 mm April 2015: – Space limitation of CERN installation taken into account: “Reduced size” vacuum chamber D=1300 mm is offered June 2015: – Compressor vacuum chamber is ordered July 2015: – Offer for optical compressor agreed 18 August 2015: – 3D-drawing of the compressor chamber received for approval Details in EDMS document

Design of compressor chamber for CERN by Amplitude

First coupling of AMPLITUDE and CERN drawings (today by Nicolas Chritin) To be checked by integration team

Heights of beams Heights for optical tables defined: H table = 875 mm Quotation requests sent to 3 firms: Thorlabs, Opta, Newport

Tentative schedule  Study in the research department to adapt the position of the window: four (4) weeks.  Manufacturing at the supplier’s site: seventeen (17) weeks, including summer holidays.  Test at Amplitude Technologies: two (2) weeks  Packing: one (1) week.  Installation on-site: one (1) week.  Compatible with 6 months delivery order if the order is placed soon. Time for transport is not considered. Order in June -- > Delivery in December From now => end of December January of February ?

Essentials form the compressor optics offer

Content of the Amplitude compressor package  The vacuum vessel with external diameter of Ø1300 mm.  The support to hold the vacuum vessel (height to be defined).  The internal breadboard and the support to accommodate the mechanical mounts of the compressor.  The place for four windows (input beam, output beam, diagnostic beam, and leak).  The place for the vacuum pumps (two flanges) and two flanges for the detectors.  A test report of the vacuum compatibility of the vacuum chamber will be supplied following Amplitude Technologies quality process (inspection of the vacuum chamber with mass spectrometer for the detection of pollutant).  The installation on-site is included (two days). The optical compressor with the optical components (including the windows) and the mechanical mounts are not included. The vacuum pump, the detectors and the controllers are not included and will be integrated by the purchaser.

New layout of vacuum vessel